BLD-Final | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2014 | 8/28/2014 | 8/28/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 8/25/2014 | 8/27/2014 | 8/27/2014 | A | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Hole in sheetrock above water heater.
|
BLD-Energy code compliance | 6/18/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Jim Storey
|
|
|
CLINT Phone #: ###-####
|
BLD-Framing/Rough-in | 6/17/2014 | 6/19/2014 | 6/19/2014 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall no plans or truss engineering on site and fire place not installed
|
BLD-Wall Bracing | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Dave Hannah
|
|
|
Gilly Phone #: ###-####
|
Plan Reviewer's activity | | | 2/14/2014 | | DONE |
Jason Blais
|
|
|
Materials Testing & Inspection (MTI) has provided an engineered report on adequacy for the compressive strength of the foundation. Test methods included a combination of collecting core specimens and use of the rebound hammer method for actual and correlated strength results. Report also noted a visible inspection of the foundation indicating no visible evidence of freezing bleedwater and the opinion the foundation possesses adequate strength and hardness for the intended use. The MTI report is attached to this case.
|
BLD-Foundation | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PART |
Tom Arcoraci
|
|
|
Advardo Phone #: ###-#### pending ok from spec inspection engineer due to cold weather
|
BLD-Footing | 12/6/2013 | 12/6/2013 | 12/9/2013 | P | FAIL |
Dave Hannah
|
|
|
Wes Phone #: ###-#### on friday 11/6 ground was frozen crew removed frozen sub grade with picks and shovels air temp is 21deg crew useded a 6bag mix temp of concrete in forms at time of place ment 55deg crew covered with one R5 insulating blankit avg temps were below 20 with lows of 4 on sunday and -7 on monday
|
Issue PAID IN FULL permit | | | 10/21/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 10/11/2013 | | |
|
|
|
|
Application received | | 10/2/2013 | 10/11/2013 | | DONE |
|
|
|
|
Telephone call | | | 10/11/2013 | | DONE |
Tisha Gallop
|
|
|
called Tahoe Homes and left vm permit is ready and fee.
|
Inspection Record Card- Bld | | | 10/11/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/11/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JG) | 10/2/2013 | 10/2/2013 | 10/10/2013 | | PASS |
Javier Guzman
|
|
|
Due 10/15 L1-
|
Routing - PLAN CHECK | 10/9/2013 | | 10/10/2013 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/10/2013 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 10/10/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2013 | | DONE |
|
|
|
|
Routing - MECHANICAL | | | 10/9/2013 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/3/2013 | | 10/7/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 10/7/2013 | | 10/7/2013 | | PASS |
Leon Letson
|
|
|
|
Route to Impact Fee Review | 10/2/2013 | 10/7/2013 | 10/3/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 10/2/2013 | 10/5/2013 | 10/3/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 10/2/2013 | | 10/3/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Intake Approval | | | 10/2/2013 | | PASS |
|
|
|
|