Second Notice | | 5/15/2014 | 5/15/2014 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 4/7/2014 | 5/5/2014 | | DONE |
|
|
|
mailed
|
Permanent Occupancy | | | 3/28/2014 | | DONE |
|
|
|
|
BLD-Final | 3/25/2014 | 3/26/2014 | 3/26/2014 | P | PASS |
Dave Hannah
|
|
|
Aaron Phone #: ###-####
|
FIRE-Final Inspection | 3/21/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed. Need to post "door to remain..." signage at the main entry per review notes prior to structural final.
|
BLD-Ceiling Grid Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Jim Sly
|
|
|
Please call ahead for access - 20min - Aaron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/20/2014 | 2/20/2014 | 2/20/2014 | P | PASS |
Dave Hannah
|
|
|
Aaron Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/19/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 1/23/2014 | 1/23/2014 | 1/27/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
my review completed 1/24/14 On the Fly Deli - Deferred Submittal
|
Routing - MECHANICAL | 1/23/2014 | | 1/27/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/23/2014 | | 1/24/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
duct termination revision
|
Plan assigned to (AJS) | 12/3/2013 | 12/3/2013 | 1/3/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
review comments returned- ePlanReview - On the Fly Deli - Deferred Submittals
|
Routing - PLAN CHECK | 1/3/2014 | | 1/3/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
see sheet A3.0 for unprotected penetration in rated wall
|
CHANGE STATUS TO (ISS) | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 1/2/2014 | | 1/2/2014 | | PASS |
Troy James
|
|
|
See red note to sheet M-1.
|
Routing - MECHANICAL | 12/24/2013 | | 12/24/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to architect and engineer
|
Routing - PLAN CHECK | 12/19/2013 | | 12/20/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
unprotected opening in 2 hour rated wall needs to be addressed see change marks
|
Routing - MECHANICAL | 12/19/2013 | | 12/20/2013 | | FAIL |
Troy James
|
|
|
eplan and left message with architect.
|
Routing - MECHANICAL | 12/13/2013 | | 12/12/2013 | | FAIL |
Troy James
|
|
|
Changed rotisserie to a VGG-16 model. Type 1 hood is now required. I have conerns with the rotisserie being a nuisance in regards to the odors with cooking. Type 1 hood will alleviate the grease, steam and odor. See eplan for additional comments.
|
Routing - PLAN CHECK | 12/3/2013 | | 12/5/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Penetration in 2 hour wall not show on this revision. Design has changed. No building issues with current submitted mechanical design. Will review resubmittal.
|
Routing - MECHANICAL | 12/3/2013 | | 12/5/2013 | | FAIL |
Troy James
|
|
|
eplan
|
Plan Reviewer's activity | | | 12/5/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
email sent to Jeff 12/5/13
Jeff, the review for the deferred submittals is complete and I am sending the task back to you. I have attached the comments below for you. As the Zenergy permit has now been issued you may contact Hattie at ###-#### to request a copy of the mechanical plans. They are electronic not paper plans so they are readily available through the public records request.
Mechanical Review-
1.Floor plan A2.0 is still showing griddle. Need to remove. 2.Sheet M2.0 is showing new detail with dishwasher under hood. I am confused if you actually are meaning the steam jacket kettle. Please clarify. 3.Need to have equipment schedule sheet A3.0 to reflect what is actually being installed. Still showing equipment that has not been deleted. 4.The Zenergy Athletic Club plans have been issued. The building permit # is BLD13-02585. Please access this drawing and submit drawing to reflect correct placement of exhaust tie in. 5. Need something in writing that you have talked to the tenant for Zenergy and they are okay with on the fly deli terminating their exhaust into their system. 6.Note 14 sheet M-1 no longer applies. Need to be deleted. 7. IMC section 506.4 states that type 2 hood shall be exhausted independently to the exterior. 8. Sorry for not noticing this in my previous reviews, but the rotisserie oven that is on the equipment schedule is required to have a type 2 hood over it. 9.Need to show on plans how you will make up the air being exhausted.
Building Review-
Penetration in 2 hour wall not show on this revision. Design has changed. No building issues with current submitted mechanical design. Will review resubmittal.
Please let me know if you need any assistance or questions.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####
|
Pending Assignment by JCB | 12/3/2013 | | 12/3/2013 | | DONE |
Jason Blais
|
|
|
|
Print Occupancy Form | | | 12/2/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 11/29/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 11/27/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (AJS) | 10/21/2013 | 10/21/2013 | 11/25/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 11/14Level 3 TI - On the Fly Deli in 8th & Main
|
Routing - PLAN CHECK | 11/22/2013 | | 11/25/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Penetration in 2 hour wall NOT approved. Deferred submittals to be recieved to address code requirements for penetration. Code review for items releated to the IBC will be required on items deferred. 11/25/13 ajs
|
Routing - MECHANICAL | 11/22/2013 | | 11/25/2013 | | PASS |
Troy James
|
|
|
Bath exhaust and hood exhaust is deffered submittal. No work on these items until approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2013 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 11/12/2013 | | 11/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
see e plan for sigh off by Briggitta
|
Routing - FIRE | 11/12/2013 | 11/12/2013 | 11/12/2013 | | PASS |
Craig D. Hanson
|
|
|
See Report
|
1st review completed | | | 10/25/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 10/21/2013 | | 10/25/2013 | | FAIL |
Troy James
|
|
|
eplan
|
Routing Off Site - C.D.H | 10/21/2013 | | 10/25/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Brigetta failed in e plan
|
Routing - PLAN CHECK | 10/21/2013 | | 10/25/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed my comments and fire comments to jeff
|
Routing - PLUMBING | 10/21/2013 | | 10/25/2013 | | PASS |
Bill VanDegrift
|
|
|
signed off in e plan
|
Routing - FIRE | 10/21/2013 | 10/21/2013 | 10/23/2013 | | FAIL |
Craig D. Hanson
|
|
|
May require Hood system, Fire dampers and needs to update dates and other info on coversheet
|
Routing - Addressing | 10/21/2013 | | 10/23/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 10/22/2013 | | 10/23/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 10/22/2013 | | 10/22/2013 | | PASS |
Walt Baumgartner
|
|
|
Food prep area connected to common shell core grease line, OK
|
Routing - PUBLIC WORKS | 10/21/2013 | | 10/22/2013 | | PASS |
Beverly Mountain
|
|
|
|
Payment Received | | | 10/18/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 10/18/2013 | | PASS |
Jason Blais
|
|
|
Prescreen approved by John Menard and plan review fees paid on 10/18/13.
|
Application received | | | 10/2/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 2 2013 1:51PM
|