Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD13-02724
StatusFinaled
Name CORNERSTONE CONTRACTORS LLC
Site Address 10483 W OVERLAND RD
Project NameAUTOZONE RACKING
Customer Number 
ePlanReviewNo
Description
(AUTOZONE – STORE #6221 – RACKING ONLY) This building has a fire sprinkler system. To install maximum 12 foot tall steel storage racks and display gondolas within the storage area and within the retail sales area of a 6,817 square foot retail sales tenant space. Tenant improvement work was done under permit BLD13-01876. The racks and their installation are required to comply with RMI/ANSI MH 16.1-2008. Hilti Kwik TZ anchors are required for base plates as specified on the drawings. Periodic Special Inspection is required during anchor installation. The provisions of ICC Evaluation Report ESR-1917 are required to be followed. The work is required to comply with the approved drawings, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/10/20145/13/2014 DONE
This permit finaled on the web by Kari LeGresley
Third Notice 4/6/20145/5/2014 DONE
mailed
Third Notice 3/8/20144/1/2014 DONE
mailed
Second Notice 2/6/20143/3/2014 DONE
DetailsChristina Prado
mailed 3-4-14
First Notice1/7/20141/7/20141/27/2014 DONE
DetailsMike Jordan
BLD-Final1/6/20141/7/20141/7/2014APASS
DetailsMike Jordan
Chris Breheny Phone #: ###-####
DOC - Permit Finaled1/7/20141/7/20141/7/2014PPASS
DetailsMike Jordan
FIRE-Final Inspection1/6/20141/7/20141/7/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Final1/6/20141/6/20141/6/2014PNR
DetailsMike Jordan
chris Phone #: ###-####. Needs fire/life/safety first.
Issue PAID IN FULL permit  11/4/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  11/4/2013 DONE
DetailsTisha Gallop
Plan assigned to (AJS)10/14/201310/14/201310/14/2013 DONE
DetailsAdele J Schaffeld-Griffin
Level 2 TI - Racking (10 days - Oct 16)
Plan assigned to (CJW)10/3/201310/3/201310/14/2013 DEFR
DetailsCarl Westfall
Reassigned to Adele Schaffeld-Griffin - Level 2 TI - Racking (10 days - Oct 16)
Routing - PLAN CHECK10/14/2013 10/14/2013 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK10/7/2013 10/14/2013 DEFR
DetailsCarl Westfall
Reassigned to Adele Schaffeld-Griffin.
1st review completed  10/14/2013 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  10/14/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  10/14/2013 DONE
Inspection Record Card- Bld  10/14/2013 DONE
DetailsTisha Gallop
Telephone call  10/14/2013 DONE
DetailsChristina Prado
Called Seizmic Engineering to advise permit is ready pending GC and gave fees due
Permit Ready to Issue  10/14/2013 DONE
DetailsChristina Prado
Routing - FIRE10/3/2013 10/7/2013 PASS
DetailsCraig D. Hanson
No Comments
Intake Approval  10/3/2013 PASS
DetailsJason Blais
Pending Assignment by JCB10/3/2013 10/3/2013 DONE
DetailsJason Blais
Application received 10/2/201310/2/2013 DONE
DetailsBarbara Stitt