Permit Information
Permit NumberBLD13-02725
StatusFinaled
Name LEVEL CONSTRUCTION LLC
Site Address 2119 W OVERLAND RD
Project NameRiver's Edge Church
Customer Number 
ePlanReviewYes
Description
(RIVER’S EDGE CHURCH – Enterprise Electric Bldg #1) This building is not fire sprinklered and must maintain an occupant load of less than 300 in the fire area. To convert a 5,500 square foot office / warehouse tenant space into a new church. Work is to include: construction of interior non-bearing walls to expand the existing women’s restroom, new plumbing, new elevated platform, new exterior door, installation of new accessible doors / hardware, and new interior finishes. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/13/20143/20/2014 DONE
First Notice 2/3/20143/3/2014 DONE
DetailsChristina Prado
mailed 3-4-14
Permanent Occupancy  1/24/2014 DONE
DetailsTisha Gallop
BLD-Final1/9/20141/10/20141/13/2014PPASS
DetailsJim Storey
jason Phone #: ###-#### PLEASE CALL BEFORE GOING OUT
FIRE-Final Inspection1/9/20141/10/20141/10/2014APASS
DetailsForrest France
Noted correction items are finished. Fire life safety finaled.
FIRE-Final Inspection12/23/201312/23/201312/27/2013PPART
DetailsForrest France
Final pending repairs for the existing fire alarm system.
BLD-Final12/5/201312/6/201312/6/2013APART
DetailsJim Storey
andy Phone #: ###-#### handrail ends/ada signage/ mirrior height/temp ok
FIRE-Final Inspection12/4/201312/4/201312/5/2013PPART
DetailsForrest France
Items noted include; repair EM light at the north hall, reverse door hardware at one location, existing non-required fire alarm system must remain operational or be removed as discussed.
Zoning Approval12/3/201312/3/201312/3/2013 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in11/15/201311/15/201311/15/2013PPASS
DetailsTom Arcoraci
andy PLEASE CALL FOR ACCESS Phone #: ###-####
Permit Ready to Issue  11/14/2013 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  11/14/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  11/14/2013 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  11/12/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)10/7/2013 11/12/2013 PASS
DetailsTim L. Woodard
ePlanReview - Level 3 TI - River's Edge Church
Routing - FIRE11/7/2013 11/8/2013 PASS
DetailsCraig D. Hanson
Refer to Fire report revision 1
Routing - PLAN CHECK11/7/2013 11/7/2013 PASS
DetailsTim L. Woodard
Routing - FIRE10/7/201310/7/201310/28/2013 FAIL
DetailsCraig D. Hanson
See Fire Review Report
1st review completed  10/24/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK10/7/2013 10/24/2013 FAIL
DetailsTim L. Woodard
Refer to change marks on the drawings. TLW
Routing - PLANNING10/7/2013 10/24/2013 PASS
DetailsSue Cummings
Sue Cummings - CUP13-00027 Approved in E-plan by Sue. TLW
Routing - Addressing10/7/2013 10/7/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/7/2013 10/7/2013 PASS
DetailsBeverly Mountain
Plan Reviewer's activity  10/7/2013 DONE
DetailsJason Blais
Emailed architect to have her contact ACHD for evaluation of any impact fees. Written verification from ACHD is required to be provided to our Permit Counter prior to the building permit being issued.
Routing PW Sewer Rating10/7/2013 10/7/2013 PASS
DetailsConnie Baumgartner
Intake Approval  10/7/2013 PASS
DetailsJason Blais
Prescreen passed by Tim Woodard on 10/4/13. Plan Review Fees paid on 10/7/13.
Pending Assignment by JCB10/7/2013 10/7/2013 DONE
DetailsJason Blais
Payment Received  10/5/2013 DONE
Payment received via Govolutions
Application received  10/2/2013 DONE
Application submitted via PDS Online on Oct 2 2013 3:18PM