Third Notice | | 11/15/2014 | 11/11/2014 | | DONE |
|
|
|
This permit finaled on the web by Megan Swift
|
Third Notice | | 10/11/2014 | 11/10/2014 | | DONE |
|
|
|
mailed to WBTBC
|
Second Notice | | 9/7/2014 | 10/6/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | 7/24/2014 | 7/24/2014 | 8/28/2014 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 7/23/2014 | 7/24/2014 | 7/24/2014 | A | PASS |
Jim Sly
|
|
|
Arrielle Phone #: ###-####
|
DOC - Permit Finaled | 7/24/2014 | 7/24/2014 | 7/24/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/18/2014 | 7/21/2014 | 7/21/2014 | A | FAIL |
Mike Jordan
|
|
|
Please call Arrielle prior to arrival. ###-#### Phone #: ###-#### Inspection requested via web by Kjell Ooms. Provide code compliant door hardware at the st. al"s main door. All other atreas ok.
|
BLD-Final | 7/17/2014 | 7/18/2014 | 7/18/2014 | P | NR |
Jim Sly
|
|
|
Please call Arrielle prior to arrival. ###-#### Phone #: ###-#### Inspection requested via web by Kjell Ooms Need Fire Sprinkler final
|
FIRE-Final Inspection | 7/17/2014 | 7/18/2014 | 7/18/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/15/2014 | 7/16/2014 | 7/16/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide indicator, provide sticker, test emergency lighting, add exit sign, repair exit sign and remove the thumbturn dead bolt.
|
BLD-Ceiling Grid Inspection | 7/3/2014 | 7/7/2014 | 7/7/2014 | A | PASS |
Jim Sly
|
|
|
Please call prior to arrival. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms
|
BLD-Framing/Rough-in | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | PART |
Jim Sly
|
|
|
Please call before arrival Phone #: ###-#### >> Inspection requested via web by Kjell Ooms St Als thearapy area.......OK
|
CHANGE STATUS TO (ISS) | | | 5/6/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | 4/7/2014 | 4/7/2014 | 4/30/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan mod YMCA
|
Routing - PLAN CHECK | 4/17/2014 | | 4/30/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 4/30/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/30/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/30/2014 | | DONE |
Christina Prado
|
|
|
called Chris to advise permit is ready and gave fee due
|
Permit Ready to Issue | | | 4/30/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/28/2014 | 4/29/2014 | 4/29/2014 | A | PART |
Tom Arcoraci
|
|
|
Partial - Shell Phone #: ###-#### tri ath area ok
|
FIRE-Final Inspection | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | PART |
Troy Cobbley
|
|
|
Tri-Club area life safety passed. As per discussion the deadbolt lock located in the path of egress will need to be removed.
|
BLD-Ceiling Grid Inspection | 4/23/2014 | 4/23/2014 | 4/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
kjell Phone #: ###-####
|
Routing - FIRE | | | 4/21/2014 | | PASS |
|
|
|
See Fire Plan Review Mod 04-21-14
|
Routing - PLUMBING | 4/17/2014 | | 4/18/2014 | | PASS |
Bill VanDegrift
|
|
|
per pland and ISPC
|
Routing - PUBLIC WORKS | 4/17/2014 | | 4/17/2014 | | PASS |
Beverly Mountain
|
|
|
No fees due. bam
|
Plan Modification Accepted | | | 4/7/2014 | | DONE |
Christina Prado
|
|
|
Received plan mod application to build out future St AL's Therapy Studio. Reveiced two sets of revised plan sheets as follows as well as two sets of structural calcs and apps. Sheets effected are A0.00, A0.01, A0.02, A0.03, A1.01, A2.01, A2.02, A2.04, A2.51, A3.02, A3.03, M1.11, M2.11, M3.00, P0.00, P1.00, P2.11, E2.0L, E2.0P & E3.00;Plans taken to Adele for furthure review
|
BLD-Framing/Rough-in | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | PART |
Jim Sly
|
|
|
Please call Kjell prior to arrival at number above. Meet in main lobby. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms Tri Club Room Wall......OK
|
BLD-Final | 1/20/2014 | 1/21/2014 | 1/21/2014 | A | PART |
Jim Sly
|
|
|
Call Kjell at above number with any questions. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms OK to occupy cross fit and yoga rooms.
|
BLD-Final | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PEND |
Jim Sly
|
|
|
Please contact Kjell with any questions. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms OK for Temp Occ.....Pending Troy C........Fire/life and Fire alarm...approved.
|
BLD-Ceiling Grid Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Jim Sly
|
|
|
Please schedule for late afternoon to accommodate inspections prior. Contact Kjell. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms
|
FIRE-Final Inspection | 1/16/2014 | 1/17/2014 | 1/17/2014 | P | PART |
Troy Cobbley
|
|
|
The Crossfit and Yoga rooms are ok to occupy.
|
FIRE-Final Inspection | 1/17/2014 | 1/17/2014 | 1/17/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need ceiling tile installed so that I can final the sprinkler permit. Fire alarm permit needs to be finaled as well. Need the emergency lights repaired.
|
BLD-Conference | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | DONE |
Jim Sly
|
|
|
Would like to discuss future phasing and temp occupancy. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms
|
BLD-Ceiling Grid Inspection | 1/10/2014 | 1/13/2014 | 1/10/2014 | A | CANC |
Jim Sly
|
|
|
Please call for directions to work area. Phone #: ###-#### >> Inspection requested via web by Kjell Ooms Inspection cancelled from web by: Kjell Ooms
|
(F) Reprint permit | | | 12/20/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/20/2013 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 12/19/2013 | 12/19/2013 | 12/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/19/2013 | | 12/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2013 | | DONE |
|
|
|
|
Additional plans submitted | | | 12/19/2013 | | DONE |
|
|
|
defered submittals - Sheets A2.31; A2.41 & A2.51
|
BLD-Framing/Rough-in | 12/9/2013 | 12/10/2013 | 12/10/2013 | A | PART |
Jim Sly
|
|
|
As early as possible Phone #: 2087894859 >> Inspection requested via mobile web by Kjell Ooms North wall next to existing wall, walls around storage room and (East/West) demising wall OK to cover.
|
Issue PAID IN FULL permit | | | 11/13/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 10/17/2013 | 10/17/2013 | 10/28/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 10/16 Recieved 10/17
|
Routing - PLAN CHECK | 10/28/2013 | | 10/28/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 10/28/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/28/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/28/2013 | | DONE |
Christina Prado
|
|
|
Called Chris to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 10/28/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 10/23/2013 | | |
|
|
|
Received 2 copies of sheets A0.03, and A3.01 and taken to Adele's desk
|
1st review completed | | | 10/21/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/9/2013 | | 10/21/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent to Chris 10/21/13
Chris, Please see the attached comment in regards to the YMCA renovation, BLD13-02740
This building is classified as a Type IIA building. Please revise the yoga wall shown on sheet A3.01 detail A13 to meet the requirements of IBC section 803.11.1
803.11 Application of interior finish materials to fire-resistance-rated structural elements.
Where interior finish materials are applied on walls, ceilings or structural elements required to have a fire-resistance rating or to be of noncombustible construction, they shall comply with the provisions of this section.
803.11.1 Direct attachment and furred construction.
Where walls and ceilings are required by any provision in this code to be of fire-resistance-rated or noncombustible construction, the interior finish material shall be applied directly against such construction or to furring strips not exceeding 13/4 inches (44 mm) applied directly against such surfaces. The intervening spaces between such furring strips shall comply with one of the following:
1. Be filled with material that is inorganic or noncombustible;
2. Be filled with material that meets the requirements of a Class A material in accordance with Section 803.1.1 or 803.1.2; or
3. Be fireblocked at a maximum of 8 feet (2438 mm) in any direction in accordance with Section 717.
803.11.2 Set-out construction.
Where walls and ceilings are required to be of fire-resistance-rated or noncombustible construction and walls are set out or ceilings are dropped distances greater than specified in Section 803.11.1, Class A finish materials, in accordance with Section 803.1.1 or 803.1.2, shall be used except where interior finish materials are protected on both sides by an automatic sprinkler system in accordance with Section 903.3.1.1 or 903.3.1.2, or attached to noncombustible backing or furring strips installed as specified in Section 803.11.1. The hangers and assembly members of such dropped ceilings that are below the main ceiling line shall be of noncombustible materials, except that in Types III and V construction, fire-retardant-treated wood shall be permitted. The construction of each set-out wall shall be of fire-resistance-rated construction as required elsewhere in this code.
If you have any questions please let me know.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
Plan assigned to (CDM) | 10/7/2013 | 10/7/2013 | 10/17/2013 | | DEFR |
Carl D Madsen
|
|
|
Defered to Adele
|
Routing - PUBLIC WORKS | 10/7/2013 | | 10/9/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 10/8/2013 | | 10/9/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/8/2013 | | 10/8/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 10/7/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet A0.01; taken to Carl Madsen.
|
Plans ACCEPTED BY PLAN TECH | | | 10/3/2013 | | |
|
|
|
10-3-13 Ok per Carl M to take in as a level 2
|
Application received | | 10/3/2013 | | | |
|
|
|
|