BLD-Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
BLD-Blower Door Test Results | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Phil Shearer
|
|
|
4.61
|
DOC - Permit Finaled | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/9/2015 | 2/11/2015 | 2/11/2015 | A | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall Needs fireblocking above the fireplace. OK to insulate
|
BLD-Wall Bracing | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | PASS |
Phil Shearer
|
|
|
Luna Phone #: ###-####
|
BLD-Foundation | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PASS |
Phil Shearer
|
|
|
pouring at 3 - Juan Phone #: ###-####
|
BLD-Footing | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PASS |
Phil Shearer
|
|
|
pouring at 3 - Juan Phone #: ###-####
|
BLD-Footing | 11/25/2014 | 11/25/2014 | 11/25/2014 | A | FAIL |
Phil Shearer
|
|
|
No inspection was requested by the contractor. The contractor was told that ground (subgrade) was to muddy and had 7" of standing water in some places witch made it unsuitable and that they are not to place any concrete until the ground has become stable and passes inspection. The footing concrete was placed on unstable muddy ground and with out inspection. Special inspection is required. A stop work order has been placed
|
BLD-Footing | 11/20/2014 | 11/21/2014 | 11/21/2014 | A | FAIL |
Phil Shearer
|
|
|
Wes Phone #: ###-#### Frozen ground
|
BLD-Footing | 11/13/2014 | 11/13/2014 | 11/13/2014 | P | CANC |
Phil Shearer
|
|
|
request at 1pm// Juan Phone #: ###-####
|
BLD-Footing | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | FAIL |
Phil Shearer
|
|
|
Juan ###-####
pour tim 3:00 Inspection requested via web by tony L. Ground is frozen
|
BLD-Footing | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | NR |
Phil Shearer
|
|
|
Juan//pour time around 4:30pm Phone #: ###-####
|
BLD-Footing | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | CANC |
Phil Shearer
|
|
|
-Foreman-Juan ###-#### -Planning on pouring at 1:00
Thank You! Phone #: ###-#### Inspection requested via web by tony L
|
Issue PAID IN FULL permit | | | 10/22/2014 | | DONE |
|
|
|
|
Extend Review Timeline | | | 9/12/2014 | | DONE |
Christina Prado
|
|
|
final extension request approved
|
Expiration Notice | 9/8/2014 | 9/29/2014 | 9/8/2014 | | DONE |
Christina Prado
|
|
|
|
Extend Review Timeline | | | 3/18/2014 | | DONE |
Christina Prado
|
|
|
180 day extension 3/18/14
|
OVERRIDE | | | 10/17/2013 | | |
|
|
|
|
Telephone call | | | 10/17/2013 | | DONE |
Barbara Stitt
|
|
|
Called and left message that permit is ready & fees due on 10-17-13 @ 8:55am//BAS
|
Inspection Record Card- Bld | | | 10/17/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (JG) | 10/8/2013 | 10/8/2013 | 10/16/2013 | | PASS |
Javier Guzman
|
|
|
Due 10/21 L1
|
Routing - PLAN CHECK | 10/14/2013 | | 10/16/2013 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/16/2013 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 10/16/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2013 | | DONE |
|
|
|
|
Routing - MECHANICAL | 10/9/2013 | | 10/14/2013 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 10/8/2013 | 10/11/2013 | 10/9/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 10/7/2013 | 10/10/2013 | 10/9/2013 | | PASS |
James McMahon
|
|
|
|
Routing - Addressing | 10/8/2013 | | 10/9/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 10/9/2013 | | 10/9/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 10/9/2013 | | 10/9/2013 | | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 10/7/2013 | 10/8/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/8/2013 | | DONE |
|
|
|
|
Intake Approval | | | 10/8/2013 | | PASS |
|
|
|
|