Permit Information
Permit NumberBLD13-02788
StatusFinaled
Name JSC INVESTMENTS
Site Address 280 S CAPITOL BLVD
Project NameWashington Federal
Customer Number 
ePlanReviewNo
Description
(WASHINGTON FEDERAL) Application for inspection to determine the requirements for the issuance of a certificate of occupancy on an existing 18,465 sq. ft. building previously occupied by Bank of America. The building consists of a 4,865 sq. ft. basement utilized for storage, a 5,500 sq. ft. first story and a 8,100 sq. ft. second story. No new work is allowed under this permit. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  7/3/2014 DONE
DetailsChristina Prado
BLD-Final6/30/20146/30/20146/30/2014PPASS
DetailsDave Hannah
Gabriel Q Phone #: ###-####
Temporary Occupancy6/9/20149/7/20146/9/2014 DONE
DetailsTisha Gallop
BLD-Final6/5/20146/6/20146/6/2014APART
DetailsDave Hannah
Gabriel Phone #: ###-#### ok for temp occ needs to key lock front door
FIRE-Final Inspection6/5/20146/5/20146/5/2014PPASS
DetailsForrest France
Panic hardware at the south exit doors is satisfactory. The north pair of exit doors still needs to have the manual thumbturn removed and provided with keyed locking hardware per IBC conditions- to be verified by structural inspector for compliance prior to final as discussed.
FIRE-Final Inspection3/31/20143/31/20143/31/2014PPART
DetailsForrest France
Final pending door hardware at the main entry/exit as discussed. Verified annual certification of the existing fire sprinkler system.
BLD-Final3/18/20143/19/20143/20/2014PNR
DetailsDave Hannah
Andrea Phone #: ###-#### needs fire final first
FIRE-Final Inspection3/18/20143/19/20143/19/2014AFAIL
DetailsForrest France
Items noted include; repair exit signs at the basement level, provide approved hardware at the main entry/exit doors, the fire sprinkler system is overdue annual certification.
Issue PAID IN FULL permit  3/18/2014 DONE
DetailsTisha Gallop
Plan assigned to (CDM)10/9/201310/9/201310/21/2013 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/21/2013 10/21/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/21/2013 DONE
Case Summary (BLD)  10/21/2013 DONE
Print Occupancy Form  10/21/2013 DONE
Permit Ready to Issue  10/21/2013  
Telephone call  10/21/2013  
10-21-13 called Andrea Wilson permt ready for pick up ///dld
Routing - PLAN CHECK10/9/2013 10/16/2013 FAIL
DetailsCarl D Madsen
Additional inforemation is required. Called Andrea Wilson 1-16-13
1st review completed  10/16/2013 FAIL
Application received 10/9/201310/9/2013 DONE
Plans ACCEPTED BY PLAN TECH  10/9/2013 DONE
DetailsTisha Gallop
First Notice 7/13/2014