Permanent Occupancy | | | 8/21/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 8/4/2014 | 8/4/2014 | 8/4/2014 | A | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/5/2014 | 6/5/2014 | 6/5/2014 | A | FAIL |
Jim Storey
|
|
|
hardware not compliant from c/n isued prevously/ open ele and bld permits no insp. work complet
|
BLD-Final | 3/18/2014 | 3/19/2014 | 3/19/2014 | P | FAIL |
Jim Storey
|
|
|
Andrea Phone #: ###-#### need keyed lock at entry
|
FIRE-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed. Need to remove the manual thumbturn at the main entry/exit and replace with a key operated device prior to structural final as discussed.
|
Print Occupancy Form | | | 3/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 3/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 10/17/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/17/2013 | | |
|
|
|
|
Telephone call | | | 10/17/2013 | | |
|
|
|
10-17-13 called Andrea permit ready for pick up ///dld
|
Plan assigned to (CDM) | 10/9/2013 | 10/9/2013 | 10/16/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/9/2013 | | 10/16/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/16/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/16/2013 | | DONE |
|
|
|
|
Application received | | 10/9/2013 | 10/9/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/9/2013 | | |
|
|
|
|
First Notice | | 8/31/2014 | | | |
|
|
|
|