Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-02810
StatusFinaled
Name CLEARY BUILDING CORP
Site Address 12400 W MCMILLAN RD
Project NameCentennial High School
Customer Number 
ePlanReviewNo
Description
(CENTENNIAL HIGH - Indoor Practice Batting Facility) To construct a new 3,024 square foot indoor batting facility for baseball and softball near the Southwest corner of the school property. This building is constructed of pressure treated (3) ply 2X6 columns, steel wall panels, 2X6 horizontal wall girts flat to columns, double wood girder trusses at 8' o.c., and prefinished metal roofing. Work to include: Construct the pre-engineered pole frame building per plans; construct a stable, firm, and slip resistant accessible route; install interior means of egress and exterior exit discharge lighting; and related site improvements. All work per the approved plans, engineering, attached plan review report, and all other reviewing agencies approvals. This building is not fire sprinkled. All construction shall be per the approved plans, Engineering, and attached comment list. A new Certificate of Occupancy with the occupant load total is to be issued when completed and approved prior to tenant occupying this building. This structure does not have fire sprinklers. CUP13-00041 **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/13/20143/6/2014 DONE
DetailsChristina Prado
received 3-6-14
First Notice 2/2/20143/3/2014 DONE
DetailsChristina Prado
mailed 3-4-14
Permanent Occupancy  1/23/2014 DONE
DetailsChristina Prado
BLD-Final1/22/20141/23/20141/22/2014APASS
DetailsJim Sly
Dave Phone #: ###-####
OK for Perm Occ.
BLD-Final1/16/20141/17/20141/17/2014ANR
DetailsJim Sly
dave Phone #: ###-####
Need Mech. final. Dave says..... Brian from P/W signed card.
PubWorks Occupancy Approval1/17/20141/17/20141/17/2014 DONE
DetailsBrian Murphy
approved for perm occupancy per Brian Murphy
BLD-Framing/Rough-in1/15/20141/15/20141/15/2014PPASS
DetailsJim Sly
dave Phone #: ###-####
Zoning Approval1/15/20141/15/20141/15/2014 PASS
DetailsTodd Tucker
BLD-Final1/13/20141/14/20141/14/2014PNR
DetailsJim Sly
Daniel late pm if possible Phone #: ###-####
Need Public works, Mech, and Zoning Finals.
FIRE-Final Inspection1/14/20141/14/20141/14/2014PPASS
DetailsTroy Cobbley
Life safety passed. Curtains have not been installed yet to verify unobstructed access. I spoke to the contractor about the requirements per the approved drawings.
FIRE-Final Inspection1/13/20141/13/20141/13/2014PFAIL
DetailsTroy Cobbley
Provide exit signs and exit discharge lighting as per the approved plans
BLD-Footing12/19/201312/20/201312/20/2013APASS
DetailsJim Sly
dave Phone #: ###-####
Issue PAID IN FULL permit  11/26/2013 DONE
OVERRIDE  11/20/2013  
Application received 10/10/201311/20/2013 DONE
Telephone call  11/20/2013 DONE
DetailsTisha Gallop
called Brian Smith and left vm permit is ready, fee due, need ACHD and RP.
Print Occupancy Form  11/20/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  11/20/2013 DONE
DetailsTisha Gallop
Routing - FIRE11/15/201311/15/201311/19/2013 PASS
DetailsCraig D. Hanson
Approved, no changes
Routing - PLAN CHECK11/19/2013 11/19/2013 PASS
DetailsJason Blais
For Sam Zahorka.
PLANS/APPL TAKEN TO FRONT DESK  11/19/2013 PASS
DetailsJason Blais
Plan assigned to (SRZ)10/10/2013 11/19/2013 PASS
DetailsSam Zahorka
1st review completed. (CHS Batting Facility)
Routing - PLAN CHECK11/14/2013 11/15/2013 PASS
DetailsSam Zahorka
Routing - PUBLIC WORKS11/12/2013 11/14/2013 PASS
DetailsConnie Baumgartner
Routing PW Drainage11/14/2013 11/14/2013 PASS
DetailsBrian Murphy
Routing - PLAN CHECK11/12/2013 11/12/2013 PASS
DetailsSam Zahorka
Routed to Public Works.
Routing - Erosion and Sediment11/7/2013 11/12/2013 PASS
DetailsEvan Jenkins
ESC Resubmittals received for you to review. They moved the building location.

Passed per Evan with ESC
Case Summary (BLD)  11/12/2013 DONE
DetailsSam Zahorka
Case Summary (BLD)  11/12/2013 DONE
DetailsSam Zahorka
Plan resubmittals received  11/8/2013 DONE
DetailsChristina Prado
Received 3 sets of revised plan sheets marked 1 of 7, 2 of 7, 3 of 7 & 4 of 7;taken to Sam for further review
Routing - PLANNING11/6/2013 11/7/2013 PASS
DetailsTodd Tucker
New Site Plan with building location changed.
Routing - PLAN CHECK10/29/2013 11/6/2013 PEND
DetailsSam Zahorka
Pending resubmittals. Routed to Planning.
Plan resubmittals received  11/5/2013  
11-5-13 received 1 transmittal letter,3- erosion and sediment control plans,3-stormwater drainage reports,& 3 copies of sheets C1,C2 sent to Sam Z
Telephone call  11/4/2013 DONE
Question from B Smith regarding hose lay, I stated that it is OK to plan the lay of the hose through a gate. This will allow them to shiftbuilding over to be within 400'
Plan Reviewer's activity  11/1/2013 DONE
DetailsScott Arellano
Revised plan review report conditions of approval. SJA
Telephone call  10/31/2013 DONE
Spoke with B Smith (architect) explained to him that the hydrant across the street is to far away and it crosses a major road that the FD will not lay a hose to. Explained to him that what ever the emergency notification system is inside the school it needs to be extended to the new building. Discussed adding either a hydrant or sprinklers to achieve Fire Flow
Routing - FIRE10/17/201310/10/201310/30/2013 CANC
DetailsCraig D. Hanson
routed to fire out of turn, sent to plans check. 10/17
Routing - FIRE10/29/201310/29/201310/29/2013 FAIL
DetailsCraig D. Hanson
Please see attached letter
1st review completed  10/29/2013 FAIL
Failed: Fire, Structural, Plan Check, Public Works
Routing Off Site - STRUCTURAL10/28/2013 10/29/2013 PASS
DetailsSam Zahorka
Routing - PLAN CHECK10/18/2013 10/29/2013 FAIL
DetailsSam Zahorka
Plan resubmittals received  10/28/2013 DONE
DetailsChristina Prado
received three sets of revised structural review comments;taken to Sam for further review
Telephone call  10/28/2013 DONE
DetailsChristina Prado
calle Action Couriers for pick up
Routing Off Site - STRUCTURAL10/10/2013 10/22/2013 FAIL
DetailsSam Zahorka
Routing - Erosion and Sediment10/16/2013 10/17/2013 PASS
DetailsEvan Jenkins
Routing - PUBLIC WORKS10/10/2013 10/16/2013 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy for drainage issues.
Routing PW Drainage10/11/2013 10/16/2013 FAIL
DetailsBrian Murphy
SYSTEM BIO RETION
Telephone call  10/10/2013 DONE
DetailsChristina Prado
called Action Couriers for pick up
Routing - PLANNING10/10/2013 10/10/2013 PASS
DetailsTodd Tucker
Routing - PLANNING Land Div10/10/2013 10/10/2013 PASS
DetailsDave Abo
Routing - Addressing  10/10/2013 PASS
Plans ACCEPTED BY PLAN TECH  10/10/2013 DONE
DetailsChristina Prado
Intake Approval  10/10/2013 PASS
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  10/10/2013 DONE
DetailsChristina Prado
Pending Assignment by JCM10/10/2013 10/10/2013 DONE
DetailsJohn Menard