Second Notice | | 11/13/2014 | 11/10/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | 10/17/2014 | 10/17/2014 | 11/3/2014 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 10/15/2014 | 10/17/2014 | 10/17/2014 | A | PASS |
Jim Sly
|
|
|
Please call and let me know when you may be there. Thank you. Phone #: ###-#### Inspection requested via web by Darin Thornton
|
DOC - Permit Finaled | 10/17/2014 | 10/17/2014 | 10/17/2014 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | FAIL |
Troy Cobbley
|
|
|
Went to job site but contractor could not meet me at the same time and also need the fire sprinkler permit called in for inspection.
|
FIRE-Final Inspection | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | FAIL |
Troy Cobbley
|
|
|
Need small documents provided. Need sprinkler protection verified on both sides of new wall as per the review comments as well as a fire alarm permit for the relocated manual pull station
|
BLD-Energy code compliance | 1/24/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Jim Sly
|
|
|
Joe-Please call prior to insepction Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Jim Sly
|
|
|
Call ahead for directions - Joe Phone #: ###-####
|
Inspection Record Card- Bld | | | 1/15/2014 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 12/23/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/23/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/23/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/23/2013 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 11/7/2013 | 11/7/2013 | 12/10/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 11/21 Level 3 TI - HP Chiller Remodel-Addition
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/4/2013 | | 12/9/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 12/9/2013 | | 12/9/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - Addressing | 12/4/2013 | | 12/5/2013 | | FAIL |
Jason C. Taylor
|
|
|
Applications still need updated to reflect correct address for Building #8. Jason Taylor ###-####
|
1st review completed | | | 11/21/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 11/7/2013 | | 11/21/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Route to Impact Fee Review | 11/7/2013 | 11/13/2013 | 11/15/2013 | | PASS |
Cindy M. Gould
|
|
|
No impact fees charges are under the $50.00 threshold
|
Routing - Design Review | 11/7/2013 | | 11/14/2013 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - I signed off on the permit.
|
Routing - FIRE | 11/7/2013 | 11/7/2013 | 11/12/2013 | | PASS |
Scott Arellano
|
|
|
|
Routing - PUBLIC WORKS | 11/7/2013 | | 11/12/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - MECHANICAL | 11/7/2013 | | 11/12/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 11/7/2013 | | 11/8/2013 | | PASS |
Bill VanDegrift
|
|
|
over flow relocation ok
|
Routing - Addressing | 11/7/2013 | | 11/8/2013 | | FAIL |
Jason C. Taylor
|
|
|
Address is incorrect for Building #8 (#8 is 11331 W Chinden Blvd). Please update all applications, drawings, and submitals to reflect correct address. Jason Talyor ###-####.
|
Routing - Erosion and Sediment | 11/7/2013 | | 11/8/2013 | | PASS |
Evan Jenkins
|
|
|
|
Pending Assignment by JCB | 11/7/2013 | | 11/7/2013 | | DONE |
Jason Blais
|
|
|
|
Payment Received | | | 11/6/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 11/6/2013 | | PASS |
Jason Blais
|
|
|
Adele Schaffeld-Griffin passed the prescreen and plan review fees paid.
|
Intake Approval | | | 10/15/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete the 502 check list for the small addition to this commercial building. Please upload all of the additional documents required in the check list.
Please re name and up load sheet to the approved naming standards. A0.0 Cover sheet
This project will be routed as on addition after the pre screen is approved.
Thank you
|
Application received | | | 10/10/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 10 2013 12:50PM
|