DOC - Permit Finaled | | | 12/31/2013 | | DONE |
|
|
|
NO PERM OCCUPANCY ISSUED-tenant moved out and was only issued a temp occupancy 12-31-13 pdf
|
BLD-Other | 12/19/2013 | 12/30/2013 | 12/30/2013 | A | PASS |
Dave Hannah
|
|
|
Dave-please verify that Farmers Market is out of there so that we can close this temp occupancy. Karen ###-#### They have moved out biulding is emty
|
Telephone call | | | 12/19/2013 | | DONE |
Barbara Stitt
|
|
|
Call from Karen Ellis-The Farmers Market has 12/21/13 to do sales then they will be out be for Christmas. When spring comes they will open up in the parking lot. So, I will send the building inspector out on 12/30/13 to verify that business is closed in order to close this temp occupancy out. 12-19-13 @ 12:20pm///BAS
|
BLD-Final | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Dave Hannah
|
|
|
Karen phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Forrest France
|
|
|
Inspection passed per conditions indicated on permit documents.
|
Temporary Occupancy | 11/8/2013 | 2/6/2014 | 11/8/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 11/1/2013 | 11/1/2013 | 11/4/2013 | P | PEND |
Dave Hannah
|
|
|
KAREN PLEASE CALL BEFORE GOING OUT Phone #: ###-#### ok to hold market saterday
|
FIRE-Final Inspection | 11/1/2013 | 11/1/2013 | 11/1/2013 | P | PART |
Forrest France
|
|
|
|
Telephone call | | | 11/1/2013 | | DONE |
Tim L. Woodard
|
|
|
Called and left message for Karen Ellis to remind her to call in for reinspection this afternoon so she can still open as needed on November 2nd. TLW
|
FIRE-Final Inspection | 10/28/2013 | 10/29/2013 | 10/29/2013 | P | FAIL |
Forrest France
|
|
|
Items noted include; provide current service tags on fire extinguishers, install barrier to second floor access per plan review notes, provide fire sprinkler system monitoring with offsite reporting, vendor booths and area division are not yet in place. One exit sign repaired while on site. Discussed door holds, general conditions, project schedule.
|
FIRE-Conference | 10/29/2013 | 10/29/2013 | 10/29/2013 | A | DONE |
Forrest France
|
|
|
Regarding conditions for occupancy
|
BLD-Final | 10/28/2013 | 10/29/2013 | 10/29/2013 | P | NR |
Dave Hannah
|
|
|
Karen Phone #: ###-####
|
Plan assigned to (TLW) | 10/16/2013 | | 10/28/2013 | | PASS |
Tim L. Woodard
|
|
|
Farmers Market Temp use
|
Routing - PLAN CHECK | 10/28/2013 | | 10/28/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with notes from Fire (Tom Gainer) and Building (Tim W.) on plans. Applicant must comply with all redlines or occupancy is void. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/28/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 10/28/2013 | | DONE |
|
|
|
|
Telephone call | | | 10/28/2013 | | |
|
|
|
10-28-13 called Karen Ellis permit ready for pick up ///dld
|
Permit Ready to Issue | | | 10/28/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/28/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 10/10/2013 | | 10/14/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 10/14/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (AJS) | 10/10/2013 | 10/10/2013 | 10/13/2013 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
1st review completed draft letter sent to Jason for review
|
Plans ACCEPTED BY PLAN TECH | | | 10/10/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/10/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 10/10/2013 | | | |
|
|
|
|