BLD-Final | 12/12/2013 | 12/12/2013 | 12/12/2013 | A | PASS |
Dave Hannah
|
|
|
There is a lock box on the back man door on the garage. They code is 6360 to gain access. Phone #: ###-#### >> Inspection requested via web by kevin debelloy
|
DOC - Permit Finaled | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/29/2013 | 10/30/2013 | 10/30/2013 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin debelloy
|
BLD-Footing | 10/18/2013 | 10/18/2013 | 10/18/2013 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin debelloy mono placment ok
|
BLD-Other | 10/13/2013 | 10/14/2013 | 10/14/2013 | P | DEFR |
Jim Storey
|
|
|
Need a pre soil and erosion site inspection. If inspector could please call 30 min before arrrival so i can meet him there, that would be great. Thanks - Kevin deBelloy Phone #: ###-#### esc>> Inspection requested via web by kevin debelloy esc insp.
|
OVERRIDE | | | 10/10/2013 | | |
|
|
|
|
Routing Walk-In (Zoning) | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 10/10/2013 | 10/10/2013 | 10/10/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2013 | | |
|
|
|
|
1st review completed | | | 10/10/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/10/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 10/10/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 10/10/2013 | | | |
|
|
|
|