Permit Information
Permit NumberBLD13-02822
StatusIssued
Name DOUGLAS TAMURA
Site Address 732 E SANTA PAULA PL
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit is for the construction of an in–ground pool at the rear of the home, the pool is to be constructed as per the approved plans, the attached engineering, appendix G of the 2009 IRC, and current local codes. JG A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. If the pool is closer than 7' to the top/toe of slope a geotechnical engineer must provide a letter approving the setback conditions prior to placing foundation elements. If rock retaining wall is taller than 4' an engineer must approve wall prior to occupancy. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other5/28/20145/29/20145/29/2014APASS
DetailsDave Hannah
Doug Phone #: ###-####
BLD-Other5/22/20145/27/20145/27/2014APEND
DetailsDave Hannah
Rebar - Doug Phone #: ###-#### needs a geo tech sign off before concrete can be placed
PubWorks Subgrade Approval5/27/20145/27/20145/27/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  4/4/2014  
Routing Walk-In (BLD)4/4/20144/4/20144/4/2014PPASS
DetailsJavier Guzman
Issue PAID IN FULL permit  4/4/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  4/4/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  4/4/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/4/2014 DONE
Permit Ready to Issue  4/4/2014 DONE
DetailsChristina Prado
Routing Walk-In (Zoning)4/2/20144/2/20144/2/2014PPASS
DetailsColleen T Carroll
Routing Walk-In (PW Hillside)10/11/201310/11/20134/2/2014APASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. If the pool is closer than 7' to the top/toe of slope a geotechnical engineer must provide a leter approving the setback conditions prior to placing foundation elements. If rock retaining wall is taller than 4' an engineer must approve wall prior to occupancy. Call Jason Taylor at ###-####
Routing Walk-In (BLD)10/31/201310/31/201310/31/2013PFAIL
DetailsPerry Paine
Routing Walk-In (Zoning)10/11/201310/11/201310/31/2013ADONE
DetailsPerry Paine
Will need to Vacate Plat note first!
Routing Walk-In (Erosion)10/11/201310/11/201310/31/2013ADONE
Details
1st review completed  10/11/2013 FAIL
DetailsJavier Guzman
Failed zoning issue.
Application received 10/10/2013