Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD13-02842
StatusFinaled
Name RENAISSANCE REMODELING
Site Address 4729 N MOUNTAIN VIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the razing of an existing converted carport and garage area and reconstructing same to conform with current codes. The project also includes the reconfiguration of the kitchen area, bathroom addition and relocation of 2-bedrooms. R-1C ok per Leon Letson. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked Energy prescriptive method and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20146/10/20146/10/2014PPASS
DetailsTom Arcoraci
gabe - call for access 15 mins prior Phone #: ###-####
DOC - Permit Finaled6/10/20146/10/20146/10/2014PPASS
DetailsTom Arcoraci
BLD-Final6/2/20146/2/20146/2/2014PNH
DetailsJim Sly
Gabe Phone #: ###-####
No Access.
BLD-Final3/7/20143/10/20143/10/2014PNR
DetailsJim Sly
Gabe Phone #: ###-####
Need concrete driveway, C02 bsmnt, Finish siding and paint.
BLD-Energy code compliance12/19/201312/20/201312/20/2013APASS
DetailsJim Sly
gabe Phone #: ###-####
BLD-Framing/Rough-in12/13/201312/16/201312/16/2013PPASS
DetailsJim Sly
Gabe Phone #: ###-####
Routing Walk-In (BLD)12/16/201312/16/201312/16/2013APASS
DetailsPerry Paine
changed wording to reflect entire project
Case Summary (BLD)  12/16/2013  
Inspection Record Card- Bld  12/16/2013  
Meeting  12/12/2013 DONE
Meeting with Troy J correction on job Acca report required. pep
Routing - MECHANICAL12/12/2013 12/12/2013 PASS
DetailsTroy James
manual j report
BLD-Conference12/10/201312/10/201312/10/2013AFAIL
Details
need Acca reporc..new furnace and duct system
BLD-Wall Bracing12/2/201312/3/201312/3/2013APASS
DetailsJim Sly
gabe Phone #: ###-####
BLD-Conference12/3/201312/3/201312/3/2013PDONE
DetailsJim Sly
Talked to Gabe.....job superintendant. Need to contact PDS and add.......total remodel of existing res to scope of work.
BLD-Foundation10/24/201310/24/201310/24/2013PPASS
DetailsJim Sly
dave Phone #: ###-####
BLD-Footing10/22/201310/23/201310/23/2013APASS
DetailsJim Sly
DAVE-LATE AM PLEASE Phone #: ###-####
OVERRIDE  10/14/2013  
Routing Walk-In (Zoning)10/14/201310/14/201310/14/2013PDONE
DetailsLeon Letson
Routing Walk-In (BLD)10/14/201310/14/201310/14/2013PDONE
DetailsPerry Paine
Plan assigned to (PEP)10/14/201310/14/201310/14/2013 PASS
DetailsPerry Paine
1st review completed  10/14/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/14/2013 DONE
Inspection Record Card- Bld  10/14/2013  
Permit Ready to Issue  10/14/2013 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  10/14/2013 DONE
DetailsTisha Gallop
Application received 10/14/2013