Third Notice | | 1/11/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 11/12/2014 | 12/1/2014 | | DONE |
|
|
|
|
Third Notice | | 9/3/2014 | 11/3/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson @ ESI
|
Third Notice | | 6/14/2014 | 8/29/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Second Notice | | 4/10/2014 | 5/5/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
First Notice | | 3/3/2014 | 3/31/2014 | | DONE |
|
|
|
|
BLD-Final | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PASS |
Dave Hannah
|
|
|
Reinspection of MMC 12th Floor, Fire Final, Coordinate with Adam or Bob for inspection. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PASS |
Forrest France
|
|
|
C/N items verified. Fire life safety passed. *Note- fire sprinkler coverage at the shell areas to be maintained at new demising walls as discussed on site.
|
Permanent Occupancy | | | 2/21/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 2/19/2014 | 2/20/2014 | 2/20/2014 | P | PEND |
Dave Hannah
|
|
|
Final walk MMC TI, 12th Floor. Coordinate with Adam or Bob for walk. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok after fire finals
|
FIRE-Final Inspection | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | FAIL |
Forrest France
|
|
|
C/N items include; repair one EM light at the main entry, replace missing ceiling tile, obstruction to fire sprinkler coverage at the server room, post suite address numbers, replace missing escutcheon at the conference room, check pendent sprinkler head at the east office adjacent to the server room for physical damage.
|
BLD-Ceiling Grid Inspection | 2/4/2014 | 2/4/2014 | 2/5/2014 | P | PASS |
Dave Hannah
|
|
|
Request for Partial ceiling inspection, 12th floor MMC. VAV unit stalled in shipment, but would like to flood the rest of the suite. Please check in with Adam or Bob. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 12/16/2013 | 12/16/2013 | 12/17/2013 | P | PASS |
Dave Hannah
|
|
|
Inspection request for MMC, 12th Floor, per Bob L. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
Print Occupancy Form | | | 11/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 11/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 10/21/2013 | | 11/14/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 11/8/2013 | | 11/12/2013 | | PASS |
Tim L. Woodard
|
|
|
Routed Q and A for Suite creation. TLW
|
Routing - Addressing | 11/12/2013 | | 11/12/2013 | | PASS |
Jason C. Taylor
|
|
|
Suite # has changed to 1250. Jason Taylor ###-####
|
1st review completed | | | 11/8/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/21/2013 | | 11/8/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and history on the drawing sheets. TLW
|
Routing - FIRE | 10/21/2013 | | 10/22/2013 | | PASS |
Scott Arellano
|
|
|
|
Routing PW Sewer Rating | 10/21/2013 | | 10/22/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/21/2013 | | 10/21/2013 | | FAIL |
Jason C. Taylor
|
|
|
Suite number is incorrect. Number is already in use. Applicant must resubmit with correct address. Jason Taylor ###-####
|
Routing - PUBLIC WORKS | 10/21/2013 | | 10/21/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 10/21/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Payment Received | | | 10/18/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/15/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 15 2013 12:56PM
|