BLD-Final | 3/20/2014 | 3/20/2014 | 3/20/2014 | P | PASS |
Tony Young
|
|
|
Steve-PLease call at least 30 mins prior t o inspection Phone #: ###-####
|
DOC - Permit Finaled | 3/20/2014 | 3/20/2014 | 3/20/2014 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/16/2013 | 12/16/2013 | 12/17/2013 | P | PART |
Dave Hannah
|
|
|
mark Phone #: ###-#### ok to cover upper area still need to check sub floor after beam hanger is installed
|
BLD-Framing/Rough-in | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok to insulate
|
BLD-Conference | 12/11/2013 | 12/12/2013 | 12/12/2013 | A | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, frame ?s
|
OVERRIDE | | | 10/21/2013 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/21/2013 | 10/21/2013 | 10/21/2013 | P | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 10/21/2013 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 10/21/2013 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (PW Hillside) | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Jason C. Taylor
|
|
|
No new footings are in the scope of work. No hillside requirements. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Need engineering calculations for beam carring end wall as this design does not meet conventional light framed construction. No foundation on all sides.
Need to meet WUI Zone A requirments
|
1st review completed | | | 10/17/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | 10/17/2013 | | | |
|
|
|
|