Third Notice | | 7/14/2014 | 7/31/2014 | | DONE |
|
|
|
This permit finaled on the web by josh Murray
|
Third Notice | | 6/14/2014 | 7/9/2014 | | DONE |
|
|
|
6/27/14 Josh from JDM Renovation in office said just waiting on mech value from owner to turn in /// mailed third notice with letter 7-9-14
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
mailed to JDM Remodeling
|
Third Notice | | 4/5/2014 | 5/5/2014 | | DONE |
|
|
|
mailed
|
Second Notice | | 3/15/2014 | 3/31/2014 | | DONE |
Christina Prado
|
|
|
mailed 4-1-14
|
First Notice | | 2/2/2014 | 3/5/2014 | | DONE |
|
|
|
Mailed 3-5-14
|
BLD-Final | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Jim Storey
|
|
|
Rocky Phone #: ###-####
|
Permanent Occupancy | | | 1/23/2014 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Issue PAID IN FULL permit | | | 11/26/2013 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 10/18/2013 | 10/18/2013 | 11/7/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/7/2013 | | 11/7/2013 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
received two sets of revised plan sheets marked A-1 & H-1; Plans taken directly to Troy to insert and review per Troy's request
|
Routing - MECHANICAL | 11/7/2013 | | 11/7/2013 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/7/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 11/7/2013 | | |
|
|
|
|
Telephone call | | | 11/7/2013 | | |
|
|
|
11-7-13 called Rocky permit ready and fee given / Also need GC & FORM 304 ///DLD
|
Routing - MECHANICAL | 10/31/2013 | | 10/31/2013 | | FAIL |
Troy James
|
|
|
Waiting for clarification from mechanical engineer about the gas load for a couple of the appliances under hood.
|
1st review completed | | | 10/31/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/21/2013 | | 10/31/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 10/30/2013 | | 10/30/2013 | | PASS |
Bill VanDegrift
|
|
|
minor fixture replacement, drains to existing floor sinks. additional cross connection protection may be required
|
Routing PW Environmental | 10/23/2013 | | 10/23/2013 | | PASS |
Walt Baumgartner
|
|
|
Former Cold Stone Creamery space, original plan set indicates critical drain points connected to the exisitn grease line.
|
Routing - PUBLIC WORKS | 10/23/2013 | | 10/23/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 10/21/2013 | | 10/21/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 10/21/2013 | | 10/21/2013 | | FAIL |
Walt Baumgartner
|
|
|
Grease interceptor required. Shell and Core may have common grease line for multi tenants already available or accessable. Call ###-#### for information
|
Routing - Addressing | 10/18/2013 | | 10/21/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 10/21/2013 | | FAIL |
|
|
|
Failed by Walt Baumgartner for pre-treatment concerns.
|
Application received | | 10/18/2013 | 10/18/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2013 | | DONE |
|
|
|
|