Permanent Occupancy | | | 10/29/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 10/25/2013 | 10/25/2013 | 10/25/2013 | A | PASS |
Tom Arcoraci
|
|
|
done 408 per troy
|
FIRE-Final Inspection | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | CANC |
Troy Cobbley
|
|
|
I left two voice messages for Herb but did not receive a reply. Building inspector said he would verify my items if he could contact tenant. phone #: ###-####
|
BLD-Final | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | NR |
Tom Arcoraci
|
|
|
Please call ahead for access - herb Phone #: ###-####
|
FIRE-Final Inspection | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | FAIL |
Forrest France
|
|
|
Need to post fire extinguisher with current tag along normal travel path as discussed, post "door to remain..." signage at the main entry/exit.
|
Plan assigned to (CDM) | 10/18/2013 | 10/18/2013 | 10/23/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/18/2013 | | 10/23/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/23/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/23/2013 | | DONE |
|
|
|
|
Telephone call | | | 10/23/2013 | | DONE |
Christina Prado
|
|
|
called Jay to advise permit is ready for pick up
|
Permit Ready to Issue | | | 10/23/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 10/23/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 10/23/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 10/18/2013 | 10/18/2013 | | DONE |
|
|
|
|
First Notice | | 11/8/2013 | | | |
|
|
|
|