Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-02923
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1072 N LIBERTY ST Unit: 303
Project NameSARMC Neurosciences
Customer Number 
ePlanReviewYes
Description
(ST AL'S - MULVANEY BLDG - NEUROSCIENCES CLINIC - SUITE 303) The fire sprinkler system is used for building area increase and for story increase. To construct an 11,371 square foot medical office tenant space on the 21,952 square foot 3rd story of an existing medical office building. A common corridor will be constructed on the 3rd story to connect the stairway enclosures. This facility is classified as an outpatient clinic where no one is rendered incapable of self-preservation by the services provided. Work is to include 6 single user toilet rooms accessible to the disabled, interior nonbearing walls, interior doors, interior windows, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/20/20147/2/2014 DONE
This permit finaled on the web by Brandon Byington
First Notice 5/18/20146/10/2014 DONE
Faxed 6-10-14
BLD-Final5/8/20145/8/20145/8/2014PPASS
DetailsTom Arcoraci
BLD-Final5/7/20145/8/20145/8/2014APASS
DetailsTom Arcoraci
Cecil Phone #: ###-####
Permanent Occupancy  5/8/2014 DONE
DetailsTisha Gallop
FIRE-Final Inspection5/6/20145/6/20145/7/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in2/12/20142/12/20142/12/2014PPASS
DetailsTom Arcoraci
BLD-Wall cover2/7/20142/7/20142/7/2014PPASS
DetailsTom Arcoraci
BLD-Wall cover2/5/20142/7/20142/7/2014APASS
DetailsTom Arcoraci
BLD-Wall cover2/5/20142/5/20142/5/2014PPASS
DetailsTom Arcoraci
wip ok ok for partial cover
Print Occupancy Form  1/10/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  1/10/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  1/10/2014 DONE
DetailsChristina Prado
Plan assigned to (CJW)11/14/201311/14/201312/4/2013 PASS
DetailsCarl Westfall
ST. AL'S NEUROSCIENCES - ePlanReview Level 3 TI - (20 days - Dec 11)
Routing - PLAN CHECK12/3/2013 12/4/2013 DONE
DetailsCarl Westfall
Routing for 2nd review complete
PLANS/APPL TAKEN TO FRONT DESK  12/4/2013 DONE
Routing - PLAN CHECK12/2/2013 12/3/2013 DONE
DetailsCarl Westfall
Started 2nd routing
Routing - FIRE12/3/2013 12/3/2013 PASS
DetailsCraig D. Hanson
Plan resubmittals received  12/2/2013 DONE
1st review completed  12/2/2013 DONE
Failed Fire
Plan resubmittals requested  12/2/2013 DONE
Routing - PLAN CHECK11/14/2013 12/2/2013 PASS
DetailsCarl Westfall
Drawings approved with "red lines".
Routing - FIRE11/14/201311/14/201311/25/2013 FAIL
DetailsCraig D. Hanson
Please see Fire Plan Report 11-25-2013
Routing - Addressing11/14/2013 11/21/2013 PASS
DetailsEmily Dixon
Suite number is 303
Routing - PLUMBING11/14/2013 11/19/2013 PASS
DetailsBill VanDegrift
Install per plan and ISPC.
Routing - PUBLIC WORKS11/14/2013 11/15/2013 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating11/15/2013 11/15/2013 PASS
DetailsConnie Baumgartner
Routing PW Environmental11/15/2013 11/15/2013 PASS
DetailsWalt Baumgartner
Recd Pcfee & Taken To Pln CK  11/14/2013 DONE
DetailsBarbara Stitt
Pending Assignment by JCB11/14/2013 11/14/2013 DONE
DetailsJason Blais
Intake Approval  11/14/2013 PASS
DetailsJason Blais
Prescreen passed by Adele Schaffeld-Griffin. Plan review fees paid.
Application received  10/21/2013 DONE
Application submitted via PDS Online on Oct 21 2013 11:30AM