Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02930
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 5701 W ALBATROS ST
Project NameIDAHO POWER-WEC
Customer Number 
ePlanReviewNo
Description
IDAHO POWER-WEC-- Permit for tenant improvements to an existing 27,458 sq. ft. building with work to include minor improvements to the existing 3,000 sq. ft. office space to include the removal of some interior nonbearing walls to create an open office area, relocation of plumbing fixtures, installation of a 90 minute fire rated double door and related interior finishes per the approved plans and any notations. Racking is indicated on the plans. No racking is allowed to be over 8 feet in height. Any future racking over 8 feet in height will require a separate racking permit. No occupancy of the 11,000 sq.ft. office area is allowed under this permit. An additional building permit will be required to occupy this space and to address existing exiting deficiencies as the current exit separation does not comply with the 1991 UBC or the current 2009 IBC. This building was annexed into the City of Boise from the County in 2006. Any future building additions, change of use or occupancy will require site and/or building improvements to meet the provisions of current Building and Fire Codes. CDM/SJA
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/15/20143/7/2014 DONE
This permit finaled on the web by Brandon Byington
First Notice 2/2/20143/5/2014 DONE
BLD-Final1/21/20141/23/20141/23/2014APASS
DetailsJim Storey
am apointment 830 w bob Bob-PLease call at least 30 mins prior to inspection Phone #: ###-####
Permanent Occupancy  1/23/2014 DONE
DetailsChristina Prado
BLD-Final1/21/20141/21/20141/21/2014PCANC
DetailsJim Storey
Bob-PLease call at least 30 mins prior to inspection Phone #: ###-####
BLD-Final12/20/201312/23/201312/23/2013APART
DetailsJim Storey
bob Phone #: ###-#### final ok pending ele and mec finals.
FIRE-Final Inspection12/20/201312/23/201312/23/2013APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection12/17/201312/18/201312/18/2013PFAIL
DetailsTroy Cobbley
Provide current inspection and mount the fire extinguishers, repair existing exit signs and emergency lights, repair and test the roll down fire door, provide additional exit sign at the door as marked on the city approved plans.
BLD-Ceiling Grid Inspection12/12/201312/12/201312/12/2013PPASS
DetailsJim Storey
Bob Phone #: ###-####
BLD-Framing/Rough-in11/25/201311/26/201311/26/2013APART
DetailsJim Storey
bob Phone #: ###-#### ok to cover pending ele
Issue PAID IN FULL permit  11/19/2013 DONE
DetailsChristina Prado
Print Occupancy Form  11/18/2013 DONE
DetailsTisha Gallop
Telephone call  11/18/2013 DONE
DetailsChristina Prado
called Chris to advise permit is ready pending GC and gave fees due
Permit Ready to Issue  11/18/2013 DONE
DetailsChristina Prado
Routing - FIRE11/15/201311/15/201311/15/2013 PASS
DetailsScott Arellano
Attached comments to plans.
Plan assigned to (CDM)11/14/201311/14/201311/15/2013 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK11/5/2013 11/15/2013 PASS
DetailsTim L. Woodard
Tim Woodard
1st review completed  11/15/2013 PASS
Routing - PLAN CHECK11/15/2013 11/15/2013 PASS
DetailsCarl D Madsen
Case Summary (BLD)  11/15/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/15/2013 DONE
Plan assigned to (TLW)11/4/2013 11/14/2013 DEFR
DetailsTim L. Woodard
Defered to Carl M
Routing - PUBLIC WORKS11/4/2013 11/5/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing11/5/2013 11/5/2013 PASS
DetailsJason C. Taylor
Intake Approval  11/4/2013 PASS
DetailsCarl D Madsen
Fees paid and started routing
Plans ACCEPTED BY PLAN TECH  10/22/2013 DONE
DetailsBarbara Stitt
Fees not paid yet routing not started until fees paid//BAS--Fees paid and started routing
Application received 10/21/201310/21/2013 DONE
DetailsBarbara Stitt