Permit Information
Permit NumberBLD13-02947
StatusFinaled
Name ESI
Site Address 635 N PHILLIPPI ST
Project NameNINE CELLARS INC.
Customer Number 
ePlanReviewNo
Description
(NINE CELLARS INC.) Permit to splitting an existing building into two tenant spaces. This permit is for a wine distributor warehouse and office tenant within an existing building per approved plans. The warehouse/office occupancy is an established occupancy for this space. Scope of work for project includes work on both tenant spaces. Work to include, infill of masonry wall between tenant space per approved plans, new 3 hour doors exit door and rated wall infill per approved plans from 935 Phillippi out loading area, small walk in cooler, new bollards for egress path with new stairs and handrails. Exterior columns will have spray applied fire proofing applied with special inspection. 699 Phillippi will have non rated exit doors installed that lead out the loading area with egress path protected with bollards per approved plans. Exit lights and emergency egress lighting shall be installed per approved plans. The existing wall separating the 2 tenant spaces shall be rated as per approved plans as well as the existing construction rated as per approved plans. New accessible egress ramp will be installed per approved plans. See letter in fire from Building Official and Fire Marshal on request for area modification. Any racks over 8 feet in height shall be permitted separately. This building is NOT fire sprinklered.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/13/2014 DONE
DetailsChristina Prado
First Notice 5/30/20146/5/2014 DONE
DetailsChristina Prado
Permanent Occupancy  5/20/2014 DONE
DetailsChristina Prado
Issued per Bob Archibald's request, no card given
BLD-Final4/22/20144/22/20144/22/2014PPASS
DetailsTom Arcoraci
Nate Phone #: ###-####
FIRE-Final Inspection4/22/20144/22/20144/22/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Conference4/21/20144/22/20144/22/2014ACANC
DetailsTom Arcoraci
Sign and hardware completed?
BLD-Final3/19/20143/20/20143/20/2014PNR
DetailsTom Arcoraci
nate Phone #: ###-####
FIRE-Final Inspection3/19/20143/20/20143/20/2014AFAIL
DetailsTroy Cobbley
Still need the sticker at the main exit and the single action hardware on the south exit door as previously noted.
BLD-Aging Inspection3/14/20143/17/20143/20/2014APASS
DetailsTom Arcoraci
BLD-Final2/12/20142/13/20142/13/2014PNR
DetailsJim Sly
Nate Phone #: ###-####
FIRE-Final Inspection2/12/20142/13/20142/13/2014AFAIL
DetailsTroy Cobbley
Provide annual inspection for the fire extinguishers and mount as discussed. Provide single action hardware on the south exit door. Provide the exit signs/emergency lights as discussed. Provide sticker at the main exit.
CHANGE STATUS TO (ISS)  2/12/2014 DONE
DetailsTisha Gallop
per note on 2-6-14
BLD-Final2/6/20142/7/20142/7/2014ANR
DetailsTom Arcoraci
FIRE-Final Inspection2/6/20142/7/20142/7/2014ACANC
DetailsTroy Cobbley
I could not find the city approved plans on site. Cancel per Nate Phone #: ###-####.
BLD-Final2/6/20142/7/20142/6/2014ACANC
DetailsTom Arcoraci
Nate Phone #: ###-####
DOC - Permit Finaled2/6/20142/6/20142/6/2014PCANC
DetailsTom Arcoraci
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Framing/Rough-in11/6/201311/6/201311/6/2013PPASS
DetailsMike Jordan
Override - Parcel Holds  11/6/2013  
Override - Parcel Holds  11/4/2013  
Issue PAID IN FULL permit  11/4/2013 DONE
OVERRIDE  11/1/2013  
OVERRIDE  11/1/2013  
Routing - FIRE11/1/201311/1/201311/1/2013 PASS
DetailsScott Arellano
Attached plan review report to plans.
Plan assigned to (AJS)10/24/201310/24/201311/1/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 11/18 Level 3 TI - 635 Phillippi St.
Case Summary (BLD)  11/1/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/1/2013 DONE
Print Occupancy Form  11/1/2013 DONE
DetailsTisha Gallop
Override - Parcel Holds  11/1/2013  
Permit Ready to Issue  11/1/2013 DONE
DetailsChristina Prado
Override - Parcel Holds  11/1/2013  
Permit Ready to Issue  11/1/2013 DONE
DetailsTisha Gallop
Telephone call  11/1/2013 DONE
DetailsTisha Gallop
called Lance Fish and left vm permit is ready, fee due, need GC/RCE and RP
1st review completed  10/31/2013 FAIL
failed fire, plan check.
Routing - FIRE10/29/2013 10/31/2013 FAIL
DetailsCraig D. Hanson
Waiting for response from Lance regarding storage and commodities. 10/29 CDH
Routing - PLAN CHECK10/30/2013 10/30/2013 PASS
DetailsAdele J Schaffeld-Griffin
recieved special inspection document
Plan Reviewer's activity  10/29/2013 DONE
Sent Email to Lance on 10/29, need information quantities and type of alchool and storage method.
Routing - Design Review10/28/2013 10/29/2013 PASS
DetailsJosh Wilson
Josh Wilson - CZC13-00218
Routing - PLAN CHECK10/29/2013 10/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
email sent to Lance 10/29/13
Lance,

I wanted to follow up with an email in regards to the phone conversation earlier. Special inspection will be required for the spray applied fire proofing as per chapter 17 IBC.

I am wrapping up my plan review and sending it onto fire for their review.

Please email me the 301 form and I will put it with both application.

Thank you

Adele
Routing - Erosion and Sediment10/25/2013 10/28/2013 PASS
DetailsEvan Jenkins
Telephone call  10/28/2013 DONE
DetailsAdele J Schaffeld-Griffin
received phone call from John. I again went over the early start process with him and the requirement to have the life safety requirements met prior to having a temp c of o issued for the warehouse space. He said he could call Nate with ESI.
Telephone call  10/28/2013 DONE
DetailsAdele J Schaffeld-Griffin
received a call from Nate with ESI I went over the early start with him and he said that they would not be pursuing an early start due to the scope of the project and the restriction on the early start that allows progress but not to cover.
Routing - PUBLIC WORKS10/25/2013 10/25/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating10/25/2013 10/25/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing10/24/2013 10/24/2013 PASS
DetailsEmily Dixon
Pending Assignment by JCB10/23/2013 10/24/2013 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  10/23/2013  
10-22-13 ok per Adele to take in as a level 3
Intake Approval  10/22/2013 PASS
DetailsJason Blais
Passed by Adele Schaffeld-Griffin.
Application received 10/22/2013