Telephone call | | | 10/16/2014 | | DONE |
Candy A. Nichols
|
|
|
talked to Nate @ ESI-electrical permit was for low voltage for the 2 exit signs
|
Print Statement | | | 10/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 10/14/2014 | | |
Candy A. Nichols
|
|
|
called-left message for Nate-have questions about the electrical. Says there is a valuation but no ele permit was pulled. asked him to call me back.
|
First Notice | | 8/30/2014 | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 10-6-14
|
Print Occupancy Form | | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/19/2014 | 3/20/2014 | 3/20/2014 | P | PASS |
Tom Arcoraci
|
|
|
nate Phone #: ###-####
|
FIRE-Final Inspection | 3/19/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Aging Inspection | 3/14/2014 | 3/17/2014 | 3/20/2014 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/12/2014 | 2/13/2014 | 2/13/2014 | P | NR |
Jim Sly
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | NR |
Tom Arcoraci
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | CANC |
Troy Cobbley
|
|
|
Could not find city approved drawings on stie. Cancel per Nate Phone #: ###-####
|
BLD-Final | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Tom Arcoraci
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 11/8/2013 | 11/12/2013 | 11/12/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy, per Jason Blaise, for the warehouse area is approved until the remaining work is complete.
|
BLD-Final | 11/8/2013 | 11/12/2013 | 11/12/2013 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | NR |
Tom Arcoraci
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | FAIL |
Troy Cobbley
|
|
|
I let Nate know that per Jason Blais the exit sign/emergency lights, hardware at the new double doors and the exterior stairs would need to be completed prior to a temporary occupancy approval for the warehouse area could be given. Phone #: ###-####
|
Override - Parcel Holds | 11/7/2013 | 1/1/1900 | 11/7/2013 | | |
|
|
|
temp
|
BLD-Framing/Rough-in | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PART |
Mike Jordan
|
|
|
Nate Phone #: ###-####. Door infill framing at dock area and 3hr. wall extension at dock area, one side sheeted already. Contractor to provide RFI from architect for change in construction at 3hr. rated infill from CMU to steel stud framing.
|
Override - Parcel Holds | 11/4/2013 | 1/1/1900 | 11/4/2013 | | |
|
|
|
Not scheduling on parking lot
|
Override - Parcel Holds | | | 11/4/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/4/2013 | | DONE |
|
|
|
|
Routing - FIRE | 11/1/2013 | 11/1/2013 | 11/1/2013 | | PASS |
Scott Arellano
|
|
|
Attached comment to plans.
|
Plan assigned to (AJS) | 10/24/2013 | 10/24/2013 | 11/1/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 11/18 Level 3 TI - 699 Phillippi St.
|
Case Summary (BLD) | | | 11/1/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 11/1/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 11/1/2013 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 11/1/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 11/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/1/2013 | | DONE |
Tisha Gallop
|
|
|
called Lance Fish and left vm permit is ready, fee due, need GC/RCE
|
Routing - FIRE | 10/29/2013 | | 10/31/2013 | | FAIL |
Craig D. Hanson
|
|
|
Waiting for response from Lance regarding storage and commodities. 10/29 CDH
|
1st review completed | | | 10/31/2013 | | FAIL |
|
|
|
failed fire, plan check
|
Routing - PLAN CHECK | 10/30/2013 | | 10/30/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
recieved special inspection document
|
Routing - Design Review | 10/28/2013 | | 10/29/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC13-00218
|
Routing - PLAN CHECK | 10/29/2013 | | 10/29/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed lance 10/29/13 need special inspection form
|
Routing - Erosion and Sediment | 10/25/2013 | | 10/28/2013 | | PASS |
Evan Jenkins
|
|
|
|
Telephone call | | | 10/28/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
received a call from Nate with ESI I went over the early start with him and he said that they would not be pursuing an early start due to the scope of the project and the restriction on the early start that allows progress but not to cover.
|
Telephone call | | | 10/28/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
received phone call from John. I again went over the early start process with him and the requirement to have the life safety requirements met prior to having a temp c of o issued for the warehouse space. He said he could call Nate with ESI.
|
Routing PW Sewer Rating | 10/25/2013 | | 10/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/25/2013 | | 10/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 10/24/2013 | | 10/24/2013 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 10/23/2013 | | 10/24/2013 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/23/2013 | | |
|
|
|
10-22-13 Ok per Adele to take in as a level 3
|
Intake Approval | | | 10/22/2013 | | PASS |
Jason Blais
|
|
|
Passed by Adele Schaffeld-Griffin.
|
Second Notice | | 10/16/2014 | | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 10/22/2013 | | | |
|
|
|
|