Permit Information
Permit NumberBLD13-02948
StatusFinaled
Name ESI
Site Address 699 N PHILLIPPI ST
Project NameSVFORZA GEAR
Customer Number 
ePlanReviewNo
Description
(SVFORZA GEAR.) Permit to splitting an existing building into two tenant spaces. This permit is for clothing manufacturing space and office tenant within an existing building per approved plans. The manufacturing/office occupancy is a change in occupancy for this space. Scope of work for project includes work on both tenant spaces. Work to include, infill of masonry wall between tenant space per approved plans, new 3 hour doors exit door and rated wall infill per approved plans from 935 Phillippi out loading area, new bollards for egress path with new stairs and handrails. Exterior columns will have spray applied fire proofing applied with special inspection. 699 Phillippi will have non rated exit doors installed that lead out the loading area with egress path protected with bollards per approved plans. Exit lights and emergency egress lighting shall be installed per approved plans. The existing wall separating the 2 tenant spaces shall be rated as per approved plans as well as the existing construction rated as per approved plans. New accessible egress ramp will be installed per approved plans. See letter in fire from Building Official and Fire Marshal on request for area modification. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  10/16/2014 DONE
DetailsCandy A. Nichols
talked to Nate @ ESI-electrical permit was for low voltage for the 2 exit signs
Print Statement  10/16/2014 DONE
DetailsCandy A. Nichols
Telephone call  10/14/2014  
DetailsCandy A. Nichols
called-left message for Nate-have questions about the electrical. Says there is a valuation but no ele permit was pulled. asked him to call me back.
First Notice 8/30/201410/6/2014 DONE
DetailsCandy A. Nichols
sent in mail 10-6-14
Print Occupancy Form  8/20/2014 DONE
DetailsChristina Prado
Permanent Occupancy  8/20/2014 DONE
DetailsChristina Prado
BLD-Final3/19/20143/20/20143/20/2014PPASS
DetailsTom Arcoraci
nate Phone #: ###-####
FIRE-Final Inspection3/19/20143/20/20143/20/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Aging Inspection3/14/20143/17/20143/20/2014APASS
DetailsTom Arcoraci
BLD-Final2/12/20142/13/20142/13/2014PNR
DetailsJim Sly
Nate Phone #: ###-####
FIRE-Final Inspection2/12/20142/13/20142/13/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Final2/6/20142/7/20142/7/2014ANR
DetailsTom Arcoraci
Nate Phone #: ###-####
FIRE-Final Inspection2/6/20142/7/20142/7/2014ACANC
DetailsTroy Cobbley
Could not find city approved drawings on stie. Cancel per Nate Phone #: ###-####
BLD-Final11/12/201311/12/201311/12/2013PPASS
DetailsTom Arcoraci
ok for temp occ
FIRE-Final Inspection11/8/201311/12/201311/12/2013APART
DetailsTroy Cobbley
A temporary occupancy, per Jason Blaise, for the warehouse area is approved until the remaining work is complete.
BLD-Final11/8/201311/12/201311/12/2013ACANC
DetailsTom Arcoraci
BLD-Final11/7/201311/8/201311/8/2013ANR
DetailsTom Arcoraci
Nate Phone #: ###-####
FIRE-Final Inspection11/7/201311/8/201311/8/2013AFAIL
DetailsTroy Cobbley
I let Nate know that per Jason Blais the exit sign/emergency lights, hardware at the new double doors and the exterior stairs would need to be completed prior to a temporary occupancy approval for the warehouse area could be given. Phone #: ###-####
Override - Parcel Holds11/7/20131/1/190011/7/2013  
temp
BLD-Framing/Rough-in11/4/201311/5/201311/5/2013APART
DetailsMike Jordan
Nate Phone #: ###-####. Door infill framing at dock area and 3hr. wall extension at dock area, one side sheeted already. Contractor to provide RFI from architect for change in construction at 3hr. rated infill from CMU to steel stud framing.
Override - Parcel Holds11/4/20131/1/190011/4/2013  
Not scheduling on parking lot
Override - Parcel Holds  11/4/2013  
Issue PAID IN FULL permit  11/4/2013 DONE
Routing - FIRE11/1/201311/1/201311/1/2013 PASS
DetailsScott Arellano
Attached comment to plans.
Plan assigned to (AJS)10/24/201310/24/201311/1/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 11/18 Level 3 TI - 699 Phillippi St.
Case Summary (BLD)  11/1/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/1/2013 DONE
Print Occupancy Form  11/1/2013 DONE
DetailsTisha Gallop
Override - Parcel Holds  11/1/2013  
Permit Ready to Issue  11/1/2013 DONE
DetailsChristina Prado
Override - Parcel Holds  11/1/2013  
Permit Ready to Issue  11/1/2013 DONE
DetailsTisha Gallop
Telephone call  11/1/2013 DONE
DetailsTisha Gallop
called Lance Fish and left vm permit is ready, fee due, need GC/RCE
Routing - FIRE10/29/2013 10/31/2013 FAIL
DetailsCraig D. Hanson
Waiting for response from Lance regarding storage and commodities. 10/29 CDH
1st review completed  10/31/2013 FAIL
failed fire, plan check
Routing - PLAN CHECK10/30/2013 10/30/2013 PASS
DetailsAdele J Schaffeld-Griffin
recieved special inspection document
Routing - Design Review10/28/2013 10/29/2013 PASS
DetailsJosh Wilson
Josh Wilson - CZC13-00218
Routing - PLAN CHECK10/29/2013 10/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
emailed lance 10/29/13 need special inspection form
Routing - Erosion and Sediment10/25/2013 10/28/2013 PASS
DetailsEvan Jenkins
Telephone call  10/28/2013 DONE
DetailsAdele J Schaffeld-Griffin
received a call from Nate with ESI I went over the early start with him and he said that they would not be pursuing an early start due to the scope of the project and the restriction on the early start that allows progress but not to cover.
Telephone call  10/28/2013 DONE
DetailsAdele J Schaffeld-Griffin
received phone call from John. I again went over the early start process with him and the requirement to have the life safety requirements met prior to having a temp c of o issued for the warehouse space. He said he could call Nate with ESI.
Routing PW Sewer Rating10/25/2013 10/25/2013 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS10/25/2013 10/25/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing10/24/2013 10/24/2013 PASS
DetailsEmily Dixon
Pending Assignment by JCB10/23/2013 10/24/2013 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  10/23/2013  
10-22-13 Ok per Adele to take in as a level 3
Intake Approval  10/22/2013 PASS
DetailsJason Blais
Passed by Adele Schaffeld-Griffin.
Second Notice 10/16/2014  DONE
DetailsCandy A. Nichols
Application received 10/22/2013