Third Notice | | 9/3/2014 | 10/6/2014 | | DONE |
|
|
|
follow up // company on hold 10/6/14
|
Third Notice | | 7/14/2014 | 8/29/2014 | | DONE |
|
|
|
mailed with letter to Kouba Homes
|
Third Notice | | 6/14/2014 | 7/9/2014 | | DONE |
|
|
|
mailed to Kouba
|
Third Notice | | 5/12/2014 | 6/9/2014 | | DONE |
|
|
|
mailed to Kouba Homes
|
Second Notice | | 4/10/2014 | 5/7/2014 | | DONE |
Barbara Stitt
|
|
|
Mailed 5-7-14
|
First Notice | | 3/21/2014 | 3/31/2014 | | DONE |
Christina Prado
|
|
|
mailed 4-1-14
|
BLD-Final | 3/10/2014 | 3/11/2014 | 3/11/2014 | A | PASS |
Jim Storey
|
|
|
vince Phone #: ###-#### final ok no card on site
|
Print Occupancy Form | | | 3/11/2014 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 3/11/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 3/7/2014 | 3/10/2014 | 3/10/2014 | A | PASS |
Forrest France
|
|
|
Verified C/N items are finished with the exception of door hardware at one pair of main entry/exit doors. This item to be completed prior to structural final as agreed.
|
FIRE-Final Inspection | 3/7/2014 | 3/7/2014 | 3/7/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher on the mezzanine, repair/install all exit signs/emergency lights and provide single action hardware on one set of the double store front doors.
|
BLD-Energy code compliance | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | PASS |
Jim Storey
|
|
|
vince Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2014 | 2/5/2014 | 2/5/2014 | P | PASS |
Jim Storey
|
|
|
Vince Phone #: ###-####
|
BLD-Other | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PASS |
Jim Storey
|
|
|
vince - fire wall Phone #: ###-####
|
Permit Ready to Issue | | | 12/12/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/12/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 12/12/2013 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 10/25/2013 | | 11/21/2013 | | PASS |
Tim L. Woodard
|
|
|
Level 3 TI - ePlanReview - Moser Metal Milling
|
Routing - PLAN CHECK | 11/19/2013 | | 11/21/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 11/19/2013 | | 11/20/2013 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - FIRE | 11/19/2013 | | 11/20/2013 | | PASS |
Craig D. Hanson
|
|
|
See Fire Report Rveision 1
|
Plan resubmittals received | | | 11/19/2013 | | DONE |
Tim L. Woodard
|
|
|
E plan. TLW
|
Routing - FIRE | 10/25/2013 | 10/25/2013 | 11/18/2013 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Report
|
1st review completed | | | 11/18/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 10/25/2013 | | 11/18/2013 | | PASS |
Peter J. McCullough
|
|
|
Approved per E-Plan Review. TLW
|
Routing - ELECTRICAL | 10/25/2013 | | 11/14/2013 | | PASS |
Doug A Poedy
|
|
|
All equipment must be listed. TLW
|
Routing - PLAN CHECK | 10/25/2013 | | 11/14/2013 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks on the drawings. TLW
|
Routing - PLUMBING | 10/25/2013 | | 10/30/2013 | | FAIL |
Bill VanDegrift
|
|
|
Need to seperate hosebibs in shop from potable supply. Install a RPBP for evaporative cooler and hosebibs in shop.
|
Routing - Erosion and Sediment | 10/25/2013 | | 10/28/2013 | | PASS |
Evan Jenkins
|
|
|
No Review Needed
|
Routing - Addressing | 10/25/2013 | | 10/28/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Sewer Rating | 10/25/2013 | | 10/28/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 10/25/2013 | | 10/28/2013 | | PASS |
Walt Baumgartner
|
|
|
OK, spoke to owner Rob Moser w/ regard to wastewater disposal, etc.
|
Pending Assignment by JCB | 10/25/2013 | | 10/25/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - PUBLIC WORKS | 10/25/2013 | | 10/25/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 10/24/2013 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Sam Zahorka and plan review fees paid.
|
Application received | | | 10/22/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 22 2013 2:17PM
|