Second Notice | | 5/17/2014 | 5/22/2014 | | DONE |
|
|
|
This permit finaled on the web by Richard Schultz
|
First Notice | | 4/20/2014 | 5/7/2014 | | DONE |
Barbara Stitt
|
|
|
Faxed 5-7-14
|
Permanent Occupancy | | | 4/10/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/8/2014 | 4/8/2014 | 4/8/2014 | P | PASS |
Mike Jordan
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. All issues resolved. ok for perm occ.
|
BLD-Final | 4/7/2014 | 4/7/2014 | 4/7/2014 | P | FAIL |
Mike Jordan
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. The exterior emregency lightingg at main exit is non functional.
|
BLD-Final | 4/3/2014 | 4/4/2014 | 4/4/2014 | A | NR |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Needs electrical and mech. finals.
|
FIRE-Final Inspection | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Ceiling Grid Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 | P | PASS |
Mike Jordan
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz
|
BLD-Framing/Rough-in | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | PASS |
Mike Jordan
|
|
|
Holddowns on interior steel framed walls ok.
|
BLD-Framing/Rough-in | 1/9/2014 | 1/10/2014 | 1/10/2014 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Moved to pm.
|
BLD-Framing/Rough-in | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Mike Jordan
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. INterior steel stud framed walls adn hardlids ok. No grid at this time.
|
Case Summary (BLD) | | | 1/2/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/26/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/26/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 11/21/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 11/21/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 11/1/2013 | 11/1/2013 | 11/20/2013 | | PASS |
Sam Zahorka
|
|
|
1st review completed. (Toni & Guy Hairdressing Academy) Pending Fire and Plumbing to PASS.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2013 | | PASS |
Jason Blais
|
|
|
For Sam Zahorka.
|
Routing - PLAN CHECK | 11/15/2013 | | 11/20/2013 | | PASS |
Jason Blais
|
|
|
For Sam Zahorka.
|
Routing - FIRE | 11/15/2013 | 11/15/2013 | 11/19/2013 | | PASS |
Scott Arellano
|
|
|
See Fire Report Rev 1
|
1st review completed | | | 11/15/2013 | | DONE |
Sam Zahorka
|
|
|
Failed Fire and Plumbing
|
Routing - PLUMBING | 11/15/2013 | | 11/15/2013 | | PASS |
Bill VanDegrift
|
|
|
Hair sinks vents must be ran seperately over to wall and up 6 inches above flood level before tying together.
Delete recirc line if RPBP's are used.
|
Routing - PLAN CHECK | 11/1/2013 | | 11/15/2013 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 11/15/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - FIRE | 11/1/2013 | 11/1/2013 | 11/6/2013 | | FAIL |
Craig D. Hanson
|
|
|
Minor corrections required. See report
|
Telephone call | | | 11/6/2013 | | DONE |
|
|
|
Spoke with Matt regarding possible HazMat in storage area. He will ask the tenant for inventory if necissary.
|
Routing - PLUMBING | 11/1/2013 | | 11/5/2013 | | FAIL |
Bill VanDegrift
|
|
|
1) Use Idaho State Plumbing Code fixture sixing.(fixture schedule)
2) Combination waste and vent systems are approved for low usage fixtures where structural conditions will not allow conventional venting of fixtures. Vent each floor sink.
|
Routing - Erosion and Sediment | 11/1/2013 | | 11/4/2013 | | PASS |
Evan Jenkins
|
|
|
|
Routing PW Sewer Rating | 11/1/2013 | | 11/1/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 11/1/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 11/1/2013 | | 11/1/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 11/1/2013 | | 11/1/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 11/1/2013 | | 11/1/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 10/28/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Jason, here is what I sent Matt. I did find the energy information. He did not provide a com check just a compliance box in the corner of the reflective ceiling plan.
Matt,
1 Please complete and upload the ESC waiver letter.
2 Please re upload the deign professional of record document to read left to right.
3 The floor plan layout is only shown on the electrical sheets for the open workstation areas. The floor plan appears to be for hair stations only. Please let me know if this is correct, that there will be no nail stations, as the architectural floor plan does not include the layout.
4 I have spoken with Bill this morning and the plumbing plans will need to be designed and stamped by an engineer.
When the prescreen for this change in occupancy project is approved it will be routed as a major TI.
Please let me know if you have any questions.
Adele
|
Intake Approval | | | 10/28/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Matt,
1 I have spoken with Bill the plumbing plans will need to be designed and stamped by an engineer prior to approving the prescreen.
When the prescreen for this change in occupancy project is approved it will be routed as a major TI.
Please let me know if you have any questions.
Adele
|
Payment Received | | | 10/23/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/23/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2013 5:04PM
|