Second Notice | | 6/21/2018 | 7/10/2018 | | DONE |
|
|
|
mailed 7-11-18
|
First Notice | | 6/9/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
Print Occupancy Form | | | 5/30/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/30/2018 | | DONE |
|
|
|
|
BLD-Final | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Jim Sly
|
|
|
Please call ahead for access - Jessie Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
jesse Phone #: ###-####
|
FIRE-Final Inspection | 5/17/2018 | 5/21/2018 | 5/21/2018 | A | CANC |
Troy Cobbley
|
|
|
Scheduled for the wrong day.
Jesse Phone #: ###-####
|
FIRE-Final Inspection | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | CANC |
Troy Cobbley
|
|
|
Jesse Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/11/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/7/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/7/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Plan assigned to (CJW) | 4/4/2018 | 4/4/2018 | 5/5/2018 | | PASS |
Carl Westfall
|
|
|
x plan mod (River Valley Church)
|
Plan Reviewer's activity | | | 5/5/2018 | | PASS |
|
|
|
Plan mod approved
|
Routing - PLANNING | 5/1/2018 | | 5/3/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - FIRE | 5/1/2018 | | 5/2/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
Changes to egress system reviewed by building plans examiner no change to original fire plan review
|
Routing - PLAN CHECK | 4/30/2018 | | 5/1/2018 | | PASS |
Carl Westfall
|
|
|
1st plan mod approved
|
Plan Modification Accepted | | | 4/30/2018 | | DONE |
|
|
|
Workflow in ePlanReview received.
|
Plan Modification Accepted | | | 4/4/2018 | | DONE |
|
|
|
plan mod accepted-sheets A0.1 code reivew, plans. Revisions are clouded and marked with delta-2 dated 9/27/17-added exiting to separate assembly spaces-assigned to Carl W
|
FIRE-Final Inspection | 2/21/2018 | 2/23/2018 | 2/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide revised city approved plans for deletion of the exit doors, provide evac plans as per note 23, repair the two north corridor exit signs, provide a K class extinguisher in the Kitchen, provide final inspection for the fire alarm permit, provide elecrical covers in the Nursery.
Jessy Phone #: ###-####
|
FIRE-Final Inspection | 2/20/2018 | 2/21/2018 | 2/20/2018 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for Friday. Jesse Phone #: ###-####
|
BLD-Final | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | NR |
Jim Sly
|
|
|
Jessie Phone #: ###-#### Need Fire Final.
|
FIRE-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | FAIL |
Troy Cobbley
|
|
|
I only had time for a quick curtesy walk through today. Need the project related fire alarm and fire sprinkler permits finaled. Need ADA compliant hardware for all new doors, plans need to be re-submitted showing the three exteriro doors deleted with their associated exit signs and discharge lights, missing exit signs in Santuary, non-functional sings in Lobby and Santuary, need code compliant hood and suppression system for the type 1 hood in the Kitchen as noted on the approved drawings, missing electric alarm sprinkler bell, missing exit signs in the existing Classroom portion of building as shown on the plans. ....ect. No fire dept review notes on site.
Jessie Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Jim Sly
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 6/13/2017 | 6/14/2017 | 6/14/2017 | P | PASS |
Jim Sly
|
|
|
Ron Phone #: ###-#### OK to Rock.
|
BLD-Conference | 5/4/2017 | 5/8/2017 | 5/8/2017 | A | DONE |
Jim Sly
|
|
|
Met with Tim ....Staff member in charge of Constr. Phase 1.....Sanctuary and Mezzanine remodel appear complete......Phase 2 area is being framed by new contractor. WIP Advised Tim to have Crane alarm and Phoenix Fire to call in for inspection for areas that are completed to obtain a "partial" Pass inspection for those areas.
|
FIRE-Conference | 12/6/2016 | 12/6/2016 | 12/6/2016 | P | DONE |
Scott Arellano
|
|
|
Onsite visit to check on progress and meet with owner. Construction work remains in progress. Advised owners representatives to have fire protection contractors call in for testing and inspection of completed systems for partial completion.
|
FIRE-Conference | 12/2/2016 | 12/2/2016 | 12/5/2016 | A | DONE |
Troy Cobbley
|
|
|
See Jim Sly's entry from speaking to the church staff
|
BLD-Conference | 12/2/2016 | 12/2/2016 | 12/2/2016 | A | DONE |
Jim Sly
|
|
|
Talked to Jim Brennen and Pastor Chris. Talked to them about 180 day permit expiration. Slow progress.......fired GC .......volunteer help. WIP.
|
BLD-Framing/Rough-in | 5/9/2016 | 5/11/2016 | 5/11/2016 | A | PART |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior wood framed demissing walls on 2nd.floor ok. Needs electrical rough in inspection, and fire sprinkler inspection. Also needs to foam all penetrations in bottom and top plates.
|
BLD-Framing/Rough-in | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PASS |
Mike Jordan
|
|
|
TIM// PLEASE CALL BEFORE Phone #: ###-####. 2nd floor infill.
|
Meeting | | | 2/17/2015 | | DONE |
|
|
|
Change of GC per James Brennan, came into office. J&L constrution no longer on job. Parcel owner is new GC, see attached form.
|
BLD-Framing/Rough-in | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PART |
Jim Sly
|
|
|
Russ Phone #: ###-#### Walls, Stairs and ramps around and behind stage.
|
BLD-Framing/Rough-in | 8/13/2014 | 8/14/2014 | 8/14/2014 | P | PART |
Jim Sly
|
|
|
partial framing // Russ Phone #: ###-#### OK to one side long wall at mezzanine.....small wall behind platform.
|
OVERRIDE | | | 2/25/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/25/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 2/25/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/25/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 11/15/2013 | 11/15/2013 | 2/11/2014 | | PASS |
Carl Westfall
|
|
|
RIVER VALLEY CHURCH - ePlanReview - Level 3 TI (20 days - Dec 12)
|
Routing - PLAN CHECK | 2/10/2014 | | 2/11/2014 | | PASS |
Carl Westfall
|
|
|
Drawings approved after the 3rd review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/10/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/24/2014 | | 1/31/2014 | | DONE |
Carl Westfall
|
|
|
Waiting for other agencies to complete their review.
(1-31-14) Routing completed
|
Plan resubmittals requested | | | 1/31/2014 | | DONE |
|
|
|
|
Routing - FIRE | 1/22/2014 | | 1/27/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 01-27-2014
|
Routing PW Sewer Rating | 1/22/2014 | | 1/24/2014 | | PASS |
Connie Baumgartner
|
|
|
The shower has been deleted.
|
Routing - PLAN CHECK | 1/16/2014 | | 1/24/2014 | | FAIL |
Carl Westfall
|
|
|
The door swing for "River Valley Experience 100" was changed so that the doors no longer swing in the direction of egress travel. Provide more information about the use of this room. Is it used for assembly? Revise the drawings to show the doors swinging in the direction of egress travel.
|
Plan resubmittals received | | | 1/16/2014 | | DONE |
|
|
|
Resubmittal received at about 2:00 PM. Because of a scheduled vacation day, a weekend, a holiday, and a training day, the start of the resubmittal review was delayed until Jan 22.
|
Routing - PLAN CHECK | 11/15/2013 | | 12/12/2013 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required.
|
Plan resubmittals requested | | | 12/12/2013 | | DONE |
|
|
|
|
1st review completed | | | 12/12/2013 | | DONE |
|
|
|
|
Routing - FIRE | 11/15/2013 | 11/15/2013 | 11/25/2013 | | FAIL |
Scott Arellano
|
|
|
See Fire Plan 1st Review Report
|
Route to Impact Fee Review | 11/15/2013 | 11/20/2013 | 11/19/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 11/15/2013 | | 11/19/2013 | | PASS |
Bill VanDegrift
|
|
|
1. May require a DCVA on water service if one is not present.
2. Tempered water required at public lavs.
|
Routing - Erosion and Sediment | 11/15/2013 | | 11/18/2013 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLANNING | 11/15/2013 | | 11/15/2013 | | PASS |
Sue Cummings
|
|
|
Sue Cummings - CZC13-00207
|
Intake Approval | | | 11/15/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 11/15/2013 | | 11/15/2013 | | DONE |
Jason Blais
|
|
|
|
Routing PW Sewer Rating | 11/15/2013 | | 11/15/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 11/15/2013 | | 11/15/2013 | | PASS |
Brian Murphy
|
|
|
less 1000 ft2
|
Routing - Addressing | 11/15/2013 | | 11/15/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 11/15/2013 | | 11/15/2013 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 11/8/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please revise the plans to include the items from Addendum #1 and 2 that you have submitted 11/8/13 as the plans have not yet been accepted for review.
Thank you
|
Plan Reviewer's activity | | | 11/1/2013 | | DONE |
Jason Blais
|
|
|
No ACHD impact fees or inspection required per email from Christy Little.
|
Intake Approval | | | 10/29/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
I have uploaded the 518 check list and circled the items that will need to be addressed prior to approving the prescreen.
On page 2-with the cafe and the nursery please contact Central District Health. If they do not require you to submit to them please provide documentation from them indicating such.
On page 3- I have uploaded the 707 esc form for you to review. You will need to submit the appropriate ESC documents. If you have questions on the ESC requirements please contact Evan Jenkins at ###-####.
On page 6- the heating and cooling loads are not shown on the pages indicated.
Thank you
|
Application received | | | 10/24/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2013 9:56AM
|