Permit Information
Permit NumberBLD13-02973
StatusFinaled
Name J & L DEVELOPMENT LTD CORP
Site Address 1115 N GARDEN ST
Project NameRiver Valley Church
Customer Number 
ePlanReviewYes
Description
(RIVER VALLEY CHURCH) (5-5-18 PLAN MODIFICATION TO DELETE A SIDE EXIT DOOR TO THE OUTSIDE FROM THE SANCTUARY AND TO DELETE AN EXIT DOOR TO THE OUTSIDE FROM THE MULTI-PURPOSE ROOM. THE SIDE ROWS OF CHAIRS IN THE SANCTUARY WERE EVALUATED AS SINGLE ACCESS AISLES ONLY. A 48 INCH AISLE IS REQUIRED BETWEEN THE FRONT SEATS AND THE PLATFORM TO ENSURE A ROUTE ACCESSIBLE TO THE DISABLED AND TO ENSURE A BALANCED EGRESS SYSTEM FROM THE PLATFORM. THE MINIMUM AISLE AND AISLE ACCESSWAY WIDTHS WERE REDLINED ON THE DRAWINGS. SEE SHEET A2.2.) Fire sprinklers used for building area increase, story increase, and for fire area. To remodel an existing 16,442 square foot church building (14,750 square foot 1st story and 1,692 square foot 2nd story). Work is to include 5 restrooms accessible to the disabled, a 2nd story toilet room accessible to the disabled, interior nonbearing walls, interior doors, a platform within the Sanctuary, stairways and a ramp to serve the new platform, other interior ramps and stairs, exterior doors, exterior windows, a direct vent gas fireplace, and interior finishes. The existing Sanctuary mezzanine will be incorporated into the existing 2nd story. Structural work includes new openings in existing masonry walls, steel headers and jambs at those new wall openings, box headers at new openings in the exterior walls of the pre-engineered metal building portion of this structure, a new exterior steel canopy and trellis with concrete footings, and new overbuilt floors and pony walls on the 2nd story to make the entire floor surface of the 2nd story at the same elevation. Special Inspection is required for welding, epoxy anchors, and expansion anchors. The pre-engineered trusses located within the Sanctuary and intended to support theatrical lighting, projection screens, etc. and the attachment of the trusses to existing steel beams are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. If the building will be occupied during construction, precautions approved by the Fire Department to ensure safe egress shall be implemented. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/21/20187/10/2018 DONE
mailed 7-11-18
First Notice 6/9/20186/11/2018 DONE
mailed 6-12
Print Occupancy Form  5/30/2018 DONE
Permanent Occupancy  5/30/2018 DONE
BLD-Final5/22/20185/23/20185/23/2018APASS
DetailsJim Sly
Please call ahead for access - Jessie Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection5/21/20185/22/20185/22/2018APASS
DetailsTroy Cobbley
Life safety passed

jesse Phone #: ###-####
FIRE-Final Inspection5/17/20185/21/20185/21/2018ACANC
DetailsTroy Cobbley
Scheduled for the wrong day.

Jesse Phone #: ###-####
FIRE-Final Inspection5/16/20185/17/20185/17/2018ACANC
DetailsTroy Cobbley
Jesse Phone #: ###-####
CHANGE STATUS TO (ISS)  5/11/2018 DONE
Print Occupancy Form  5/11/2018 DONE
OVERRIDE  5/7/2018  
Permit Ready to Issue  5/7/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan assigned to (CJW)4/4/20184/4/20185/5/2018 PASS
DetailsCarl Westfall
x plan mod (River Valley Church)
Plan Reviewer's activity  5/5/2018 PASS
Plan mod approved
Routing - PLANNING5/1/2018 5/3/2018 PASS
DetailsSue Cummings
Routing - FIRE5/1/2018 5/2/2018 CANC
DetailsAdele J Schaffeld-Griffin
Changes to egress system reviewed by building plans examiner no change to original fire plan review
Routing - PLAN CHECK4/30/2018 5/1/2018 PASS
DetailsCarl Westfall
1st plan mod approved
Plan Modification Accepted  4/30/2018 DONE
Workflow in ePlanReview received.
Plan Modification Accepted  4/4/2018 DONE
plan mod accepted-sheets A0.1 code reivew, plans. Revisions are clouded and marked with delta-2 dated 9/27/17-added exiting to separate assembly spaces-assigned to Carl W
FIRE-Final Inspection2/21/20182/23/20182/23/2018AFAIL
DetailsTroy Cobbley
Provide revised city approved plans for deletion of the exit doors, provide evac plans as per note 23, repair the two north corridor exit signs, provide a K class extinguisher in the Kitchen, provide final inspection for the fire alarm permit, provide elecrical covers in the Nursery.

Jessy Phone #: ###-####
FIRE-Final Inspection2/20/20182/21/20182/20/2018ACANC
DetailsTroy Cobbley
To be rescheduled for Friday. Jesse Phone #: ###-####
BLD-Final8/21/20178/22/20178/22/2017PNR
DetailsJim Sly
Jessie Phone #: ###-####
Need Fire Final.
FIRE-Final Inspection8/21/20178/22/20178/22/2017AFAIL
DetailsTroy Cobbley
I only had time for a quick curtesy walk through today. Need the project related fire alarm and fire sprinkler permits finaled. Need ADA compliant hardware for all new doors, plans need to be re-submitted showing the three exteriro doors deleted with their associated exit signs and discharge lights, missing exit signs in Santuary, non-functional sings in Lobby and Santuary, need code compliant hood and suppression system for the type 1 hood in the Kitchen as noted on the approved drawings, missing electric alarm sprinkler bell, missing exit signs in the existing Classroom portion of building as shown on the plans. ....ect. No fire dept review notes on site.

Jessie Phone #: ###-####
BLD-Ceiling Grid Inspection8/15/20178/16/20178/16/2017APASS
DetailsJim Sly
Ron Phone #: ###-####
BLD-Framing/Rough-in6/13/20176/14/20176/14/2017PPASS
DetailsJim Sly
Ron Phone #: ###-####
OK to Rock.
BLD-Conference5/4/20175/8/20175/8/2017ADONE
DetailsJim Sly
Met with Tim ....Staff member in charge of Constr. Phase 1.....Sanctuary and Mezzanine remodel appear complete......Phase 2 area is being framed by new contractor. WIP Advised Tim to have Crane alarm and Phoenix Fire to call in for inspection for areas that are completed to obtain a "partial" Pass inspection for those areas.
FIRE-Conference12/6/201612/6/201612/6/2016PDONE
DetailsScott Arellano
Onsite visit to check on progress and meet with owner. Construction work remains in progress. Advised owners representatives to have fire protection contractors call in for testing and inspection of completed systems for partial completion.
FIRE-Conference12/2/201612/2/201612/5/2016ADONE
DetailsTroy Cobbley
See Jim Sly's entry from speaking to the church staff
BLD-Conference12/2/201612/2/201612/2/2016ADONE
DetailsJim Sly
Talked to Jim Brennen and Pastor Chris. Talked to them about 180 day permit expiration. Slow progress.......fired GC .......volunteer help. WIP.
BLD-Framing/Rough-in5/9/20165/11/20165/11/2016APART
DetailsMike Jordan
Jim Phone #: ###-####. Interior wood framed demissing walls on 2nd.floor ok. Needs electrical rough in inspection, and fire sprinkler inspection. Also needs to foam all penetrations in bottom and top plates.
BLD-Framing/Rough-in4/6/20164/7/20164/7/2016APASS
DetailsMike Jordan
TIM// PLEASE CALL BEFORE Phone #: ###-####. 2nd floor infill.
Meeting  2/17/2015 DONE
Change of GC per James Brennan, came into office. J&L constrution no longer on job. Parcel owner is new GC, see attached form.
BLD-Framing/Rough-in10/10/201410/13/201410/13/2014APART
DetailsJim Sly
Russ Phone #: ###-####
Walls, Stairs and ramps around and behind stage.
BLD-Framing/Rough-in8/13/20148/14/20148/14/2014PPART
DetailsJim Sly
partial framing // Russ Phone #: ###-####
OK to one side long wall at mezzanine.....small wall behind platform.
OVERRIDE  2/25/2014  
Issue PAID IN FULL permit  2/25/2014 DONE
DetailsChristina Prado
Print Occupancy Form  2/25/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  2/25/2014 DONE
DetailsChristina Prado
Plan assigned to (CJW)11/15/201311/15/20132/11/2014 PASS
DetailsCarl Westfall
RIVER VALLEY CHURCH - ePlanReview - Level 3 TI (20 days - Dec 12)
Routing - PLAN CHECK2/10/2014 2/11/2014 PASS
DetailsCarl Westfall
Drawings approved after the 3rd review.
PLANS/APPL TAKEN TO FRONT DESK  2/11/2014 DONE
Plan resubmittals received  2/10/2014 DONE
Routing - PLAN CHECK1/24/2014 1/31/2014 DONE
DetailsCarl Westfall
Waiting for other agencies to complete their review.

(1-31-14) Routing completed
Plan resubmittals requested  1/31/2014 DONE
Routing - FIRE1/22/2014 1/27/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 01-27-2014
Routing PW Sewer Rating1/22/2014 1/24/2014 PASS
DetailsConnie Baumgartner
The shower has been deleted.
Routing - PLAN CHECK1/16/2014 1/24/2014 FAIL
DetailsCarl Westfall
The door swing for "River Valley Experience 100" was changed so that the doors no longer swing in the direction of egress travel. Provide more information about the use of this room. Is it used for assembly? Revise the drawings to show the doors swinging in the direction of egress travel.
Plan resubmittals received  1/16/2014 DONE
Resubmittal received at about 2:00 PM. Because of a scheduled vacation day, a weekend, a holiday, and a training day, the start of the resubmittal review was delayed until Jan 22.
Routing - PLAN CHECK11/15/2013 12/12/2013 FAIL
DetailsCarl Westfall
Revised drawings required.
Plan resubmittals requested  12/12/2013 DONE
1st review completed  12/12/2013 DONE
Routing - FIRE11/15/201311/15/201311/25/2013 FAIL
DetailsScott Arellano
See Fire Plan 1st Review Report
Route to Impact Fee Review11/15/201311/20/201311/19/2013 PASS
DetailsCindy M. Gould
Routing - PLUMBING11/15/2013 11/19/2013 PASS
DetailsBill VanDegrift
1. May require a DCVA on water service if one is not present.
2. Tempered water required at public lavs.
Routing - Erosion and Sediment11/15/2013 11/18/2013 PASS
DetailsEvan Jenkins
Routing - PLANNING11/15/2013 11/15/2013 PASS
DetailsSue Cummings
Sue Cummings - CZC13-00207
Intake Approval  11/15/2013 PASS
DetailsJason Blais
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
Pending Assignment by JCB11/15/2013 11/15/2013 DONE
DetailsJason Blais
Routing PW Sewer Rating11/15/2013 11/15/2013 PASS
DetailsConnie Baumgartner
Routing PW Drainage11/15/2013 11/15/2013 PASS
DetailsBrian Murphy
less 1000 ft2
Routing - Addressing11/15/2013 11/15/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS11/15/2013 11/15/2013 PASS
DetailsBeverly Mountain
Intake Approval  11/8/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Please revise the plans to include the items from Addendum #1 and 2 that you have submitted 11/8/13 as the plans have not yet been accepted for review.

Thank you
Plan Reviewer's activity  11/1/2013 DONE
DetailsJason Blais
No ACHD impact fees or inspection required per email from Christy Little.
Intake Approval  10/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
I have uploaded the 518 check list and circled the items that will need to be addressed prior to approving the prescreen.

On page 2-with the cafe and the nursery please contact Central District Health. If they do not require you to submit to them please provide documentation from them indicating such.

On page 3- I have uploaded the 707 esc form for you to review. You will need to submit the appropriate ESC documents. If you have questions on the ESC requirements please contact Evan Jenkins at ###-####.

On page 6- the heating and cooling loads are not shown on the pages indicated.

Thank you
Application received  10/24/2013 DONE
Application submitted via PDS Online on Oct 24 2013 9:56AM