Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02983
StatusIssued
Name BRUCE POE
Site Address 794 W BROAD ST
Project NameLitharachnium Sculpture
Customer Number 
ePlanReviewYes
Description
(LITHARACHNUMN SCULPTURE) 2/24/14 approval for revised location on site plan. Permit to construct and install a new art structure/sculpture at 794 W Broad St. Location per approved plans. Statement of Special Inspection in documents. Work to include: install a prefabricated art structure with anchor bolts onto a new footing. All work shall be per the approved plans, attached Engineering and Structural Inspectors approval. See special inspection form for required special inspections. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing3/6/20143/7/20143/8/2014PPASS
DetailsDave Hannah
Curt Phone #: ###-####
OVERRIDE  3/5/2014  
Issue PAID IN FULL permit  3/5/2014 DONE
DetailsTisha Gallop
Architect is General Contractor
Inspection Record Card- Bld  3/5/2014 DONE
DetailsTisha Gallop
Permit Ready to Issue  3/5/2014 DONE
DetailsTisha Gallop
Routing - PLANNING2/21/2014 2/25/2014 PASS
DetailsSarah Schafer
Ok per revised location. JGW 2-25-14
Plan assigned to (AJS)2/24/20142/24/20142/24/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/24/2014 DONE
Routing - PLAN CHECK2/21/2014 2/24/2014 PASS
DetailsAdele J Schaffeld-Griffin
Plan assigned to (AJS)11/12/201311/12/201311/21/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 11/25 Level 2
Routing - PLAN CHECK11/21/2013 11/21/2013 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/21/2013 DONE
Routing - PLAN CHECK11/20/2013 11/20/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan
1st review completed  11/18/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK11/12/2013 11/18/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan
Routing - PLANNING11/12/2013 11/14/2013 PASS
DetailsSarah Schafer
Routing - Erosion and Sediment11/12/2013 11/13/2013 PASS
DetailsAndy J. Long
Intake Approval  11/12/2013 PASS
DetailsAdele J Schaffeld-Griffin
Intake Approval  10/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
1 Please re upload the drawings to read left to right.
2 Please upload the engineering calculations in the documents folder
3 Please up load the 304 design professional form.

This project will be moved to a Major when routed.

thank you
Application received  10/24/2013 DONE
Application submitted via PDS Online on Oct 24 2013 3:27PM