Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03050
StatusFinaled
Name ESI
Site Address 1001 E PARKCENTER BLVD
Project NameK-Mart
Customer Number 
ePlanReviewYes
Description
(K-MART – Interior Non-structural Demo and Minor T.I.) This permit is to perform mostly interior non-structural demolition. Scope of work includes: adding a new exterior opening into CMU wall, installing an access later and hatch, construct two interior non-combustable walls to isolate a service area, removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, and removal of some existing light fixtures. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. All building sprinkler and alarm systems must be maintained throughout the demo and after demo is completed.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/6/2016 DONE
Second Notice 2/7/20142/4/2014 DONE
Print Statement  2/4/2014 DONE
DetailsTisha Gallop
mailed to ESI
First Notice1/24/20141/24/20141/28/2014 DONE
DetailsJim Storey
BLD-Final1/23/20141/24/20141/24/2014PPASS
DetailsJim Storey
craig Phone #: ###-####
DOC - Permit Finaled1/24/20141/24/20141/24/2014PPASS
DetailsJim Storey
FIRE-Final Inspection1/22/20141/22/20141/22/2014PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in12/19/201312/19/201312/19/2013PPART
DetailsJim Sly
tim Phone #: ###-####
All full height walls located near riser room had 5/8 fire code rock....each side.....and screwed per 1 hr rated wall standards. Walls may have to be rated and closed (with door) at a later date......or on a T I permit.
FIRE-Conference12/16/201312/16/201312/17/2013PDONE
DetailsForrest France
Regarding project related fire alarm work.
BLD-Framing/Rough-in12/12/201312/13/201312/13/2013APASS
DetailsJim Storey
craig - after 10:00 please Phone #: ###-####
OVERRIDE  11/26/2013  
Inspection Record Card- Bld  11/26/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  11/26/2013 DONE
DetailsChristina Prado
Telephone call  11/26/2013 DONE
DetailsChristina Prado
called and gave Don final fees due
Permit Ready to Issue  11/26/2013 DONE
DetailsChristina Prado
Plan resubmittals received  11/19/2013 DONE
DetailsTim L. Woodard
E-Plan TLW
Routing - PLAN CHECK11/19/2013 11/19/2013 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  11/19/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)11/1/2013 11/19/2013 PASS
DetailsTim L. Woodard
Routing - PLANNING11/1/2013 11/12/2013 PASS
DetailsAndrea Tuning
1st review completed  11/12/2013 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment11/1/2013 11/4/2013 PASS
DetailsEvan Jenkins
Routing - FIRE11/1/2013 11/4/2013 PASS
DetailsCraig D. Hanson
See attached letter
Routing PW Sewer Rating11/1/2013 11/1/2013 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS11/1/2013 11/1/2013 PASS
DetailsBeverly Mountain
Routing - Addressing11/1/2013 11/1/2013 PASS
DetailsEmily Dixon
Routing - PLAN CHECK11/1/2013 11/1/2013 FAIL
DetailsTim L. Woodard
Intake Approval  11/1/2013 PASS
DetailsTim L. Woodard
Payment Received  10/31/2013 DONE
Payment received via Govolutions
Application received  10/30/2013 DONE
Application submitted via PDS Online on Oct 30 2013 4:30PM