Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03066
StatusFinaled
Name WINTERS ELECTRIC LLC
Site Address 9095 S FEDERAL WAY STE Unit: 106
Project NameSagatron Group Warehouse TI
Customer Number 
ePlanReviewYes
Description
(SAGATRON GROUP– BERRY FAMILY BLDG) (Suite 106)This building is fire sprinklered for area increase. Permit is to add 1,892 sq feet tenant space to existing 9,426 sq foot occupied warehouse tenant space for a total of 11,318 sq ft. The new square footage is the first time this space is being occupied. The building shell was constructed under BLD07-02112. The certificate of occupancy for the existing space was issued under BLD12-02367. Work is to include: new electrical. Door hardware and interior finish was installed and approved under the shell permit. Racks over 8 feet will require a separate permit. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/10/20143/7/2014 DONE
First Notice 2/2/20142/28/2014 DONE
DetailsChristina Prado
mailed 2/28
Permanent Occupancy  1/23/2014 DONE
DetailsChristina Prado
BLD-Final1/16/20141/16/20141/16/2014PPASS
DetailsJim Storey
Brandon Phone #: ###-####
BLD-Final1/10/20141/13/20141/13/2014PNR
DetailsJim Storey
Brandon Phone #: ###-#### ele failled
FIRE-Final Inspection1/10/20141/13/20141/13/2014APASS
DetailsForrest France
Fire life safety inspection passed.
Issue PAID IN FULL permit  12/31/2013 DONE
DetailsChristina Prado
Print Occupancy Form  12/31/2013 DONE
DetailsChristina Prado
Plan assigned to (AJS)12/18/201312/18/201312/18/2013 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  12/18/2013 DONE
Permit Ready to Issue  12/18/2013 DONE
DetailsTisha Gallop
Plan Modification Accepted  12/18/2013 DONE
DetailsAdele J Schaffeld-Griffin
workflow restarted to remove mechanical work initially submitted. Permit was never issued, so this is resubmittal.
Routing - PLAN CHECK12/18/2013 12/18/2013 PASS
DetailsAdele J Schaffeld-Griffin
removed 2 mechanical sheets per letter from architect in documents not needed for this project to be code compliant.
Plan Reviewer's activity  11/19/2013 DONE
DetailsJason Blais
No ACHD impact fees or inspection needed per email from Christy Little.
Plan assigned to (AJS)11/1/201311/1/201311/14/2013 DONE
DetailsAdele J Schaffeld-Griffin
Due 11/14 Level II
Routing - PLAN CHECK11/1/2013 11/14/2013 PASS
DetailsAdele J Schaffeld-Griffin
Routing - FIRE11/1/2013 11/14/2013 PASS
DetailsCraig D. Hanson
see report for comments
Routing PW Environmental11/1/2013 11/14/2013 PASS
DetailsWalt Baumgartner
signed off in e plan
1st review completed  11/14/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/14/2013 DONE
Routing - PUBLIC WORKS11/1/2013 11/1/2013 PASS
DetailsBeverly Mountain
Routing - Addressing11/1/2013 11/1/2013 PASS
DetailsEmily Dixon
Intake Approval  11/1/2013 PASS
DetailsAdele J Schaffeld-Griffin
Payment Received  10/31/2013 DONE
Payment received via Govolutions
Application received  10/31/2013 DONE
Application submitted via PDS Online on Oct 31 2013 3:23PM