Permanent Occupancy | | | 2/21/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/7/2014 | 1/7/2014 | 1/8/2014 | P | PASS |
Dave Hannah
|
|
|
Ann Phone #: ###-####
|
BLD-Final | 11/4/2013 | 11/7/2013 | 11/8/2013 | A | PART |
Dave Hannah
|
|
|
call 1/2 hr before to meet// Anne Langston Phone #: ###-#### ok for temp occ needs handrails on back steps
|
FIRE-Final Inspection | 11/5/2013 | 11/6/2013 | 11/6/2013 | P | PASS |
Forrest France
|
|
|
Correction items finished. Life safety passed.
|
FIRE-Final Inspection | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | FAIL |
Forrest France
|
|
|
Correction items include: post building address numbers, post fire extinguishers with current tags at both the first and second floors as discussed, provide approved hardware at the main entry/exit door.
|
Plan assigned to (TLW) | 11/1/2013 | | 11/4/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/1/2013 | | 11/4/2013 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 11/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/4/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 11/4/2013 | | DONE |
Christina Prado
|
|
|
called Sam to advise permit is ready for pick up
|
Permit Ready to Issue | | | 11/4/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 11/4/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 11/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2013 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 3/3/2014 | | | |
|
|
|
|
Application received | | 10/31/2013 | | | |
|
|
|
|