BLD-Final | 5/20/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Dave Hannah
|
|
|
Bryan Phone #: ###-####
|
DOC - Permit Finaled | 5/21/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/19/2014 | 5/20/2014 | 5/20/2014 | P | FAIL |
Dave Hannah
|
|
|
Bryan Phone #: ###-#### c/n on site
|
PubWorks Occupancy Approval | 5/20/2014 | 5/20/2014 | 5/20/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 3/7/2014 | 3/11/2014 | 3/11/2014 | A | PASS |
Mike Jordan
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2014 | 3/11/2014 | 3/11/2014 | A | PASS |
Mike Jordan
|
|
|
Bryan Phone #: ###-####.All framing issues have been repaired.
|
BLD-Framing/Rough-in | 3/6/2014 | 3/6/2014 | 3/7/2014 | P | PART |
Dave Hannah
|
|
|
bryan Phone #: ###-#### c/n on site ok to insulate
|
BLD-Foundation | 12/27/2013 | 12/27/2013 | 12/31/2013 | A | PASS |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
BLD-Foundation | 12/24/2013 | 12/26/2013 | 12/31/2013 | P | PASS |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
BLD-Footing | 12/13/2013 | 12/16/2013 | 12/16/2013 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 12/11/2013 | 12/13/2013 | 12/12/2013 | A | CANC |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
BLD-Footing | 12/3/2013 | 12/5/2013 | 12/5/2013 | A | CANC |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
PubWorks Subgrade Approval | 12/3/2013 | 12/3/2013 | 12/3/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/25/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 11/21/2013 | | |
|
|
|
|
Plan assigned to (JG) | | 11/5/2013 | 11/21/2013 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 11/22 L2
|
Application received | | 11/4/2013 | 11/21/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/18/2013 | | 11/21/2013 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 11/21/2013 | | DONE |
Tisha Gallop
|
|
|
called Doug Lasher Const. and left vm permit is ready and fee due.
|
Case Summary (BLD) | | | 11/21/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2013 | | |
|
|
|
|
Telephone call | | | 11/21/2013 | | DONE |
|
|
|
Spoke with Gary Lawson on rear patio floor beam that failed and he told me 3- 1.75x18 ML would be OK per strucalcs
|
Inspection Record Card- Bld | | | 11/21/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 11/21/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 11/20/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A-102, A-103, S-101, S-105, S-106 & S-109;Taken to javier for review
|
Plan resubmittals received | | | 11/19/2013 | | |
|
|
|
11-19-13 received 3 copies of sheets A-102,S-101,S-105,S-106,S-109 sent to Javier
|
Routing - PLAN CHECK | 11/15/2013 | | 11/18/2013 | | FAIL |
Javier Guzman
|
|
|
11/18 emailed applicant review report
|
1st review completed | | | 11/18/2013 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 11/12/2013 | | 11/15/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - MECHANICAL | 11/8/2013 | | 11/12/2013 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 11/12/2013 | | 11/12/2013 | | PASS |
Andy J. Long
|
|
|
ESCP is complete and approved
|
Routing - PLANNING | 11/7/2013 | | 11/8/2013 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 11/5/2013 | | 11/7/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 11/7/2013 | | 11/7/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 11/7/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 11/5/2013 | 11/8/2013 | 11/6/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/5/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/5/2013 | | PASS |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 11/5/2013 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/4/2013 | | FAIL |
Christina Prado
|
|
|
Need ESC plans incorp into full set, ResCheck and Soils & Geotech
|