BLD-Final | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Dave Hannah
|
|
|
duane Phone #: ###-#### - call 30 mins prior
|
DOC - Permit Finaled | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | PART |
Jim Sly
|
|
|
Please call for access - Dwayne Phone #: ###-#### 1st and 2nd floor rooms of the house....OK to cover. (no stairway).
|
Routing Walk-In (BLD) | 12/10/2013 | 12/10/2013 | 12/10/2013 | A | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 12/10/2013 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/10/2013 | | |
|
|
|
|
Routing Walk-In (BLD) | 12/4/2013 | 12/4/2013 | 12/4/2013 | A | PASS |
Perry Paine
|
|
|
questions on the submittal requirements to ammend the existing permit. pep
|
Routing Walk-In (BLD) | 12/3/2013 | 12/3/2013 | 12/4/2013 | A | DONE |
Perry Paine
|
|
|
|
BLD-Footing | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Dave Hannah
|
|
|
DUANE Phone #: ###-####
|
PubWorks Subgrade Approval | 11/26/2013 | 11/26/2013 | 11/26/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | FAIL |
Dave Hannah
|
|
|
DUANE Phone #: ###-#### needs geo tec sign off
|
Routing Walk-In (BLD) | 11/12/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Carl D Madsen
|
|
|
added windows
|
Case Summary (BLD) | | | 11/12/2013 | | DONE |
|
|
|
|
Application received | | 11/5/2013 | 11/5/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 11/5/2013 | 11/5/2013 | 11/5/2013 | A | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 11/5/2013 | 11/5/2013 | 11/5/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 11/5/2013 | 11/5/2013 | 11/5/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2013 | | |
|
|
|
|
1st review completed | | | 11/5/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/5/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/5/2013 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/5/2013 | | 11/5/2013 | | PASS |
Jim Wyllie
|
|
|
A letter from the applicants geotechnical engineer indicating that the column subrade is acceptable must be approved by Public Works prior to scheduling footing inspection. Call Jason Taylor at ###-####.
|