Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-03109
StatusFinaled
Name HIGH DESERT BUILDING SERVICES LLC
Site Address 2092 E PARKSIDE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
***12-10-2013 THIS PERMIT IS MODIFIED TO REFLECT THE CUTTING IN OF A NEW DOOR FROM THE LAUNDRY ROOM TO THE STORAGE ROOM AT THE REAR OF THE GARAGE 12-10-13 PEP N / A ADDED VALUE. PEP*** MODIFICATION TO ADD WINDOWS PER THE ELEVATIONS.This project is for the reconfiguration of the main entry area to the 2nd level of an existing single family dwelling. The project will include the infill of an existing atrium clear story with the removal of an interior spiral stair and the construction of a new upper level landing and stairs to the existing main level grade. Separate electrical permit is required. R-1B ok per Leon Letson. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/3/20144/3/20144/3/2014PPASS
DetailsDave Hannah
duane Phone #: ###-#### - call 30 mins prior
DOC - Permit Finaled4/3/20144/3/20144/3/2014PPASS
DetailsDave Hannah
BLD-Framing/Rough-in12/30/201312/31/201312/31/2013APART
DetailsJim Sly
Please call for access - Dwayne Phone #: ###-####
1st and 2nd floor rooms of the house....OK to cover. (no stairway).
Routing Walk-In (BLD)12/10/201312/10/201312/10/2013APASS
DetailsPerry Paine
Case Summary (BLD)  12/10/2013  
Inspection Record Card- Bld  12/10/2013  
Routing Walk-In (BLD)12/4/201312/4/201312/4/2013APASS
DetailsPerry Paine
questions on the submittal requirements to ammend the existing permit. pep
Routing Walk-In (BLD)12/3/201312/3/201312/4/2013ADONE
DetailsPerry Paine
BLD-Footing11/25/201311/26/201311/26/2013APASS
DetailsDave Hannah
DUANE Phone #: ###-####
PubWorks Subgrade Approval11/26/201311/26/201311/26/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing11/18/201311/19/201311/19/2013AFAIL
DetailsDave Hannah
DUANE Phone #: ###-#### needs geo tec sign off
Routing Walk-In (BLD)11/12/201311/12/201311/12/2013APASS
DetailsCarl D Madsen
added windows
Case Summary (BLD)  11/12/2013 DONE
Application received 11/5/201311/5/2013 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)11/5/201311/5/201311/5/2013ADONE
DetailsLeon Letson
Routing Walk-In (BLD)11/5/201311/5/201311/5/2013ADONE
DetailsPerry Paine
Plan assigned to (PEP)11/5/201311/5/201311/5/2013 PASS
DetailsPerry Paine
Inspection Record Card- Bld  11/5/2013  
1st review completed  11/5/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/5/2013 DONE
Permit Ready to Issue  11/5/2013  
Issue PAID IN FULL permit  11/5/2013 DONE
(F) Reprint permit  11/5/2013 DONE
Routing - PUBLIC WORKS GRADING11/5/2013 11/5/2013 PASS
DetailsJim Wyllie
A letter from the applicants geotechnical engineer indicating that the column subrade is acceptable must be approved by Public Works prior to scheduling footing inspection. Call Jason Taylor at ###-####.