Third Notice | | 7/14/2014 | 7/27/2014 | | DONE |
|
|
|
This permit finaled on the web by Alan Degen
|
Second Notice | | 6/16/2014 | 7/9/2014 | | DONE |
|
|
|
|
First Notice | | 5/3/2014 | 6/6/2014 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 4/23/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/31/2014 | 4/1/2014 | 4/1/2014 | P | PASS |
Tom Arcoraci
|
|
|
Call ahead for access - Keith Phone #: ###-####
|
BLD-Final | 4/1/2014 | 4/1/2014 | 4/1/2014 | P | PASS |
Tom Arcoraci
|
|
|
Call ahead for access - Keith Phone #: ###-####
|
FIRE-Final Inspection | 3/31/2014 | 4/1/2014 | 4/1/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide additional fire extinguisher in the storage room and tag both of them, provide exit discharge lights at atleast two of the exits as discussed and shown on the approved plans. I spoke to the school representative about Fire Dept Review Note #1 which does not allow this building to be used for educational uses unless a fire alarm system is provided.
|
PubWorks Occupancy Approval | 3/31/2014 | 3/31/2014 | 3/31/2014 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 3/28/2014 | 3/28/2014 | 3/28/2014 | P | NR |
Tom Arcoraci
|
|
|
Please call 30min prior for meet and access - Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2014 | 3/7/2014 | 3/7/2014 | P | PASS |
Tom Arcoraci
|
|
|
Roof nailing inspection please-Keith-Please call at least 30 mins prior to insepction Phone #: ###-####
|
BLD-Other | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Tom Arcoraci
|
|
|
call first to make sure he''s there // masonry wall // Keith Phone #: ###-####
|
BLD-Foundation | 1/15/2014 | 1/15/2014 | 1/15/2014 | P | PASS |
Jim Sly
|
|
|
keith - please call 30 minutes prior Phone #: ###-####
|
BLD-Footing | 1/3/2014 | 1/3/2014 | 1/3/2014 | P | PASS |
Jim Storey
|
|
|
keith - please call 1/2 hr prior so he can meet you there Phone #: ###-####
|
BLD-Conference | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 12/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 12/2/2013 | | |
|
|
|
|
Telephone call | | | 12/2/2013 | | DONE |
Christina Prado
|
|
|
SPoke to Alan and gave fees due and advised GC & RP are required prior to issuance
|
Permit Ready to Issue | | | 12/2/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 11/25/2013 | | 11/25/2013 | | PASS |
Cody Riddle
|
|
|
Interior to site, 300'+ from any property line, behind other structures.
|
Routing - PLAN CHECK | 11/25/2013 | | 11/25/2013 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2013 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 11/25/2013 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/15/2013 | | 11/25/2013 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 11/21/2013 | | 11/25/2013 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 11/22/2013 | | DONE |
Tisha Gallop
|
|
|
received response and two copies of plan sheets CS, A2, A6, E1; inserted by arch. and taken back to John Menard.
|
Routing - FIRE | 11/20/2013 | 11/15/2013 | 11/21/2013 | | PASS |
Scott Arellano
|
|
|
See Fire Plan Report
|
1st review completed | | | 11/21/2013 | | FAIL |
|
|
|
Failed Plan Check
|
Plan resubmittals requested | | | 11/20/2013 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 11/19/2013 | | 11/20/2013 | | FAIL |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 11/18/2013 | | 11/19/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative are approved. See attached permit ESC13-01174.
|
Routing - PUBLIC WORKS | 11/15/2013 | | 11/18/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 11/15/2013 | | 11/18/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 11/15/2013 | | 11/15/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 11/15/2013 | | 11/15/2013 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | | | 11/15/2013 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/15/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/15/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/15/2013 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 11/15/2013 | | 11/15/2013 | | DONE |
John Menard
|
|
|
|
Application received | | 11/7/2013 | 11/7/2013 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 11/7/2013 | | FAIL |
Tim L. Woodard
|
|
|
|