BLD-Final | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Foundation | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Tom Arcoraci
|
|
|
Please call ahead for access - Foundation repair - Robert Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. Framing ok. Pending repairs to foundation system per approved repairs. No final or occupancy until foundation has been repaired.
|
Override - Parcel Holds | 1/15/2014 | 1/1/1900 | 1/15/2014 | | |
|
|
|
framing insp
|
BLD-Concrete | 12/24/2013 | 12/24/2013 | 12/24/2013 | A | DONE |
Tom Arcoraci
|
|
|
Attached repair details approved.
|
Override - Parcel Holds | | | 12/24/2013 | | |
|
|
|
|
BLD-Conference | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | PEND |
Tom Arcoraci
|
|
|
300 pm footing/foundation does not appear to be 18 inch deep as per plan and is angled inward
|
BLD-Foundation | 12/6/2013 | 12/9/2013 | 12/9/2013 | A | FAIL |
Tom Arcoraci
|
|
|
call before to meet // Robert Phone #: ###-#### no inspection made set backs appear ok, SWO issued
|
OVERRIDE | | | 11/7/2013 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 11/7/2013 | 11/7/2013 | 11/7/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2013 | | |
|
|
|
|
1st review completed | | | 11/7/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/7/2013 | | | |
|
|
|
|