Case Summary (BLD) | | | 4/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/16/2014 | 4/17/2014 | 4/17/2014 | P | PASS |
Dave Hannah
|
|
|
Don-please call 20 minutes prior Phone #: ###-####
|
DOC - Permit Finaled | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2014 | 4/14/2014 | 4/15/2014 | P | FAIL |
Dave Hannah
|
|
|
Don-PLease call at least 20 mins in advance Phone #: ###-#### needs tempered glass in bathroom
|
BLD-Framing/Rough-in | 1/8/2014 | 1/10/2014 | 1/14/2014 | A | PASS |
Dave Hannah
|
|
|
call 1/2 hr before // Don Phone #: ###-####
|
BLD-Energy code compliance | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Dave Hannah
|
|
|
Don-Please call prior to inspection Phone #: ###-####
|
BLD-Footing | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PASS |
Dave Hannah
|
|
|
Please call ahead for access - Don Phone #: ###-####
|
BLD-Footing | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Dave Hannah
|
|
|
DON Phone #: ###-####
|
OVERRIDE | | | 11/8/2013 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/8/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 11/8/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/8/2013 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2013 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 11/8/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2013 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 11/8/2013 | | DONE |
|
|
|
|
Application received | | 11/8/2013 | | | |
|
|
|
|