DOC - Permit Finaled | | | 12/31/2015 | | DONE |
|
|
|
|
BLD-Blower Door Test Results | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####,,, 3.36
|
BLD-Final | 7/8/2014 | 7/8/2014 | 7/8/2014 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Final | 7/7/2014 | 7/8/2014 | 7/8/2014 | A | PEND |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
PubWorks Occupancy Approval | 7/8/2014 | 7/8/2014 | 7/8/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | NR |
Dave Hannah
|
|
|
call 1/2 hr ahead to meet // Jeremy Phone #: ###-#### needs hill side sign off
|
BLD-Other | 4/3/2014 | 4/4/2014 | 4/4/2014 | P | PASS |
Tony Young
|
|
|
rich Phone #: ###-####,, soffits
|
BLD-Energy code compliance | 4/3/2014 | 4/4/2014 | 4/4/2014 | A | PASS |
Tony Young
|
|
|
rich Phone #: ###-####
|
BLD-Framing/Rough-in | 4/3/2014 | 4/3/2014 | 4/3/2014 | P | PASS |
Tony Young
|
|
|
rich Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2014 | 4/3/2014 | 4/3/2014 | A | PART |
Tony Young
|
|
|
rich Phone #: ###-####,, need to verify interior soffits.. verify overbuild rafter load to solid
|
BLD-Framing/Rough-in | 4/1/2014 | 4/2/2014 | 4/2/2014 | A | PART |
Tony Young
|
|
|
rich Phone #: ###-####,, corrections,, ok to insulate
|
BLD-Wall Bracing | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | PART |
Tony Young
|
|
|
Rich Phone #: ###-####,, exterior ok
|
BLD-Wall Bracing | 3/10/2014 | 3/11/2014 | 3/11/2014 | A | PART |
Tony Young
|
|
|
Rich Phone #: ###-####,, exterior walls ok to cover,, mostly nailed off
|
BLD-Foundation | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Tony Young
|
|
|
ben Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 1/16/2014 | 1/16/2014 | 1/16/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 12/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 12/11/2013 | | |
|
|
|
|
Plan assigned to (JG) | 11/12/2013 | 11/12/2013 | 12/11/2013 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 11/29 L2
|
Routing - PLAN CHECK | 11/27/2013 | | 12/11/2013 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 12/11/2013 | | DONE |
Javier Guzman
|
|
|
11/29 received call from Dave Powell regarding egress windows and as per Dave Powell all egress windows will be single hung, I told him about the conditioned storage room in garage needing slab and wall insulation, and I also told him the eaves needing to be rated because of new home being built in the hillside.
|
Case Summary (BLD) | | | 12/11/2013 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2013 | | DONE |
|
|
|
|
Telephone call | | | 12/11/2013 | | DONE |
Christina Prado
|
|
|
called Robert to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 12/11/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 12/10/2013 | | DONE |
Christina Prado
|
|
|
Received two revised set of plans marked S1.1; Taken to Javier for further review
|
Routing - PLAN CHECK | 11/25/2013 | | 11/27/2013 | | FAIL |
Javier Guzman
|
|
|
11/27 emailed applicant report
|
1st review completed | | | 11/27/2013 | | DONE |
Javier Guzman
|
|
|
|
Routing - FIRE | 11/22/2013 | | 11/25/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 11/21/2013 | | 11/22/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. PD and RP are certified.
|
Routing - MECHANICAL | 11/15/2013 | | 11/21/2013 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/13/2013 | 11/16/2013 | 11/15/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 11/12/2013 | 11/15/2013 | 11/15/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 11/15/2013 | | 11/15/2013 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2013 | | 11/15/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 11/13/2013 | | 11/14/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Addressing | 11/13/2013 | | 11/14/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 11/12/2013 | 11/13/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 11/12/2013 | | PASS |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/12/2013 | | DONE |
Tisha Gallop
|
|
|
|