Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-03162
StatusIssued
Name ROCKY MOUNTAIN POOLS
Site Address 225 W SUMMIT RIDGE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit is for the construction of a new 20’x40’ in ground pool, prior to placement of concrete an inspection is required to verify equipotential bond of structural reinforcing steel, construction of pool to comply with approved plans, engineering and local codes, Electrical permit required, Subgrade inspection by a geotechnical engineer will be required prior to placement of concrete elements. After report is recieved by Public Works the building department may be scheduled for inspections. Jason Taylor 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing4/21/20144/22/20144/22/2014PPASS
DetailsTony Young
Ryan Phone #: ###-####,, pool rebar ok
PubWorks Subgrade Approval4/16/20144/16/20144/16/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  11/13/2013  
Routing Walk-In (BLD)11/12/201311/13/201311/13/2013APASS
DetailsJavier Guzman
1st review completed  11/13/2013 DONE
DetailsJavier Guzman
Case Summary (BLD)  11/13/2013 DONE
DetailsJavier Guzman
Inspection Record Card- Bld  11/13/2013 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/13/2013 DONE
Permit Ready to Issue  11/13/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  11/13/2013 DONE
DetailsChristina Prado
Routing Walk-In (PW Hillside)11/12/201311/12/201311/12/2013APASS
DetailsJason C. Taylor
Subgrade inspection by a geotechnical engineer will be required prior to placement of concrete elements. After report is recieved by Public Works the building department may be scheduled for inspections. Jason Taylor ###-####.
Routing Walk-In (Zoning)11/12/201311/12/201311/12/2013ADONE
DetailsLeon Letson
Routing - Erosion and Sediment11/12/2013 11/12/2013 PASS
DetailsAndy J. Long
Application received 11/12/2013