Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-03168
StatusFinaled
Name BRIGHTON HOMES IDAHO INC
Site Address 4270 S RIVER FALLS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2,880 sq. ft., two story (first story 2,390 sq. ft., second story 490 sq. ft.) single family dwelling with 4 bedrooms, 2 full bathrooms and 2 half bathrooms, approximately 198 sq. ft. of covered patio/porch and a 840 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-02 zoning and setbacks per planning. JG If retaining walls are to exceed 4ft in height, engineering will be required. Jason Taylor 384-3946. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/21/20145/21/20145/21/2014PPASS
DetailsDave Hannah
Garage code is 5424 Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
DOC - Permit Finaled5/21/20145/21/20145/21/2014PPASS
DetailsDave Hannah
BLD-Wall cover3/14/20143/17/20143/17/2014APASS
DetailsDave Hannah
Insulation inspection so we can drywall. Thank you. Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
BLD-Other3/14/20143/14/20143/14/2014PPASS
DetailsTom Arcoraci
Need inspection to whiteness sheet rocked soffits so we can finish siding. Thank you. Phone #: ###-#### >> Inspection requested via web by Joshua Edwards per plan
BLD-Framing/Rough-in3/11/20143/13/20143/13/2014APART
DetailsJim Storey
Looking for framing inspection so we can insulate. Thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards c/n posted need gyp on soffit.
BLD-Wall Bracing2/27/20143/3/20143/3/2014APASS
DetailsDave Hannah
Looking to get sheer inspection please. Please call with any questions. Thx Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
BLD-Wall Bracing2/27/20142/28/20142/28/2014APART
DetailsJim Storey
Looking for sheer inspection. Please call with any questions. Thank you. Phone #: ###-#### >> Inspection requested via web by Joshua Edwards all but garage ok to cover.
BLD-Foundation2/11/20142/12/20142/12/2014APASS
DetailsDave Hannah
Doug Phone #: ###-####
BLD-Footing2/5/20142/6/20142/7/2014PPASS
DetailsDave Hannah
Brian Phone #: ###-####
Issue PAID IN FULL permit  12/24/2013 DONE
OVERRIDE  11/26/2013  
Plan assigned to (JG)11/12/201311/12/201311/26/2013 PASS
DetailsTisha Gallop
1st Review completed, Due 11/25 L1
Routing - PLAN CHECK11/21/2013 11/26/2013 PASS
DetailsJavier Guzman
Telephone call  11/26/2013 DONE
DetailsTisha Gallop
called Seth and told him permit is ready and fee due.
Case Summary (BLD)  11/26/2013 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/26/2013 DONE
Inspection Record Card- Bld  11/26/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  11/26/2013 DONE
DetailsTisha Gallop
Routing - PLANNING11/25/2013 11/25/2013 PASS
DetailsLeon Letson
Resubmittal OK - No change to previous approval.
Plan resubmittals received  11/22/2013 DONE
DetailsChristina Prado
received two revised plan sheets marked A1.1A, A2.1, A3.1, A4.1, A5.1, A6.1, A6.2, A6.3 & A7.1;Plans taken to Javier for further review
1st review completed  11/21/2013 DONE
DetailsJavier Guzman
Routing - PLAN CHECK11/20/2013 11/21/2013 FAIL
DetailsJavier Guzman
Emailed applicant review report
Routing - MECHANICAL  11/20/2013 PASS
DetailsTroy James
Route to Impact Fee Review11/13/201311/16/201311/15/2013 PASS
DetailsCindy M. Gould
Route to Impact Fee Review11/12/201311/15/201311/15/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING11/15/2013 11/15/2013 PASS
DetailsLeon Letson
Routing - PUBLIC WORKS11/13/2013 11/15/2013 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside11/14/2013 11/14/2013 PASS
DetailsJason C. Taylor
If retaining walls are to exceed 4ft in height, engineering will be required. Jason Taylor ###-####.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Routing - Addressing11/13/2013 11/14/2013 PASS
DetailsJason C. Taylor
Application received 11/12/201311/13/2013 DONE
Plans ACCEPTED BY PLAN TECH  11/12/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/12/2013 DONE
DetailsTisha Gallop
Intake Approval  11/12/2013 PASS
DetailsTisha Gallop