Zoning Approval | 3/16/2015 | 3/16/2015 | 3/16/2015 | | PASS |
Josh Wilson
|
|
|
Landscaping, bike rack, and striping completed and bond ok for release.
|
Print Statement | | | 3/5/2015 | | DONE |
Candy A. Nichols
|
|
|
received 1st notice with cert of val from submittal attached-sent statement to GC
|
Second Notice | | 2/12/2015 | 3/3/2015 | | DONE |
Christina Prado
|
|
|
mailed 3-4-15
|
First Notice | | 1/26/2015 | 2/2/2015 | | DONE |
Christina Prado
|
|
|
mailed 2-3-15
|
PubWorks Occupancy Approval | 1/14/2015 | 1/14/2015 | 1/14/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 1/14/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 1/13/2015 | 1/14/2015 | 1/13/2015 | A | PASS |
Phil Shearer
|
|
|
Richard Phone #: ###-####
|
FIRE-Final Inspection | 1/13/2015 | 1/14/2015 | 1/13/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Print Occupancy Form | | | 1/13/2015 | | DONE |
|
|
|
|
BLD-Final | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | CANC |
Phil Shearer
|
|
|
Please return after all signatures are logged into system to review for final inspection and C of O Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
FIRE-Final Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need to provide fire dept approval on tanks, scott has approved existing fire dept access without utilizing the east side driveway, and the two emergency stop buttons along Orchard Street do not work.
|
Zoning Approval Temp | 1/12/2015 | 1/12/2015 | 1/12/2015 | | DONE |
Andrea Tuning
|
|
|
Bond has been provided for striping, bike rack and remainder of landscaping.
|
BLD-Final | 1/7/2015 | 1/9/2015 | 1/9/2015 | P | CANC |
Phil Shearer
|
|
|
Please come after 3 pm for final inspection. Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
FIRE-Final Inspection | 1/7/2015 | 1/9/2015 | 1/9/2015 | A | FAIL |
Troy Cobbley
|
|
|
See posted correction notice that includes: Provide fire dept sign off, remove thumbturn on main exit and provide sticker, remove deadbolt from beer cooler door, provide all small documents including fire dept review comments, repair and finish installing exit discharge lighting, test duct smoke detectors, provide signage for emergency stop and at gas pumps, test emergency stop...ect.
|
BLD-Final | 1/8/2015 | 1/9/2015 | 1/9/2015 | A | CANC |
Phil Shearer
|
|
|
Richard Phone #: ###-####
|
BLD-Final | 1/7/2015 | 1/7/2015 | 1/7/2015 | P | CANC |
Phil Shearer
|
|
|
Please come around 3pm for the final walkthru Phone #: ###-#### >> Inspection requested via web by Richard Fontaine Inspection cancelled from web by: Richard Fontaine
|
FIRE-Conference | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | DONE |
Troy Cobbley
|
|
|
Discussed address placement
|
BLD-Wall cover | 11/24/2014 | 11/24/2014 | 11/24/2014 | P | PASS |
Phil Shearer
|
|
|
Please inspect wall cover later in the afternoon. Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Energy code compliance | 11/20/2014 | 11/21/2014 | 11/21/2014 | A | PASS |
Phil Shearer
|
|
|
Please come early AM to inspect interior insulation prior to Sheetrock Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Framing/Rough-in | 11/21/2014 | 11/21/2014 | 11/21/2014 | P | PASS |
Phil Shearer
|
|
|
Please come early AM to inspect interior insulation prior to Sheetrock Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Framing/Rough-in | 11/18/2014 | 11/19/2014 | 11/19/2014 | P | PART |
Phil Shearer
|
|
|
Please inspect towards the end of the day on Wednesday for approval to insulate. Phone #: ###-#### Inspection requested via web by Richard Fontaine. ok except for front high wall has not passed electrical inspection
|
BLD-Framing/Rough-in | 11/12/2014 | 11/13/2014 | 11/13/2014 | P | PART |
Phil Shearer
|
|
|
Partial wall inspection prior to partial insulation behind beer cooler Phone #: ###-#### Inspection requested via web by Richard Fontaine.
|
BLD-Wall Bracing | 10/31/2014 | 11/3/2014 | 11/3/2014 | P | PASS |
Phil Shearer
|
|
|
Shear wall inspection sometime during the afternoon please. Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Energy code compliance | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Phil Shearer
|
|
|
Please inspect the foundation insulation around 3 pm Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Foundation | 9/25/2014 | 9/29/2014 | 9/29/2014 | A | PASS |
Phil Shearer
|
|
|
We are pouring the foundation stem walls at 10 am. Please inspect prior Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Footing | 9/22/2014 | 9/24/2014 | 9/24/2014 | A | PASS |
Phil Shearer
|
|
|
We are pouring building footings at 10 a.m. Please inspect prior to this. Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
BLD-Footing | 9/17/2014 | 9/18/2014 | 9/18/2014 | A | PASS |
Phil Shearer
|
|
|
Canopy column footings and overview of work to be performed. (Conference) Phone #: ###-#### Inspection requested via web by Richard Fontaine
|
Issue PAID IN FULL permit | | | 8/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 8/18/2014 | | |
|
|
|
|
Extend Review Timeline | | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
180day extension granted from 5/12/14
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 7/31/2014 | | 8/11/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 7/31/2014 | | 8/11/2014 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2014 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 4/29/2014 | | 8/11/2014 | | PASS |
Carl D Madsen
|
|
|
First review completed - Maverik
|
Routing - Design Review | 7/28/2014 | | 7/28/2014 | | FAIL |
Andrea Tuning
|
|
|
The applicant has modified the elevations from what was approved by the DR approval DRH13-00291. These modifications have not been reviewed or approved at this time.
|
Routing - Design Review | 7/24/2014 | | 7/24/2014 | | PASS |
Andrea Tuning
|
|
|
The applicant has modified the elevations from what was approved by the DR approval DRH13-00291. These modifications have not been reviewed or approved at this time.
|
Routing - PLAN CHECK | 7/16/2014 | | 7/16/2014 | | FAIL |
Carl D Madsen
|
|
|
Pending NFPA 701 test on decorative vegitation.
|
Routing - FIRE | 7/9/2014 | 7/9/2014 | 7/10/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-10-14
|
Routing - Design Review | 7/1/2014 | | 7/1/2014 | | FAIL |
Andrea Tuning
|
|
|
The applicant has modified the elevations from what was approved by the DR approval DRH13-00291. These modifications have not been reviewed or approved at this time.
|
Routing - PLANNING Land Div | 7/1/2014 | | 7/1/2014 | | PASS |
Todd Tucker
|
|
|
ROS14-00031 has been recorded.
|
Routing - Erosion and Sediment | 7/1/2014 | | 7/1/2014 | | PASS |
Evan Jenkins
|
|
|
2nd Submittle with SWPPP and Site Maps Approved
|
Routing Off Site - STRUCTURAL | 4/29/2014 | | 5/30/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/29/2014 | | 5/30/2014 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 5/30/2014 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/29/2014 | 5/2/2014 | 5/9/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 4/29/2014 | | 5/9/2014 | | PASS |
Daryl Spivey
|
|
|
see redlines on plans
no vent connections below grade, cross connection protection required
|
Routing PW Drainage | 4/29/2014 | | 5/8/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 4/29/2014 | 4/29/2014 | 5/6/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 05-06-14
|
Routing PW Solid Waste | 4/29/2014 | | 5/5/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 4/29/2014 | | 5/1/2014 | | PASS |
Walt Baumgartner
|
|
|
1500 gallon grease incpt noted, ok
|
Routing PW Street Lights | 4/29/2014 | | 4/30/2014 | | PASS |
Mike D Hedge
|
|
|
No newl street lighting required for this project
|
Routing PW Sewer Rating | 4/29/2014 | | 4/30/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/29/2014 | | 4/30/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/29/2014 | | 4/29/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING Land Div | 4/29/2014 | | 4/29/2014 | | FAIL |
Dave Abo
|
|
|
Consolidate three parcels into one with parcel consolidation Record of Survey.
|
Routing - Design Review | 4/29/2014 | | 4/29/2014 | | FAIL |
Andrea Tuning
|
|
|
|
Intake Approval | | | 4/29/2014 | | PASS |
Jason Blais
|
|
|
|
Application received | | | 11/13/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2013 12:08PM
|
Pending Assignment by JCM | 4/29/2014 | | | | |
John Menard
|
|
|
|