Permanent Occupancy | | | 3/25/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/16/2015 | | DONE |
|
|
|
|
Third Notice | | 1/7/2015 | 1/30/2015 | | DONE |
|
|
|
|
Print Statement | | | 1/30/2015 | | DONE |
|
|
|
|
Third Notice | | 12/6/2014 | 1/2/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/26/2014 | | DONE |
|
|
|
Called CMD- left voicemail that we need an updated address because we were trying to send final value and it was returned
|
Third Notice | | 11/8/2014 | 12/1/2014 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2014 | | DONE |
|
|
|
called CMD to update address-left voicemail
|
Second Notice | | 10/16/2014 | 11/3/2014 | | DONE |
|
|
|
|
First Notice | 10/1/2014 | 10/1/2014 | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 10-6-14
|
BLD-Final | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Phil Shearer
|
|
|
Meilana Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 9/29/2014 | 9/30/2014 | 9/30/2014 | P | FAIL |
Phil Shearer
|
|
|
Meilani Phone #: ###-####. Need vert grab bar.
|
BLD-Final | 9/26/2014 | 9/29/2014 | 9/29/2014 | P | NR |
Phil Shearer
|
|
|
meilani sibetang Phone #: ###-####
|
FIRE-Final Inspection | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
BLD-Final | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | NR |
Phil Shearer
|
|
|
May Phone #: ###-####
|
BLD-Final | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | NR |
Tom Arcoraci
|
|
|
clayne Phone #: ###-####
|
FIRE-Final Inspection | 5/1/2014 | 5/1/2014 | 5/1/2014 | A | NR |
Forrest France
|
|
|
|
FIRE-Conference | 4/22/2014 | 4/22/2014 | 4/22/2014 | P | DONE |
Forrest France
|
|
|
Final pending project related fire alarm permit inspection and final- Related fire sprinkler permit finaled 4/21.
|
BLD-Framing/Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | PASS |
Tom Arcoraci
|
|
|
clayne Phone #: ###-#### per plan
|
BLD-Framing/Rough-in | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | NR |
Tom Arcoraci
|
|
|
Exterior welding inspection also please-Clane Phone #: ###-#### spec insp required
|
Override - Parcel Holds | 3/18/2014 | 1/1/1900 | 3/18/2014 | | |
|
|
|
plumbing & framing insepction
|
BLD-Wall cover | 3/13/2014 | 3/13/2014 | 3/13/2014 | P | PART |
Tom Arcoraci
|
|
|
ok to cover awning area
|
OVERRIDE | | | 3/13/2014 | | |
|
|
|
|
Override - Parcel Holds | | | 3/13/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
|
Routing Off Site - C.D.H | 2/20/2014 | | 3/13/2014 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/2014 | | |
Tim L. Woodard
|
|
|
|
Telephone call | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
Spoke to Clayne with CMD to verify values as well as inform of RP requirements.
|
Override - Parcel Holds | | | 3/13/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 3/13/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 1/21/2014 | | 3/13/2014 | | PASS |
Tim L. Woodard
|
|
|
La Quinta Inn
|
BLD-Conference | 3/7/2014 | 3/7/2014 | 3/7/2014 | P | CANC |
Tom Arcoraci
|
|
|
|
Routing Off Site - STRUCTURAL | 2/20/2014 | | 2/27/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/20/2014 | | 2/24/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved With Redlines and attached details. TLW
|
Routing - Erosion and Sediment | 2/24/2014 | | 2/24/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted as requested. TI project qualifies for waiver due to scope of project.
|
Routing - Erosion and Sediment | 2/20/2014 | | 2/20/2014 | | FAIL |
Andy J. Long
|
|
|
Level 3 Commercial TI. No ESC plan or ESC plan waiver submitted.
|
1st review completed | | | 2/7/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/21/2014 | | 2/7/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 1/21/2014 | | 2/7/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 1/21/2014 | | 2/7/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - C.D.H | 1/21/2014 | | 2/7/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 1/21/2014 | | 1/31/2014 | | PASS |
Brian Murphy
|
|
|
LESS THAN 1000 FT2
|
Routing - FIRE | 1/21/2014 | | 1/27/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Report 01-27-14
|
Routing - PLUMBING | 1/21/2014 | | 1/24/2014 | | PASS |
Daryl Spivey
|
|
|
Vent as noted and install per ISPC.
|
Routing - Addressing | 1/21/2014 | | 1/21/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 1/21/2014 | | 1/21/2014 | | PASS |
Josh Wilson
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 1/21/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 1/21/2014 | | 1/21/2014 | | FAIL |
Evan Jenkins
|
|
|
No Waiver Request Letter Submitted:
Waiver Request Letter Required for Review and Approval
|
Routing PW Sewer Rating | 1/21/2014 | | 1/21/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 1/21/2014 | | 1/21/2014 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 1/21/2014 | | 1/21/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 1/17/2014 | | PASS |
Carl Westfall
|
|
|
CJW had approved the intake on the 16th; however, the fees to progress the workflow were not paid until the 17th. I revised this activity accordingly. TLW
|
Intake Approval | | | 12/30/2013 | | FAIL |
|
|
|
Several items on the plan intake checklist need to be resolved. Please review the circled items and provide the requested resolution.
|
Intake Approval | | | 11/15/2013 | | FAIL |
|
|
|
Checklist was no completed
|
Application received | | 11/15/2013 | | | |
|
|
|
|