BLD-Final | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Tom Arcoraci
|
|
|
David ###-####
|
DOC - Permit Finaled | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PART |
Tom Arcoraci
|
|
|
David--PLease call prior to insepction Phone #: ###-#### ok for final after elec final
|
DOC - Permit Finaled | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | CANC |
Tom Arcoraci
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Conference | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | DONE |
Jim Sly
|
|
|
|
BLD-Conference | 1/13/2014 | 1/13/2014 | 1/14/2014 | P | CANC |
Jim Sly
|
|
|
call before // David Phone #: ###-#### Re-sched......
|
BLD-Energy code compliance | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 12/26/2013 | 12/26/2013 | 12/26/2013 | P | DONE |
Tom Arcoraci
|
|
|
Please call ahead for access - David Phone #: ###-####
|
BLD-Framing/Rough-in | 12/26/2013 | 12/26/2013 | 12/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Please call ahead for access - David Phone #: ###-#### ok after elec rough in stairs tread will have nosing before final
|
BLD-Conference | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Tom Arcoraci
|
|
|
Please call 30min ahead for access - David Phone #: ###-#### wip ok
|
BLD-Conference | 12/6/2013 | 12/6/2013 | 12/6/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/29/2013 | 11/29/2013 | 11/29/2013 | P | PART |
Tom Arcoraci
|
|
|
david please call 30 min before going out Phone #: ###-#### under floor ok
|
BLD-Footing | 11/21/2013 | 11/25/2013 | 11/25/2013 | A | PASS |
Tom Arcoraci
|
|
|
David-Please call at least 30 mins prior to inspection Phone #: ###-####
|
Routing Walk-In (BLD) | 11/19/2013 | 11/19/2013 | 11/19/2013 | A | DONE |
Perry Paine
|
|
|
|
Application received | | 11/18/2013 | 11/19/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2013 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2013 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (Zoning) | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | DONE |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | FAIL |
Perry Paine
|
|
|
need engineering
|
Plan assigned to (PEP) | 11/18/2013 | 11/18/2013 | 11/18/2013 | | FAIL |
Perry Paine
|
|
|
|
1st review completed | | | 11/18/2013 | | FAIL |
|
|
|
need engineering
|