BLD-Final | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Jim Sly
|
|
|
Dan ###-####
|
DOC - Permit Finaled | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 4/8/2014 | 4/9/2014 | 4/9/2014 | A | NR |
Jim Sly
|
|
|
Dan Phone #: ###-#### Need Zoning final.
|
Zoning Approval | 4/9/2014 | 4/9/2014 | 4/9/2014 | | DONE |
Matthew A Halitsky
|
|
|
|
Telephone call | | | 4/2/2014 | | DONE |
|
|
|
Spoke with Dan who indicated that the two beams spanning between the two structures ar 6 x12 Timber. These are redlined on the office set alon with a photograph and need tobe verified in the feild for size. CDM
|
Zoning Approval | 3/31/2014 | 3/31/2014 | 3/31/2014 | | FAIL |
Matthew A Halitsky
|
|
|
Drive not paved, shed in required back-up space. Attached structures do not meet rear setback. Variance required.
|
BLD-Final | 3/27/2014 | 3/28/2014 | 3/28/2014 | P | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, needs historical and stair tread
|
BLD-Energy code compliance | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Jim Storey
|
|
|
dan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/14/2014 | 1/15/2014 | 1/15/2014 | P | PASS |
Tony Young
|
|
|
DAN IF POSSIBLE 1ST THING AFTER LUNCH Phone #: ###-####
|
BLD-Wall Bracing | 12/18/2013 | 12/19/2013 | 12/19/2013 | A | PASS |
Tony Young
|
|
|
dan Phone #: ###-####
|
BLD-Foundation | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | PART |
Tony Young
|
|
|
Jerry Phone #: ###-####
|
BLD-Footing | 11/27/2013 | 11/27/2013 | 11/27/2013 | P | PART |
Tony Young
|
|
|
rear porch, garage and storage ftgs ok
|
OVERRIDE | | | 11/25/2013 | | |
|
|
|
|
Plan assigned to (PEP) | 11/18/2013 | 11/18/2013 | 11/25/2013 | | PASS |
Perry Paine
|
|
|
ADU
|
Routing - PLAN CHECK | 11/22/2013 | | 11/25/2013 | | PASS |
Perry Paine
|
|
|
Perry Paine
|
1st review completed | | | 11/25/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2013 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/25/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 11/25/2013 | | DONE |
Christina Prado
|
|
|
called Dan to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 11/25/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 11/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 11/20/2013 | | 11/22/2013 | | PASS |
Matthew A Halitsky
|
|
|
DRH13-00247 Matt
|
Routing - PLANNING | 11/20/2013 | | 11/20/2013 | | PASS |
Susan Riggs
|
|
|
|
Route to Impact Fee Review | 11/18/2013 | 11/21/2013 | 11/19/2013 | | PASS |
Cindy M. Gould
|
|
|
Accessory Dwelling Unit
|
Routing - Addressing | 11/18/2013 | | 11/19/2013 | | PASS |
Jason C. Taylor
|
|
|
ADU was assigned a new address (1953 W Heron St). Prior to occupancy a sign must be placed in the alley at the intersection with Heron St with the ADU address. Sign must meet the Boise City Code requirements.
|
Routing - PUBLIC WORKS | 11/18/2013 | | 11/19/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 11/18/2013 | 11/18/2013 | | DONE |
|
|
|
|