Permit Information
Permit NumberBLD13-03238
StatusFinaled
Name TRIPLE G CONSTRUCTION
Site Address 1750 W FRONT ST Unit: 200
Project NameJitasa Tenant Improvement
Customer Number 
ePlanReviewYes
Description
(JITASA)(Suite 200)(Grove Park) This building is fire sprinklered for area increase and for non-rated corridors. Minor tenant improvement for the second floor suite of the Grove Park Building. Scope of work to include the addition of (1) wall to bisect an existing office creating (2) separate offices with a new door; relocate of a door at the Break Room and remove and infill an existing door; removal of several partition walls at offices to create open office area as shown on approved plans. See reference sheet for existing approved floor plan. BLD12-01916 for Easy Office is the same tenat space for this permit, the name has changed, same tenant, use and occupancy. Interior finish shall be per chapter 8, IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/7/20142/5/2014 DONE
First Notice 12/26/20131/28/2014 DONE
Print Occupancy Form  12/16/2013 DONE
Permanent Occupancy  12/16/2013 DONE
BLD-Final12/12/201312/13/201312/13/2013PPASS
DetailsTom Arcoraci
call 15 min prior to meet // Rick Phone #: ###-####
Extend Permit 90/180 days12/13/201312/13/201312/13/2013PPASS
DetailsTom Arcoraci
call 15 min prior to meet // Rick Phone #: ###-####
FIRE-Final Inspection12/12/201312/13/201312/13/2013APASS
DetailsTroy Cobbley
Life safety passed
Print Occupancy Form  12/2/2013 DONE
Permit Ready to Issue  12/2/2013  
Issue PAID IN FULL permit  12/2/2013 DONE
Plan assigned to (AJS)11/20/201311/20/201311/29/2013 PASS
DetailsAdele J Schaffeld-Griffin
Level II TI Grove Park Buildng Due 12/3
Routing - PLAN CHECK11/20/2013 11/29/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  11/29/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/29/2013 DONE
Intake Approval  11/20/2013 PASS
DetailsAdele J Schaffeld-Griffin
Application received  11/18/2013 DONE
Application submitted via PDS Online on Nov 18 2013 3:04PM