Second Notice | | 5/16/2014 | 6/24/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | 4/18/2014 | 4/18/2014 | 5/6/2014 | | DONE |
Jim Sly
|
|
|
faxedb 5-6-14
|
BLD-Final | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | PASS |
Jim Sly
|
|
|
Requesting final inspection for new landing. Thank you- Phone #: ###-#### >> Inspection requested via web by Kevin Chandler
|
DOC - Permit Finaled | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 4/10/2014 | 4/10/2014 | 4/10/2014 | P | PASS |
Jim Sly
|
|
|
This is a request to inspect the replacement metal decking at the exterior stair landing, prior to us repouring a new concrete landing. If you could please inspect as early as possible this afternoon, I would sure appreciate it very much. The metal decking will actually be ready to inspect by 11am and we are hoping to pour concrete early this afternoon. If you could please text me when this inspection is passed at 208.353.4655 I would really appreciate it! Thank you! -Kevin Phone #: ###-#### >> Inspection requested via web by Kevin Chandler
|
Place hold on job | 3/12/2014 | | 4/7/2014 | | DONE |
Tisha Gallop
|
|
|
need copy of signed building permit; see Tisha
|
Issue PAID IN FULL permit | | | 3/4/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 2/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 11/27/2013 | 11/27/2013 | 12/4/2013 | | PASS |
Carl D Madsen
|
|
|
stair repair
|
Routing - PLAN CHECK | 11/27/2013 | | 12/4/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/4/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2013 | | DONE |
|
|
|
|
Intake Approval | | | 11/27/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 11/20/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please submitt the 304 design professional document
All sheets must be stamped by the design professional, only the cover sheet was stamped.
Please provide a complete connection detail where the stairs will be connected to the existing landing. The detail should include the the type and length of bolt/screw, spacing ect.
Each drawing sheet needs to be up loaded individually with conventional naming. See link below for standards.
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Thank you
|
Application received | | | 11/19/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 19 2013 3:24PM
|