Second Notice | | 5/16/2014 | 6/24/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | 4/17/2014 | 4/17/2014 | 5/6/2014 | | DONE |
Jim Sly
|
|
|
faxed 5-6-14
|
BLD-Final | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PASS |
Jim Sly
|
|
|
Jim can you please call me to meet you there to final out these replacement stairways? thank you! Phone #: ###-#### >> Inspection requested via web by Kevin Chandler
|
DOC - Permit Finaled | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 4/7/2014 | 4/8/2014 | 4/8/2014 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Chandler
|
BLD-Footing | 4/7/2014 | 4/8/2014 | 4/7/2014 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Chandler Inspection cancelled from web by: Kevin Chandler
|
Place hold on job | 3/12/2014 | | 4/7/2014 | | DONE |
Tisha Gallop
|
|
|
need copy of signed building permit; see Tisha
|
Issue PAID IN FULL permit | | | 3/4/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 2/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 12/2/2013 | 12/2/2013 | 2/26/2014 | | PASS |
Carl D Madsen
|
|
|
replacement of stairs
First review completed
|
Routing - PLAN CHECK | 2/26/2014 | | 2/26/2014 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/2/2013 | | 12/4/2013 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/4/2013 | | FAIL |
|
|
|
|
Intake Approval | | | 12/2/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 11/20/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please submitt the 304 design professional document
All sheets must be stamped by the design professional, only the cover sheet was stamped.
Please provide a complete connection detail where the stairs will be connected to the existing landing. The detail should include the the type and length of bolt/screw, spacing ect.
Each drawing sheet needs to be up loaded individually with conventional naming. See link below for standards.
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Thank you
|
Application received | | | 11/19/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 19 2013 3:35PM
|