Permit Information
Permit NumberBLD13-03253
StatusFinaled
Name INTERSTATE TRUCK & EQUIPMENT COMPAN
Site Address 7132 W TARGEE ST
Project NameGillingham Bldg #2
Customer Number 
ePlanReviewNo
Description
(R&R TRUCK SERVICE) (GILLINGHAM BUILDING#2) Permit to construct a new 12,096 square foot non separated use, VB building and associated site work. The office portion of the structure is 1,104 square feet and service/repair area is 10,992 square feet. This building service repair area consists of 4 separate areas. The areas are separated by combustible, bearing and nonbearing walls. The office area consists of 2 offices, reception area, 2 ADA compliant restrooms and a break room. This building is fully fire sprinklered. Concrete work is to include concrete footings, concrete foundations, and concrete slabs on grade. According to the Geotechnical Investigation, this site has undocumented fill that may extend up to 45 feet below the footings of the new building. The existing material below where the spread footings will be located is required to be removed to a depth of at least 2 feet below the bottom of the proposed spread footings and replaced with structural fill. This work and all other site work is required to comply with the approved Geotechnical Investigation report and letter prepared by the Geotechnical Engineer. Special Inspections include concrete and soils. Inspections by the Geotechnical Engineer are also required.**ajs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/6/201412/19/2014 DONE
DetailsChristina Prado
Second Notice 11/13/201412/1/2014 DONE
DetailsChristina Prado
First Notice 10/13/201411/3/2014 DONE
BLD-Final10/3/201410/3/201410/3/2014PPASS
DetailsJim Sly
larry Phone #: ###-####
OK for Perm. Occ.
Permanent Occupancy  10/3/2014 DONE
DetailsChristina Prado
Zoning Approval10/2/201410/2/201410/2/2014 DONE
DetailsAndrea Tuning
Hall Simmons has approved the site without landscaping and did not require a bond.
BLD-Final9/30/20149/30/20149/30/2014PNR
DetailsJim Sly
as soon as possible // Larry Phone #: ###-####
Need ACHD, Zoning, Public Works, Fire Alarm, Fire Sprinkler, ...... finals prior to Structural Final. - ok for temp
FIRE-Final Inspection9/29/20149/30/20149/30/2014APART
DetailsTroy Cobbley
A temporary occupancy is being given with Scott's permission for ten working days. Need riser room to be certified one hour, provide knox key box and provide single action hardware on all interior doors.
FIRE-Final Inspection9/26/20149/29/20149/29/2014ACANC
DetailsTroy Cobbley
Rescheduled for tomorrow morning per Larry Phone #: ###-####
BLD-Final9/26/20149/29/20149/29/2014PNR
DetailsPhil Shearer
Larry Phone #: ###-####
BLD-Final9/26/20149/26/20149/26/2014PNR
DetailsPhil Shearer
larry Phone #: ###-####
FIRE-Final Inspection9/26/20149/26/20149/26/2014PFAIL
DetailsTroy Cobbley
Provide single action hardware for the interior doors, provide one hour rated fire riser room, provide knox box and placement by the boise city fire dept., provide final inspections for the project related fire sprinkler and fire alarm permits.
PubWorks Occupancy Approval9/25/20149/25/20149/25/2014 DONE
DetailsJason C. Taylor
BLD-Final9/23/20149/24/20149/24/2014ANR
DetailsPhil Shearer
Larry Phone #: ###-####
BLD-Final9/19/20149/22/20149/22/2014ANR
DetailsMike Jordan
Larry-please call 30 minutes prior Phone #: ###-####. Needs fire/life/safety and fire alarm and fire sprinkler finals.
BLD-Energy code compliance6/25/20146/26/20146/26/2014PPASS
DetailsTom Arcoraci
jeff Phone #: ###-####
BLD-Framing/Rough-in6/20/20146/23/20146/23/2014PPASS
DetailsTom Arcoraci
Jeff Phone #: ###-####
BLD-Wall Bracing5/19/20145/20/20145/20/2014APASS
DetailsTom Arcoraci
Jeff Phone #: ###-####
BLD-Concrete5/12/20145/13/20145/13/2014APASS
DetailsTom Arcoraci
Jeff Phone #: ###-#### roof ok
BLD-Foundation3/19/20143/20/20143/20/2014APASS
DetailsTom Arcoraci
concrete foundation/pouring at 2:30 - jeff Phone #: ###-####
BLD-Footing3/17/20143/18/20143/18/2014APART
DetailsTom Arcoraci
request 11am, wants to pour at 11:30 // Jeff Phone #: ###-#### pending spec insp by strata
Issue PAID IN FULL permit  3/14/2014 DONE
DetailsChristina Prado
OVERRIDE  3/3/2014  
Telephone call  3/3/2014 DONE
DetailsBarbara Stitt
Called and talked to Rick and told him that permit is ready & fees due without ACHD and what the the ACHD fees were and that they can pay here or there. Also told him that we need GC info and RP info///3-3-14 @ 4:25pm///BAS
Case Summary (BLD)  3/3/2014 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/3/2014 DONE
Print Occupancy Form  3/3/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  3/3/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK2/21/2014 3/3/2014 PASS
DetailsAdele J Schaffeld-Griffin
Plan assigned to (AJS)11/20/2013 3/3/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed (GILLINGHAM #2) New Building Due my review 12/17 verify routed to Jim Wylie Building 1st review 1/1/14
Routing PW Drainage2/27/2014 2/27/2014 PASS
DetailsJim Wyllie
Routing - PUBLIC WORKS2/27/2014 2/27/2014 PASS
DetailsBeverly Mountain
Routing - PLANNING2/21/2014 2/21/2014 PASS
DetailsAndrea Tuning
Plan resubmittals received  2/20/2014 DONE
received two copies of Stormwater calcs and five copies of plan sheets C-1.1, C-2.1, C-2.2, C-3.1, C-4.1, C-4.2, C-5.1;
Plan resubmittals received  2/19/2014 DONE
DetailsAdele J Schaffeld-Griffin
recieved email from Lance Warnick that he submitted civil revisions on 2/18/14

From: Lance Warnick [mailto:lance@AspenEngineers.com]
Sent: Tuesday, February 18, 2014 4:36 PM
To: 'Jim Wyllie'
Cc: 'Brian Murphy'; Rick Bugatsch (rbugatsch@hbarchitecture.com)
Subject: RE: Gillingham # 2 Building - Revised Civil Plans and Reports

Jim,

As I described in my voicemail message, it is my understanding that Larry’s attorney is working to get the reservation for the future easement ready to address stormwater runoff from the east side of the driveway.

I am not sure when you will let us submit the plans, but I wanted to get these in your hands while waiting for the attorney. I can bring you hard copies whenever you are ready, but in the meantime, I posted PDF copies of the civil plans, drainage report and geotechnical report in my Dropbox at the following location:

https://www.dropbox.com/sh/koxp2flohrs5a5h/x6sLq4DDmv

As shown in the attached documents your comments were modified as described below:

1. The Geotechnical Investigation is outdated. Submit a new geotechnical investigation or have the geotechnical engineer approve the use of the document for your project.
An updated geotech report dated January 10, 2014 is provided that reiterates the project requirements.

2. The drainage swale is located too close to the lot line. The CC & R’s for the subdivision require that the swale be located 25 feet from interior lot lines. Please submit a copy of the recorded CC& R’s to document the setback requirement.
As shown on Sheets C3.1 and C4.2, the swale was moved to be a minimum of 25’ from the property line as requested.

3. The drainage plans (sheets C-4.1 and C-4.2) show drainage across the lot line adjacent to the driveway. This is not permitted.
As we discussed, it is my understanding that Larry’s attorney is working to get the reservation for the future easement ready to address stormwater runoff from the east side of the driveway.

4. Finish contours for sheets C-3.1, C-4.1 and C-4.2 are not labeled.
As shown on Sheets C3.1, C4.1 and C4.2, the finished 1’ contour lines are labeled as requested.

5. The Stormwater Management Calculations report does not list a percolation rate for the drainage swale or the time it takes for the swale to drain after a fifty year storm event. Please provide this information.
As shown in Section 5I on Page 7 of the revised Storm Calculations, the swale is expected to drain within 12 hours using the 1.5 in/hr infiltration rate reported on Page 14 of the geotechnical report. If only ½ of the swale surface drains, then the swale would drain in 1 day. If percolation was limited to only ¼ of the swale surface, then the swale would still drain in 2 days.

Please let me know what else you need and when I can get you hard copies of the plans and drainage report / storm calcs.

Thanks,

Lance Warnick, P.E.
Principal Engineer

Aspen Engineers
485 W. Main St, Suite B ? PO Box 205 ? Kuna, Idaho 83634
Phone ###-#### ? Cell ###-#### ? lance@AspenEngineers.com

From: Jim Wyllie [mailto:JWYLLIE@cityofboise.org]
Sent: Wednesday, November 27, 2013 8:19 AM
To: Warnick, Lance
Cc: Brian Murphy
Subject: Gillingham # 2 Building

Lance,

Review comments for the Gillingham #2 Building Grading and Drainage Plans are listed as follows:

1. The Geotechnical Investigation is outdated. Submit a new geotechnical investigation or have the geotechnical engineer approve the use of the document for your project.
2. The drainage swale is located too close to the lot line. The CC & R’s for the subdivision require that the swale be located 25 feet from interior lot lines. Please submit a copy of the recorded CC& R’s to document the setback requirement.
3. The drainage plans (sheets C-4.1 and C-4.2) show drainage across the lot line adjacent to the driveway. This is not permitted.
4. Finish contours for sheets C-3.1, C-4.1 and C-4.2 are not labeled
Routing - PLUMBING2/6/2014 2/6/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - FIRE2/4/2014 2/5/2014 PASS
DetailsCraig D. Hanson
Fire Plan Report attached
Routing - PLAN CHECK1/31/2014 2/4/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Building review is complete and approved pending fireplanning approval, fire approval and PW approval
Plan resubmittals received  1/31/2014 DONE
DetailsChristina Prado
received four sets of revised plan sheets marked P1.0 as well as one response letter; Taken to Adele for further review
Routing - PLANNING1/28/2014 1/31/2014 FAIL
DetailsAndrea Tuning
The applicant has not provided a recorded cross access agreement from the neighborhing property and has not paved all of the vehicular manuevering areas. To mee the requirement of DRH13-00109, the applicant hsould provide a recorded corss access agreement and pave the drive aisles located on the north and east sides of the building. Applicant contacted 1-31-14. JGW
Routing - PLUMBING1/27/2014 1/28/2014 FAIL
DetailsDaryl Spivey
1. Show shop drainage connection to sewer on civil plans.
2. 3 inch vent for flammable interceptor required to be vented seperately from sanitary vents.
Routing PW Solid Waste1/27/2014 1/27/2014 PASS
DetailsPeter J. McCullough
Routing Off Site - STRUCTURAL12/11/2013 1/27/2014 PASS
DetailsAdele J Schaffeld-Griffin
recieved letter of approval

gave revised report to Tisha to route- 1/16/14 send ammended geotech report
Routing - PUBLIC WORKS1/16/2014 1/21/2014 FAIL
DetailsConnie Baumgartner
Failed by Jim Wylie for drainage issues and Peter McCullough for trash issues.
Routing PW Drainage1/17/2014 1/21/2014 FAIL
DetailsJim Wyllie
Requested drainage revisions (email 11-27-13) not addressed. Jim Wyllie (###-####)
Routing PW Solid Waste1/21/2014 1/21/2014 FAIL
DetailsPeter J. McCullough
No changes; solid waste enclosure with proper dimensions not shown on site plan. ###-####
Telephone call  1/16/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up of resubs
Plan resubmittals received  1/16/2014 DONE
DetailsChristina Prado
Received four sets of revised plan sheets marked A1, SP1, A2, A3, A4, M1.0, P0.00, P1.0, P1.1, E0.00, E1.0, E2.0 & E3.2, as well as one structural response letter, one fire response letter and two sets of geotech packet;Taken to Adele for further review
Route to Impact Fee Review12/16/201312/19/201312/18/2013 PASS
DetailsCindy M. Gould
Routing - FIRE12/16/201312/16/201312/17/2013 FAIL
DetailsCraig D. Hanson
See Fire Plan Report
1st review completed  12/17/2013 FAIL
Failed, Fire, Plan Check, Plumbing, PW
Routing - PLAN CHECK12/5/2013 12/16/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see plan review letter in documents Adele
Telephone call  12/11/2013 DONE
DetailsAdele J Schaffeld-Griffin
spoke with Rick, the geo tech report when ammended to corrected the expired date also needs to be ammended to reflect the scope of the submitted project as it is different than the scoping specified and limited to in the report. Rick said he will speak with the owner about getting the ammended report 12/11/13 ajs
Routing Off Site - STRUCTURAL12/4/2013 12/9/2013 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING12/4/2013 12/5/2013 FAIL
DetailsAndrea Tuning
The applicant has not provided a recorded cross access agreement from the neighborhing property and has not paved all of the vehicular manuevering areas. To mee the requirement of DRH13-00109, the applicant hsould provide a recorded corss access agreement and pave the drive aisles located on the north and east sides of the building. Andrea
Routing - PLUMBING12/4/2013 12/4/2013 FAIL
DetailsBill VanDegrift
1. Show shop drainage to sanitary on civil plan.
2. RPBP required on non potable to shop and mark piping per ISPC.
3. Flammable liquids intercepter installed as required by Boise City.
Telephone call  12/4/2013 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - Erosion and Sediment12/3/2013 12/4/2013 PASS
DetailsAndy J. Long
ESC plan and SWPPP submitted and approved. Plan checklist retained by ESC division.
Plan Reviewer's activity  12/4/2013 DONE
DetailsAdele J Schaffeld-Griffin
Gave sheet A1, A2, A3 to Tisha to route to off site structural
Routing PW Street Lights12/3/2013 12/3/2013 PASS
DetailsMike D Hedge
No lights required.
Plan resubmittals received  12/3/2013 DONE
DetailsChristina Prado
Received one response letter and three sets of revised plan sheets marked A1, A2 & A3;Taken to Adele for further review
Routing - PUBLIC WORKS11/22/2013 12/3/2013 FAIL
DetailsConnie Baumgartner
Failed by Jim Wylie for drainage issues and Peter McCullough for trash issues.
Routing PW Sewer Rating12/3/2013 12/3/2013 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste12/3/2013 12/3/2013 FAIL
DetailsPeter J. McCullough
Solid waste enclosure with dimensions is not shown on the site plan.
Routing PW Environmental12/3/2013 12/3/2013 PASS
DetailsWalt Baumgartner
Plans indicated 1500 oil/water separator in service bay.
Routing PW Sewer Design11/27/2013 12/3/2013 PASS
DetailsKyle S. Rosenmeyer
Routing Off Site - STRUCTURAL11/20/2013 11/29/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Emailed comments to Rick, architect 11/29/13
Routing - Addressing11/21/2013 11/22/2013 PASS
DetailsJason C. Taylor
Application received 11/20/201311/20/2013 DONE
Intake Approval  11/20/2013 PASS
OK to submit for a permit
Plans ACCEPTED BY PLAN TECH  11/20/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/20/2013 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div11/20/2013 11/20/2013 PASS
DetailsDave Abo
Parcel A of Record of Survey 9558.
Telephone call  11/20/2013 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing PW Drainage11/26/2013   FAIL
DetailsJim Wyllie
Emailed Engineer list of corrections required.
Pending Assignment by JCM11/20/2013    
DetailsJohn Menard