BLD-Final | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Dave Hannah
|
|
|
Kyle Phone #: ###-####
|
FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Forrest France
|
|
|
Verified remainder of work is completed. Fire life safety final approved.
|
BLD-Final | 3/26/2014 | 3/27/2014 | 3/27/2014 | P | PART |
Dave Hannah
|
|
|
Kyle Phone #: ###-#### ok for temp occ ok for perm occ after fire gos perm
|
FIRE-Final Inspection | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PART |
Forrest France
|
|
|
Fire life safety final pending installation of a knox box per plan review notes. Remainder of corrections and adjustments completed. Temporary occupancy approved.
|
FIRE-Final Inspection | 3/26/2014 | 3/26/2014 | 3/26/2014 | A | NR |
Forrest France
|
|
|
Project related FIR trade work including the fire alarm and sprinkler permit finals pending, need to post signage at the main entry/exit, remove mag lock or provide relay to the fire alarm system at the east exit door, post signage at the courtyard exit door, missing knox box, post signage at the riser room door, noted some exit signs not functional on battery backup. Discussed project schedule for permit finals.
|
BLD-Final | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | NR |
Dave Hannah
|
|
|
Kyle Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 | P | PASS |
Jim Storey
|
|
|
Kyle Dunstan Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/6/2014 | 3/7/2014 | 3/7/2014 | A | FAIL |
Dave Hannah
|
|
|
Kyle Phone #: ###-#### new grid needs to be cliped or install spradder bars at perm.
|
BLD-Framing/Rough-in | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | CANC |
Jim Sly
|
|
|
kyle Phone #: ###-#### Dave Hannah called me and said it was done.
|
BLD-Framing/Rough-in | 2/11/2014 | 2/11/2014 | 2/12/2014 | P | PASS |
Dave Hannah
|
|
|
KYLE Phone #: ###-####
|
BLD-Footing | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PASS |
Dave Hannah
|
|
|
dan Phone #: ###-####
|
Plan Reviewer's activity | | | 1/15/2014 | | DONE |
Jason Blais
|
|
|
Building Official Modification approval attached to this case.
|
Issue PAID IN FULL permit | | | 1/14/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 12/30/2013 | | |
|
|
|
|
Plan assigned to (CJW) | 11/22/2013 | 11/22/2013 | 12/30/2013 | | PASS |
Carl Westfall
|
|
|
BSU CLASSROOMS - Level 3 TI - (20 days - Dec 17)
|
Telephone call | | | 12/30/2013 | | DONE |
Tisha Gallop
|
|
|
called Clinton Yaka and told him permit is ready, fee due, need GC form, ESC app filled out and declare valid RP.
|
Routing - PLAN CHECK | 12/27/2013 | | 12/30/2013 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/30/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 12/26/2013 | | 12/27/2013 | | PASS |
Craig D. Hanson
|
|
|
See fire plan report revision 1
|
Routing - PLAN CHECK | 12/23/2013 | | 12/26/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after the 2nd review.
|
Routing - PLAN CHECK | 12/19/2013 | | 12/23/2013 | | PEND |
Cheyne Weston
|
|
|
Waiting for revised drawings
|
Plan resubmittals received | | | 12/23/2013 | | DONE |
Christina Prado
|
|
|
Received one transmittal sheet and two sets of revised plans marked SD1.0, SD1.2, A1.1, A3.1, M1.0, M2.1 & E2.0L;Taken to Carl Westfall for further review
|
Routing - FIRE | 12/17/2013 | 12/17/2013 | 12/19/2013 | | FAIL |
Scott Arellano
|
|
|
See Fire Plan Report
|
1st review completed | | | 12/19/2013 | | FAIL |
|
|
|
Failed; Plan Check, Fire
|
Route to Impact Fee Review | 12/17/2013 | 12/20/2013 | 12/18/2013 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 11/26/2013 | | 12/17/2013 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - PLUMBING | 11/25/2013 | | 11/26/2013 | | PASS |
Bill VanDegrift
|
|
|
Tempered water required at public lavs. ISPC 413.1
Per plan and ISPC.
|
Routing - PLANNING | 11/26/2013 | | 11/26/2013 | | PASS |
Sue Cummings
|
|
|
Sue Cummings - CZC13-00250
|
Plan Reviewer's activity | | | 11/26/2013 | | DONE |
Jason Blais
|
|
|
No ACHD impact fees or inspection needed per email from Christy Little.
|
Routing PW Sewer Rating | 11/22/2013 | | 11/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 11/25/2013 | | 11/25/2013 | | PASS |
Peter J. McCullough
|
|
|
existing building with new enclosure
|
Routing - PUBLIC WORKS | 11/25/2013 | | 11/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 11/25/2013 | | 11/25/2013 | | PASS |
Andy J. Long
|
|
|
ESC waiver submitted and approved; need designate a Responsible Person for project.
|
Routing - Addressing | 11/22/2013 | | 11/22/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plan Reviewer's activity | | | 11/22/2013 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him check with ACHD for evaluation of any impact fees due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
|
Pending Assignment by JCB | 11/21/2013 | | 11/22/2013 | | DONE |
Jason Blais
|
|
|
|
Application received | | 11/20/2013 | 11/21/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/20/2013 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/20/2013 | | DONE |
Alexandra L. DeYoung
|
|
|
|