BLD-Final | 6/10/2014 | 6/11/2014 | 6/11/2014 | A | PASS |
Jim Storey
|
|
|
Garage code is 1224 Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
DOC - Permit Finaled | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | DONE |
Jim Storey
|
|
|
2.5Garage code is 1224 Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
BLD-Final | 4/25/2014 | 4/28/2014 | 4/28/2014 | A | CANC |
Dave Hannah
|
|
|
Braxton Phone #: ###-####
|
BLD-Energy code compliance | 2/20/2014 | 2/20/2014 | 2/20/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
BLD-Framing/Rough-in | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen pending hvac ok to insulate// headers over back bedroom windows need verified for size.
|
BLD-Wall Bracing | 2/7/2014 | 2/7/2014 | 2/7/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
BLD-Wall Bracing | 2/5/2014 | 2/7/2014 | 2/7/2014 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards No appr. plan on site
|
BLD-Foundation | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PART |
Tony Young
|
|
|
adam Phone #: ###-####,, upper (north) short wall footing ok
|
BLD-Foundation | 1/9/2014 | 1/10/2014 | 1/13/2014 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Foundation | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
PubWorks Subgrade Approval | 1/6/2014 | 1/6/2014 | 1/6/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | NR |
Jim Storey
|
|
|
Adam Phone #: ###-#### pending pw sign off
|
BLD-Footing | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | PART |
Dave Hannah
|
|
|
adam Phone #: ###-#### setbacks ok ground is frost free air temps are up ok to place using cold weather spects crew will use a 600lbs mix
|
Issue PAID IN FULL permit | | | 12/9/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 12/2/2013 | | |
|
|
|
|
Application received | | 11/20/2013 | 12/2/2013 | | DONE |
|
|
|
|
Routing - MECHANICAL | 12/2/2013 | | 12/2/2013 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/2/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 12/2/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 12/2/2013 | | DONE |
Tisha Gallop
|
|
|
called Seth and left vm permit is ready and fee due.
|
Routing - MECHANICAL | 11/29/2013 | | 11/29/2013 | | FAIL |
Troy James
|
|
|
emailed correction to TML
|
Route to Impact Fee Review | 11/27/2013 | 12/3/2013 | 11/27/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (PEP) | 11/26/2013 | 11/26/2013 | 11/27/2013 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 11/27/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/27/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 11/27/2013 | | DONE |
Christina Prado
|
|
|
Needs mechanical approval
|
Routing - PLAN CHECK | 11/25/2013 | | 11/27/2013 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (JG) | | 11/20/2013 | 11/26/2013 | | DEFR |
Javier Guzman
|
|
|
Due 12/03 L1
|
Routing - MECHANICAL | | | 11/25/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to TML
|
Routing - PLANNING | 11/21/2013 | | 11/22/2013 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 11/20/2013 | | 11/21/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 11/21/2013 | | 11/21/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 11/21/2013 | | 11/21/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 11/20/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/20/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/20/2013 | | DONE |
Christina Prado
|
|
|
|