Permanent Occupancy | | | 2/12/2014 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passsed
|
BLD-Final | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Jim Storey
|
|
|
after 9am // call before to meet // Amy Phone #: ###-####
|
BLD-Final | 11/25/2013 | 11/27/2013 | 11/27/2013 | P | FAIL |
Jim Storey
|
|
|
Please call ahead for access 5-10 min -Amy Cell- ###-#### Phone #: ###-#### Provide address, provide exit sign in warehouse, remove deadbolt, change hardware to single action, adjust the door strengh for opening, provide exit discharge lighting, provide sticker at main exit
|
FIRE-Final Inspection | 11/25/2013 | 11/26/2013 | 11/27/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide address, provide exit sign in warehouse, remove deadbolt, change hardware to single action, adjust the door strengh for opening, provide exit discharge lighting, provide sticker at main exit
|
Issue PAID IN FULL permit | | | 11/25/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 11/20/2013 | 11/20/2013 | 11/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review complete Airport buildng occ eval
|
Routing - PLAN CHECK | 11/22/2013 | | 11/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 11/22/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/22/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/22/2013 | | |
|
|
|
|
Telephone call | | | 11/22/2013 | | |
|
|
|
11-22-13 called Amy left message permit ready for pick up ///dld
|
Routing - PLAN CHECK | 11/20/2013 | | 11/21/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent to Amy 11/21/13
Amy, I have reviewed the documents that you submitted. As we do not have a floor plan for this building I will need you to submit a floor plan that shows the layout of the building. The floor plan does NOT need to be done by an architect. The floor plan will need to show all of the exterior walls, doors and openings in the exterior walls, the location of all of the interior walls and the intended use of each space. The plan will need to be drawn to scale or have all of the dimensions shown on the floor plan.
If you have any questions please let me know.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
City of Boise
###-####
|
1st review completed | | | 11/21/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | 11/20/2013 | 11/20/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/20/2013 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 2/22/2014 | | | |
|
|
|
|