BLD-Other | 2/18/2014 | 2/19/2014 | 2/19/2014 | A | PASS |
Mike Jordan
|
|
|
Mike, I have replace the existing window glass with tempered as required. Phone #: ###-#### >> Inspection requested via web by Miles Hash. Ok to occupy the remodeled offices on main sales floor. waiting on resubmittals for changes to the upstairs remodel.
|
BLD-Other | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | PART |
Mike Jordan
|
|
|
pre building final conference walk. thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash. Partial final only. Ok to occupy down stairs remodeled offices except for two offices were tempered glazing is required. Life/safety and other trades have been signed off. Architect trying to submit plan mod for changes upstairs, so partial final only in area noted above.
|
FIRE-Final Inspection | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Door hardware not installed yet but I went over requirements with superintendant.
|
BLD-Ceiling Grid Inspection | 2/7/2014 | 2/7/2014 | 2/7/2014 | P | DONE |
Jim Sly
|
|
|
Offices......OK
|
BLD-Ceiling Grid Inspection | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | CANC |
Mike Jordan
|
|
|
come in the north entry at the Toyota sign Phone #: ###-#### >> Inspection requested via web by Miles Hash. Moved to pm.
|
BLD-Framing/Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Jim Sly
|
|
|
call me to find area thanks Phone #: ###-#### >> Inspection requested via web by Miles Hash
|
Issue PAID IN FULL permit | | | 1/15/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 1/15/2014 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 1/15/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 1/13/2014 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 11/22/2013 | 11/22/2013 | 12/11/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 12/5 Toyota Petersons Motor
|
Routing - PLAN CHECK | 12/11/2013 | | 12/11/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/4/2013 | | 12/9/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
the product data uploaded for the eggcrate material is not the same product identified on the plans.
|
Routing - PLAN CHECK | 11/22/2013 | | 12/2/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
1st review completed | | | 12/2/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 11/22/2013 | | 11/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 11/22/2013 | | 11/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 11/22/2013 | | 11/22/2013 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 11/20/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 20 2013 1:11PM
|