Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-03263
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 380 E PARKCENTER BLVD Unit: 300
Project NameBusiness Psychology Associates
Customer Number 
ePlanReviewYes
Description
(Business Psychology Associates)(Suite 300) Permit for interior remodel of existing tenant space. This area was last renovated under BLD06-01745. The core restrooms on this floor were upgraded under BLD10-00665. Scope of work included; move existing hard walled office's to create open floor plan per approved plans. The new tenant layout includes a relocated Break Room, new Conference Rooms and remodeled entry. The existing lighting will be removed and replaced with new fixtures. The existing celling grid will remain. This project will be in 2 phases. Exit signage relocated for new entry and exit from tenant space per the reflective ceiling plan. NOTE: This building is fully fire sprinklered for one-hour substitution. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/10/20144/4/2014 DONE
DetailsChristina Prado
completed 4-4-14
First Notice3/27/20143/27/20143/31/2014 DONE
DetailsJim Storey
mailed 4-1-14
Letter of compliance/Occupancy  3/28/2014 DONE
BLD-Final3/26/20143/27/20143/27/2014APASS
DetailsJim Storey
call before // Gil Phone #: ###-####
DOC - Permit Finaled3/27/20143/27/20143/27/2014PPASS
DetailsJim Storey
FIRE-Final Inspection3/26/20143/27/20143/27/2014APASS
DetailsForrest France
Phase two completed. Final fire life safety inspection passed.
BLD-Ceiling Grid Inspection3/5/20143/6/20143/6/2014APASS
DetailsJim Storey
Gill-Late am please and please call at least 30 mins prior to insepction Phone #: ###-#### pending ele aproval
BLD-Framing/Rough-in2/19/20142/20/20142/20/2014APASS
DetailsJim Storey
dale - call prior Phone #: ###-####
BLD-Final2/6/20142/7/20142/7/2014APASS
DetailsJim Storey
gail Phone #: ###-#### ok to occ office temp wall in place for phase 1.
FIRE-Final Inspection2/6/20142/7/20142/7/2014APART
DetailsForrest France
Phase one TI work at the north half as defined by the temp wall passed life safety walkthrough.
BLD-Final2/4/20142/5/20142/5/2014ANR
DetailsJim Storey
call 1/2 hr before // phase 1 only // Gill Phone #: ###-####
FIRE-Final Inspection2/4/20142/5/20142/5/2014APART
DetailsForrest France
On site discussion with contractor regarding completion of phase one work and area separation between phases to maintain fire protection.
BLD-Ceiling Grid Inspection1/6/20141/7/20141/7/2014APASS
DetailsJim Storey
gale - please call 20 minutes prior Phone #: ###-####
FIRE-Conference12/18/201312/19/201312/19/2013ADONE
DetailsForrest France
On site conference regarding existing fire sprinkler system coverage at the remodel area.
BLD-Framing/Rough-in12/11/201312/11/201312/11/2013PPASS
DetailsJim Storey
Please call 20min - Early afternoon - Gil Phone #: ###-####
Issue PAID IN FULL permit  12/4/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  12/4/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  12/3/2013 DONE
DetailsTisha Gallop
Plan assigned to (AJS)11/21/201311/21/201312/2/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 12/4 Level II Business Psychology Association
Routing - PLAN CHECK11/21/2013 12/2/2013 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan
Routing - PUBLIC WORKS11/21/2013 12/2/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating12/2/2013 12/2/2013 PASS
DetailsConnie Baumgartner
1st review completed  12/2/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK12/2/2013 12/2/2013 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  12/2/2013 DONE
Routing - Addressing11/21/2013 11/21/2013 PASS
DetailsEmily Dixon
Intake Approval  11/21/2013 PASS
DetailsAdele J Schaffeld-Griffin
Application received  11/20/2013 DONE
Application submitted via PDS Online on Nov 20 2013 1:40PM